
Planning, distribution and installation of racking systems, multi-storey installations and steel platforms with rack inspections according to DIN EN 15635.

Gohl Lager und Betriebseinrichtungen
Brettergartenstr. 14, 90427 NürnbergNew on Amplifa
About Gohl Lager und Betriebseinrichtungen
Gohl Lager und Betriebseinrichtungen is a family-run company based in Nuremberg that has been active in the installation of storage and operating equipment since 2004. Founded as an installation company for racking and cabin systems, the company developed into a full-service provider offering consulting, planning, delivery, installation, conversion, dismantling, repair and rack inspection from a single source. Its portfolio includes boltless shelving, cantilever, pallet, wide-span, office and dynamic racking as well as special racking, multi-storey installations, space systems, two-storey installations and structural steel system platforms. As a registered specialist retail partner of META Regalsysteme, Gohl distributes and installs, among other things, the multi-storey installations META LEVEL CL (up to 4 levels, frame height up to 12,000 mm) and META LEVEL I / MULTIFLOOR (up to 6 levels, frame height up to 15,000 mm, bay load up to 8,000 kg). The structures are predominantly made of steel, galvanized as standard or in RAL 7035; shelf decking is chipboard or grating. Customers come from industry, retail, trades, logistics and wholesale, including Siemens, Kuehne + Nagel, Hilti, Grammer, Geis and Liebherr. The company serves more than 500 customers nationwide as well as in Austria for many years.
- Site
- Nürnberg
- Processes
- Installation of storage and operating equipment (racking and cabin systems), Rack inspection according to DIN EN 15635 and DGUV 108-007, Installation service for racking systems (single rows to large projects), Planning and consulting service for warehouses (needs assessment, planning, drawings), Structural steel & system platforms, Conversions and extensions of existing racking systems, Dismantling and relocation of racking systems, Repairs and restoration of racking systems
- Materials
- Steel (racking and structural steel constructions, galvanized / RAL 7035), Chipboard (level decking), Grating / wire mesh (level decking), Steel (galvanized / RAL 7035), Chipboard, Grating / wire mesh
- Certificates
- Rack inspection DIN EN 15635 / DGUV 108-007
- Founded
- 2004
- Industries
- Industry, Retail, Trades, Logistics, Wholesale
- 01
Needs assessment and on-site consulting
- 02
Storage planning and project engineering with drawings
- 03
Distribution and delivery of the racking systems
- 04
Installation by in-house installation teams
- 05
Conversion, extension, dismantling or repair
- 06
Annual rack inspection and long-term support
Materials and Processes
Steel (galvanized / RAL 7035)
Racking and structural steel constructions, galvanized as standard, optionally coated in RAL 7035 or special colors.
Chipboard
Decking for multi-storey installations; adjustable shelves in 25 mm increments.
Grating / wire mesh
Decking variant for multi-storey installations and wire mesh shelf decking.
Locations
Nuremberg
DEHeadquarters with planning, sales and installation organization
- Materials
- Steel
Installations and Systems



Inside the production
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Installation of storage and operating equipment (racking and cabin systems)Installation | – | – | – | – | Steel |
| Rack inspection according to DIN EN 15635 and DGUV 108-007Testing | – | – | – | – | – |
| Installation service for racking systems (single rows to large projects)Installation | – | – | – | – | Steel |
| Planning and consulting service for warehouses (needs assessment, planning, drawings)Engineering | – | – | – | – | – |
| Structural steel & system platformsInstallation | – | – | – | – | Steel |
| Conversions and extensions of existing racking systemsInstallation | – | – | – | – | – |
| Dismantling and relocation of racking systemsInstallation | – | – | – | – | – |
| Repairs and restoration of racking systemsInstallation | – | – | – | – | – |
| Installation | – | 1,700 mm (shelf length) × 900 mm (frame depth) × 12,000 mm (frame height) | 4,400 kg (bay load) | – | Steel, Chipboard, Grating |
| Installation | – | 2,700 mm (shelf with wide-span system) × 15,000 mm (frame height) | 8,000 kg (bay load) | – | Steel, Chipboard, Grating |
| Two-storey installations (2-level space solutions, below/on structural steel platforms)Installation | – | – | – | – | Steel |
| Installation | – | – | – | – | Steel |
Additional services
Reference customers
Quality and Standards
Gohl carries out the legally required annual rack inspections according to DIN EN 15635 and DGUV 108-007 and installs in compliance with the applicable regulations. Multi-storey installations are structurally designed on a project-specific basis.
| Evidence | Nuremberg |
|---|---|
| Rack inspection DIN EN 15635 / DGUV 108-007 |
History
- 2004
Founded as an installation company for racking and cabin systems; first projects with Dexion GmbH.
- 2010
Expansion of the range of services to include the distribution of high-quality racking systems.
- 2015
Focus on own customers and expansion of the Nuremberg site; since then continuous growth of the customer base (today over 500 customers).