
Manufacturer of prefabricated steel inspection pits for automotive, rail vehicle and construction machinery workshop pits
HDC-Fertiggruben GmbH
Troisdorf (headquarters/production) · Reutlingen (technical consulting south)New on Amplifa
About HDC-Fertiggruben
HDC-Fertiggruben GmbH, headquartered in Troisdorf (North Rhine-Westphalia), is a manufacturer of prefabricated pits, inspection pits, maintenance pits and service pits made of steel for car workshops, commercial vehicle workshops, rail vehicles and construction machinery. The INNOFLEX product family of steel prefabricated pits features a containment system for water-polluting liquids and holds a general building authority approval (DIBt, Z-38.5-300). All pits are equipped as standard with a hard plastic floor (PowerFloor); built-in cabinets with stainless steel sliding doors are available as options. The service portfolio covers construction planning and assessment of the structural requirements, manufacturing, installation by an in-house installation team, acceptance, maintenance, as well as custom special and industrial solutions such as the retrofit installation of roller covers. The portfolio is complemented by oil dispensing equipment, oil management systems, workshop accessories, a 3D pit configurator, tender texts (GAEB) and a mobile demo service with a demonstration pit.
- Site
- Troisdorf
- Processes
- Manufacturing of steel prefabricated pits ("INNOFLEX"), Assembly/installation of prefabricated pits by in-house installation team, Retrofit installation of roller covers in existing pits, Manufacturing of prefabricated pits with hard plastic floor (PowerFloor), Custom special and industrial solutions, Installation of working pits in existing workshops, Assembly/installation by installation team, Construction planning and assessment of structural requirements
- Materials
- Steel, Hard plastic, Stainless steel, Hard plastic (PowerFloor)
- Certificates
- Specialist company under the Federal Water Act (WHG) (TÜV certification), General building authority approval (DIBt) steel prefabricated pits 'INNOFLEX', Specialist company under the Federal Water Act (WHG) (TÜV), General building authority approval DIBt Z-38.5-300
- Industries
- Car workshops, Commercial vehicle workshops, Rail vehicles, Construction machinery, Transport companies, Inspection lanes/DEKRA inspection
- 01
Construction planning and assessment of the structural requirements
- 02
Manufacturing of the steel prefabricated pit (INNOFLEX)
- 03
Installation by in-house installation team
- 04
Joint acceptance/quality assurance
- 05
Maintenance and accessories equipment
Materials & Processes
Steel
Base material of the building-authority-approved INNOFLEX steel prefabricated pits with containment system for water-polluting liquids.
Hard plastic (PowerFloor)
Standard pit floor, sound-absorbing, resistant to mechanical stress and partially replaceable.
Stainless steel
Optional for sliding doors (left/right) of the built-in cabinets of the prefabricated pit.
Sites

Troisdorf
DEHeadquarters and production (Biberweg 32)
- Materials
- Steel, hard plastic, stainless steel
Reutlingen
DETechnical consulting south (Zum Wäldle 11)
Prefabricated Pits & Components








Inside the production


Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Manufacturing of steel prefabricated pits ("INNOFLEX")Assembly | – | – | – | – | Steel |
| Assembly/installation of prefabricated pits by in-house installation teamAssembly | – | – | – | – | – |
| Retrofit installation of roller covers in existing pitsAssembly | – | – | – | – | – |
| Manufacturing of prefabricated pits with hard plastic floor (PowerFloor)Plastics | – | – | – | – | Hard plastic |
| Custom special and industrial solutionsAssembly | – | – | – | – | – |
| Installation of working pits in existing workshopsAssembly | – | – | – | – | Steel |
Additional services
Reference customers
Quality & Certifications
Regular in-house quality controls are supplemented by certification of each individual pit; every HDC prefabricated pit receives a so-called lifetime record file. Installation is carried out by a trained installation team with subsequent joint acceptance for quality assurance.
| Evidence | Troisdorf |
|---|---|
| Specialist company under the Federal Water Act (WHG) (TÜV) | |
| General building authority approval DIBt Z-38.5-300 |
History
- 2018
First general building authority approval of the INNOFLEX steel prefabricated pits by the DIBt on 23 February 2018.
- 2023
Renewal of the general building authority approval Z-38.5-300 by the DIBt (valid until 30 March 2028).