Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
HAUPT – Fertigung

Manufacturing turnkey cooling systems, large-scale heat pumps and compressed air systems as ready-to-use technical containers with ammonia.

HAUPT Logo

HAUPT Kühlsysteme GmbH

Wilhelmsthal-Steinberg (administration) · Wilhelmsthal-Steinberg (manufacturing)New on Amplifa

1990Founded
HRB 6379, Amtsgericht CoburgCommercial register
up to 15 m × 3.95 mContainer sizes
950 kW (33 t)Largest system manufactured
1300 kW / 1800 kWReference capacities heat/cooling

The family business since 1990

HAUPT Kühlsysteme GmbH is a family business founded in 1990 and based in Wilhelmsthal-Steinberg in Upper Franconia. The company plans, designs and manufactures industrial cooling systems, single- and two-stage industrial and large-scale heat pumps using the natural refrigerant ammonia, air conditioning technology, compressed air technology as well as electrical and control engineering. Its core product is turnkey ready-to-use container systems, which can be up to 15 m long and 3.95 m wide and are pre-fabricated completely in the company's own production facility, including peripherals, pump groups, load and control cabinets and safety equipment. In addition, HAUPT offers piping construction in stainless steel, steel, copper and plastics, cooling water treatment, heat recovery, control cabinet construction and PLC programming. Customers include data centers, the glass and construction industries, energy and heat suppliers, and municipalities for district heating networks. The range is completed by installation, commissioning and a 24/7 service with maintenance contracts, spare parts supply and remote maintenance.

Site
Wilhelmsthal-Steinberg
Processes
Ammonia chillers, Absorption and adsorption chillers, Recooling systems and cooling water systems (cooling towers, dry and adiabatic coolers), Cooling water treatment and conditioning, Heat recovery, Special systems construction (industrial and large-scale heat pumps, cooling systems), Air-to-water large-scale heat pumps (ammonia), Water-to-water heat pumps (ammonia)
Materials
Ammonia (NH3), Stainless steel, Steel (carbon steel), Copper, PVC-U/C, PE, PP
Certificates
DIN EN ISO 9001:2015, DIN EN ISO 14001:2015, Expert inspection of ammonia systems, Testing according to DGUV3 / VDE 0100-600
Founded
1990
Industries
Data centers/IT, Glass industry, Construction industry (supplier), Energy and heat suppliers, Municipalities/district and local heating, Industry and trade
  1. 01

    Planning and consulting

  2. 02

    Engineering

  3. 03

    Special systems construction / pre-fabrication at the factory

  4. 04

    Quality assurance and expert inspection

  5. 05

    Installation and commissioning

  6. 06

    Maintenance, remote maintenance and 24/7 service

Materials and processes

NH3

Ammonia (NH3)

Natural, climate-neutral refrigerant for chillers and large-scale heat pumps with no greenhouse or ozone depletion potential.

V2A

Stainless steel

Welded piping according to DIN EN ISO 9606-1 (TIG) as well as press-fit systems.

C-Stahl

Steel (carbon steel)

Welded piping according to DIN EN 287-1 (oxy-fuel) and press-fit systems.

Cu

Copper

Press-fit systems in piping construction.

PE

PE

PE electrofusion welding as well as cooling water tank manufacturing.

PP

PP

Cooling water tank manufacturing depending on application.

PVC-U/C

PVC-U/C

Pressure piping systems and cooling water tanks.

Locations

Wilhelmsthal-Steinberg (administration)

DE

Company headquarters / administration

Standort Wilhelmsthal-Steinberg (manufacturing)

Wilhelmsthal-Steinberg (manufacturing)

DE

Manufacturing / production

Part weight / size
up to 33 t total system (reference project)
Lot size
Single systems / custom construction
Materials
Ammonia, stainless steel, steel, PE, PP, PVC
  • Technical container manufacturing up to 15 m × 3.95 m
  • Siemens PLC S7 with HMI touch screen
  • Cooling water tank manufacturing in PE/PP/PVC

Systems and projects

Container system with ammonia large-scale heat pump (1300 kW)
Container system with ammonia large-scale heat pump (1300 kW)Special systems construction · Energy supply
Chilled water central plant for AI data center (1200 kW)
Chilled water central plant for AI data center (1200 kW)Container system construction · Data centers
Recooling system in technical container (1800 kW)
Recooling system in technical container (1800 kW)Container system construction · Glass industry
Ammonia air-to-water large-scale heat pump (950 kW, district heating)
Ammonia air-to-water large-scale heat pump (950 kW, district heating)Special systems construction · Municipal heat supply
Service technology in system operation
Service technology in system operationInstallation and service · After Sales

Inside the production

System technology and manufacturing at the Wilhelmsthal-Steinberg site
System technology and manufacturing at the Wilhelmsthal-Steinberg site
24/7 service and commissioning
24/7 service and commissioning
Quality and environmental management certification
Quality and environmental management certification

Industries

Data centers/ITGlass industryConstruction industry (supplier)Energy and heat suppliersMunicipalities/district and local heatingIndustry and tradeProduction hallsOffice and commercial buildings

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Ammonia chillersEngineering––––Ammonia
Absorption and adsorption chillersEngineering–––––
Recooling systems and cooling water systems (cooling towers, dry and adiabatic coolers)Engineering–––––
Cooling water treatment and conditioningEngineering–––––
Heat recoveryEngineering–––––
Special systems construction (industrial and large-scale heat pumps, cooling systems)Engineering–15 m (container length) × 3.95 m (container width)33 tonnes (total system, reference–Ammonia
Air-to-water large-scale heat pumps (ammonia)Engineering–––100 kW heating capacity – several megawattsAmmonia
Water-to-water heat pumps (ammonia)Engineering––––Ammonia
Air conditioning technology (data centers, precision climate systems, humidification systems,Engineering–––––
Compressed air supply systems (compressed air stations) incl. heat recovery, extraction systemsEngineering–––––
Piping construction: welded stainless steel and steel piping according to DIN EN ISO 9606-1 (TIG)Joining––––Stainless steel, Steel
Press-fit systems in stainless steel, carbon steel and copperJoining––––Stainless steel, Carbon steel, Copper
PVC-U/C pressure piping systemsJoining––––PVC-U, PVC-C
PE electrofusion weldingJoining––––PE
Cooling water tank manufacturing in PE, PP, PVCPlastics––––PE, PP, PVC
Electrical and control engineering: installations, control cabinet construction, PLC programmingAssembly–––––
Assembly and installation of turnkey container systems incl. commissioningAssembly–15 m × 3.95 m–––
Service: fault troubleshooting, system maintenance, commissioning, spare parts supply (24/7)Assembly–––––

6 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Technical container (special systems manufacturing)HAUPT Kühlsysteme–up to 15 m length, 3.95 m width (reference: 12x3 m, 6x3 m, 15x4 m, 11x3.5 m)–Wilhelmsthal-Steinberg (manufacturing Weißanger 15)
Siemens PLC S7 with HMI touch screen (control technology)Siemens S7–––Wilhelmsthal-Steinberg
Ammonia chiller (water-cooled, reference project)––600 kW nominal cooling capacity––
Absorption chiller (hot-water operated, reference project)––600 kW––
Air-to-water large-scale heat pump (two-stage, ammonia, reference project)––950 kW nominal heating capacity, 33 t total system–Mertingen
Ammonia large-scale heat pump (two-stage, reference project)––1300 kW nominal heating capacity, container 11.0 x 3.5 m––

Additional services

Planning and consultingEngineeringSpecial systems constructionManufacturing (ready-to-use container systems)InstallationCommissioning24/7 service and 24-hour hotlineMaintenance and maintenance contractsFault troubleshootingSpare parts supplyRemote maintenance and monitoring systemsElectrical and control engineering (PLC, control cabinet construction)Piping constructionCooling water treatment and conditioningHeat recoveryApprenticeships (mechatronics technician for refrigeration technology, electronics technician for

Reference customers

AI data center WürzburgSupplier to the construction industryCustomer from the glass industryEnergy supplier (ammonia large-scale heat pump 1300 kW)Town of Mertingen (district heating, 950 kW air-to-water large-scale heat pump)

Quality

Work is carried out according to a certified integrated management system (DIN EN ISO 9001:2015 and 14001:2015). Ammonia container systems are inspected and monitored by an independent expert throughout the entire assembly before commissioning.

EvidenceWilhelmsthal-Steinberg
DIN EN ISO 9001:2015
DIN EN ISO 14001:2015
Expert inspection of ammonia systems
Testing according to DGUV3 / VDE 0100-600

History

  1. 1990

    Foundation of the family business; development into a pioneer and competence partner for energy-efficient applications and systems.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo