
Planning, installation, maintenance and inspection of ventilation, air conditioning and filter technology as well as heat pump conversion.

HAGRO Technik Gesellschaft für Filter- und Lüftungstechnik GesmbH
1220 Vienna (Headquarters)New on Amplifa
About HAGRO
HAGRO Technik is a filter and ventilation technology company founded in Vienna in 1991, headquartered at Maculangasse in Vienna-Donaustadt. Its service portfolio covers the design, planning, delivery, installation and commissioning of ventilation and air conditioning systems as well as their maintenance, cleaning and condition assessment. Products and systems include supply and extract air units and modular units, fans, single-split, multi-split and multi-V air conditioning systems, extraction hoods, extraction systems, fire dampers, door air curtains, filter technology as well as exhaust air purification with UV light and ozone. Air conditioning technology has been offered since 2017, and conversion of conventional heating systems to heat pumps since 2022. In addition to installation, HAGRO performs legally mandated inspections: condition assessments in accordance with the Austrian Working Premises Regulation, inspections under the Refrigeration Systems Regulation, fire damper inspections according to ÖNORM H6031 as well as hygiene inspections according to VDI 6022. Customers come from healthcare, industry, gastronomy, hospitality, construction, retail and property management, including public clients such as the City of Vienna and the Vienna Hospital Association.
- Site
- Wien
- Processes
- Design, planning and conceptualization of ventilation and air conditioning systems, Installation of ventilation and air conditioning systems, Commissioning of ventilation and air conditioning systems, Maintenance of ventilation systems incl. air hygiene and fire protection cleaning,, Maintenance of air conditioning systems incl. mechanical cleaning and disinfection, inspection, Maintenance and inspection of fire dampers according to ÖNORM H6031, Condition assessment in accordance with §13 of the Working Premises Regulation (AStV), Statutory inspection in accordance with §22 and §23 of the Refrigeration Systems Regulation
- Materials
- Design and specialist planning for HVAC/AC systems, Fire dampers and fabric connectors, Filter technology, Heat pump conversion
- Certificates
- Inspections according to ÖNORM H6031 (fire dampers), Hygiene inspection according to VDI 6022, Condition assessment §13 AStV / Inspection §22, §23 KAV, ANKÖ / HFU list
- Founded
- 1991
- Industries
- Healthcare, Industry & Production, Gastronomy, Hospitality, Construction, Retail
- 01
Design and planning
- 02
Delivery
- 03
Installation and commissioning
- 04
Maintenance, cleaning and filter replacement
- 05
Inspection and condition assessment according to legal requirements
Technology & Systems
Design and specialist planning for HVAC/AC systems
Design of ventilation and air conditioning systems including modernization and energy efficiency analysis of existing systems.
Fire dampers and fabric connectors
Delivery, installation and inspection according to ÖNORM H6031 as protection against the spread of fire and smoke in ventilation ducts.
Filter technology
Dust, grease and activated carbon filters as well as exhaust air purification with UV light and ozone for industry, gastronomy and healthcare facilities.
Heat pump conversion
Since 2022, conversion of conventional heating systems to heat pumps.
Locations
1220 Vienna
ATHeadquarters
Systems & Components




Inside the production








Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Design, planning and conceptualization of ventilation and air conditioning systemsEngineering | – | – | – | – | – |
| Installation of ventilation and air conditioning systemsInstallation | – | – | – | – | – |
| Commissioning of ventilation and air conditioning systemsInstallation | – | – | – | – | – |
| Maintenance of ventilation systems incl. air hygiene and fire protection cleaning,Installation | – | – | – | – | – |
| Maintenance of air conditioning systems incl. mechanical cleaning and disinfection, inspectionInstallation | – | – | – | – | – |
| Maintenance and inspection of fire dampers according to ÖNORM H6031Inspection | – | – | – | – | – |
| Condition assessment in accordance with §13 of the Working Premises Regulation (AStV)Inspection | – | – | – | – | – |
| Statutory inspection in accordance with §22 and §23 of the Refrigeration Systems RegulationInspection | – | – | – | – | – |
| Hygiene inspections according to VDI 6022 with airborne germ measurement, contact plate tests andInspection | – | – | – | – | – |
| Conversion of ventilation systems to energy-efficient systems / modernization of HVAC systemsEngineering | – | – | – | – | – |
| Conversion of heating systems to heat pumpsInstallation | – | – | – | – | – |
| Delivery and installation of ventilation systems (supply/extract air units, compact units, modularInstallation | – | – | – | – | – |
| Delivery of fans (duct fans, tube fans, axial fans, roof fans, EC fans)Installation | – | – | – | – | – |
| Extraction systems (stationary and mobile) with filter technology for vapors, smoke, dust, exhaustInstallation | – | – | – | – | – |
| Extraction hoods (gas extraction/kitchen extraction) for laboratory technology, underground garagesInstallation | – | – | – | – | – |
| Delivery of single-split, multi-split and multi-V air conditioning systems (VRV systems)Installation | – | – | – | – | – |
| Delivery and installation of fire dampers (static/dynamic) and fabric connectors incl.Installation | – | – | – | – | – |
| Filter technology: dust filters (bag filters/filter cells), grease filters (metal filters),Installation | – | – | – | – | – |
| Exhaust air purification with UV light (UV odor neutralization and air disinfection)Surface | – | – | – | – | – |
| Exhaust air purification with ozone (oxidation of grease and odor carriers)Surface | – | – | – | – | – |
| Air ionizationSurface | – | – | – | – | – |
| Delivery and installation of door air curtains (electric and water-based systems)Installation | – | – | – | – | – |
| Delivery of swimming pool dehumidification units and residential ventilation unitsInstallation | – | – | – | – | – |
| Conversion to heat pumps/photovoltaicsInstallation | – | – | – | – | – |
| Special ventilation systems for rooms with medical useEngineering | – | – | – | – | – |
Additional services
Quality & Standards
HAGRO performs legally mandated inspections: condition assessment in accordance with §13 of the Working Premises Regulation, inspection in accordance with §§22/23 of the Refrigeration Systems Regulation, fire damper inspections according to ÖNORM H6031 as well as hygiene inspections according to VDI 6022 with airborne germ measurement and microbiological analysis. The company is listed in ANKÖ and in the HFU list.
| Evidence | 1220 Vienna |
|---|---|
| Inspections according to ÖNORM H6031 (fire dampers) | |
| Hygiene inspection according to VDI 6022 | |
| Condition assessment §13 AStV / Inspection §22, §23 KAV | |
| ANKÖ / HFU list |
History
- 1991
Company founded in Vienna Margareten; specialization in the design, installation, maintenance and condition assessment of filter and ventilation systems.
- 2017
Portfolio expanded to include the design, installation, maintenance and condition assessment of air conditioning systems.
- 2022
Portfolio expanded to include the conversion of conventional heating systems to heat pumps.