
Construction and maintenance of energy cable systems, switchgear installations and electrical installations up to 30 kV in the Prignitz region.

Hans Garkisch Elektro-Anlagenbau GmbH
Perleberg · DENew on Amplifa
About Hans Garkisch Elektro-Anlagenbau
Hans Garkisch Elektro-Anlagenbau GmbH is a medium-sized electrical company from the Prignitz region, founded in Perleberg in 1951. The company, with 25 employees and 3 apprentices, constructs energy cable systems and switchgear installations from 0.4 kV to 30 kV, reconstructs transformer substations, lays underground and telecommunication cables, and carries out overhead line construction including assembly and disassembly. Further areas of service include electrical installations for new residential construction and renovation of old buildings, street lighting systems, construction power supplies, as well as delivery and connection of electric charging stations. In addition, the company offers project engineering services, maintenance and servicing, as well as testing and acceptance of electrical installations in accordance with utility (EVU) guidelines. With its own machinery fleet – from mini excavators and wheel loaders to ground rocket technology, aerial work platforms and cranes – all construction projects are executed in-house from order to handover, without subcontractors. Clients include regional and supraregional customers from the energy sector, civil engineering and building services.
- Site
- Perleberg
- Processes
- Construction of electrical installations / electrical installation up to 1 kV, Medium-voltage assembly up to 30 kV, Overhead line assembly up to 30 kV (assembly and disassembly), Construction of switchgear installations and stations from 0.4 kV to 30 kV, Reconstruction of transformer substations, Civil engineering services, underground cable laying / cable laying, Laying of telecommunication cables and jointing work, Project engineering services for energy installations up to 30 kV
- Materials
- Medium-voltage technology up to 30 kV, Low-voltage technology up to 1 kV, Civil engineering and cable laying
- Certificates
- Qualifications for live-line work up to 1 kV, Qualifications for medium-voltage assembly up to 30 kV, ISO 9001
- Founded
- 1951-04-05
- Employees
- 25
- Industries
- Electrical engineering, Energy supply, Civil engineering, Building services
- 01
Project engineering
- 02
Civil engineering and underground cable laying
- 03
Cable and station assembly
- 04
Electrical installation
- 05
Testing and acceptance
- 06
Maintenance and servicing
Service Areas and Technology
Medium-voltage technology up to 30 kV
Construction of energy cable systems, switchgear installations and stations from 0.4 kV to 30 kV.
Low-voltage technology up to 1 kV
Electrical installation, live-line work and testing in accordance with utility (EVU) guidelines.
Civil engineering and cable laying
Earthworks and trench excavation for energy and telecommunication cables within a radius of approx. 100 km.
Locations
Perleberg
DEOperating site
- Materials
- Energy cable systems, switchgear installations, electrical installation
- Mini excavator
- Wheel loader
- Ground rocket technology
- Compressors
- Hydraulic lifting platform (reach 11 m, 17 m and 18 m)
- Crane 11 t with aerial work platform up to 26 m
- Unimog with loading arm
- Trucks
- Cable laying trailers 2.5 t and 6.0 t
- Light commercial vehicles
- Service vehicles with service trailer
- Transport trailers 3.5–8 t
- Hilti drilling technology and core drilling equipment
- Grounding impact device
- Measuring technology for testing and acceptance up to 1.0 kV
Services



Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Construction of electrical installations / electrical installation up to 1 kVAssembly | – | – | – | – | – |
| Medium-voltage assembly up to 30 kVAssembly | – | – | – | – | – |
| Overhead line assembly up to 30 kV (assembly and disassembly)Assembly | – | – | – | – | – |
| Construction of switchgear installations and stations from 0.4 kV to 30 kVAssembly | – | – | – | – | – |
| Reconstruction of transformer substationsAssembly | – | – | – | – | – |
| Civil engineering services, underground cable laying / cable layingAssembly | – | – | – | – | – |
| Laying of telecommunication cables and jointing workAssembly | – | – | – | – | – |
| Project engineering services for energy installations up to 30 kVEngineering | – | – | – | – | – |
| Project engineering services for street lighting systemsEngineering | – | – | – | – | – |
| Construction of street lighting systemsAssembly | – | – | – | – | – |
| Construction and testing of construction power suppliesTesting | – | – | – | – | – |
| Maintenance and servicing of energy cable networks, switchgear installations and stations up to 30Assembly | – | – | – | – | – |
| Delivery and connection of electric charging stations for electric vehiclesAssembly | – | – | – | – | – |
| Testing and acceptance of completed electrical installations up to 1.0 kVTesting | – | – | – | – | – |
| Live-line work up to 1 kVAssembly | – | – | – | – | – |
19 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Mini excavator | – | – | – | – | Perleberg |
| Wheel loader | – | – | – | – | Perleberg |
| Ground rocket technology | – | – | – | – | Perleberg |
| Compressors | – | – | – | – | Perleberg |
| Hydraulic lifting platform | – | – | Reach up to 11m, 17m and 18m | – | Perleberg |
| Crane 11t with aerial work platform | – | – | Aerial work platform up to 26m | – | Perleberg |
| Unimog with loading arm | Mercedes-Benz Unimog | – | – | – | Perleberg |
| Trucks | – | – | – | – | Perleberg |
| Cable laying trailers | – | – | – | – | Perleberg |
| Light commercial vehicles (including equipment for 30 kV assembly, station construction and | – | – | – | – | Perleberg |
| Service vehicles with service trailer | – | – | – | – | Perleberg |
| Transport trailers 3.5t - 8t | – | – | – | – | Perleberg |
| Pole transport trailers | – | – | – | – | Perleberg |
| Tipper trailers | – | – | – | – | Perleberg |
| Low-bed trailers for small loads | – | – | – | – | Perleberg |
| Hilti drilling technology | Hilti | – | – | – | Perleberg |
| Hilti core drilling equipment | Hilti | – | – | – | Perleberg |
| Grounding impact device | – | – | – | – | Perleberg |
| Measuring technology for testing and acceptance of electrical installations up to 1.0 kV (according | – | – | – | – | Perleberg |
Additional services
Quality and Testing
Testing and acceptance of completed electrical installations up to 1.0 kV is carried out with the company's own measuring technology in accordance with the guidelines of the utility companies (EVU). The equipment with tools and work equipment complies with the requirements of the employers' liability insurance association (Berufsgenossenschaft).
| Evidence | Perleberg |
|---|---|
| Qualifications for live-line work up to 1 kV | |
| Qualifications for medium-voltage assembly up to 30 kV | |
| ISO 9001 |
Company History
- 1951
Company founded as a master craftsman business by Hans Garkisch on 05.04.1951
- 1972
Expropriation
- 1991
Restitution