Manufacturer of precast concrete: shafts, staircases, angle retaining wall elements and solar substructures

HIEBER Betonfertigteilwerk GmbH
Wörleschwang · Pegau · Munich · KrefeldNew on Amplifa
About HIEBER Betonfertigteilwerk
HIEBER Betonfertigteilwerk GmbH has been developing and producing precast concrete elements and building materials for over 60 years. The product range includes daylight shaft systems, basement window systems, elevator shaft systems, precast staircases including designer staircases, precast balconies, pump sump shafts, angle retaining wall elements, grid stones (Noppensteine) and block steps. Since the introduction of the ENERGIE product line, the company also manufactures free-standing solar substructures made of concrete as well as foundations for charging stations and heat pumps. Production is carried out in concrete grades such as C 30/37 and C 30/37 LP, among others as architectural exposed concrete in grey, anthracite or white, partly sand-blasted or with a slate texture; displacement anchors are made of stainless steel. The portfolio ranges from series products to custom and special fabrications such as fire protection walls, retaining walls and special constructions. Customers are found in building construction, civil engineering, landscaping, bridge construction, energy applications and logistics. Company locations are the main plant in Wörleschwang (Bavaria) and a plant in Pegau near Leipzig, complemented by branch offices in Munich and Krefeld.
- Site
- Wörleschwang
- Processes
- Precast concrete production (daylight shaft systems, basement window systems, elevator shaft, Custom fabrication of concrete staircases (bicycle ramp staircases, three-flight staircases, spiral, Custom concrete fabrications (fire protection walls, retaining walls, foundations, special, Assembly of precast concrete elements (assembly instructions, assembly videos, factory-side, Quality monitoring of raw materials, production processes and products by independent institutes, Sandblasting of concrete surfaces (fence posts, block steps sand-blasted), Custom fabrications, Single-piece fabrication of concrete staircases
- Materials
- Concrete C 30/37, Concrete C 30/37 LP, Stainless steel (displacement anchors), Architectural exposed concrete (grey, anthracite, white), Concrete with slate texture
- Certificates
- In-house monitoring plus independent monitoring by Argus CERT Bau, quality, In-house monitoring, Monitoring by Argus CERT Bau (from 2026), Quality assurance for concrete and precast plants BW/Saxony (from 2026)
- Industries
- Building construction, Civil engineering/landscaping and garden construction, Energy (photovoltaics, charging infrastructure, heat pumps), Bridge construction, Logistics, Logistics (DHL logistics center Leipzig/Halle)
- 01
Planning and tender documents
- 02
Precast concrete production
- 03
Quality monitoring by in-house and external inspection
- 04
Delivery
- 05
Assembly or assembly instructions and videos
- 06
Warehousing service via building materials wholesalers and construction
Materials and concrete grades
Concrete C 30/37
Concrete grade for precast elements such as grid stones (Noppensteine), frost- and weather-resistant.
Concrete C 30/37 LP
Concrete grade for fence posts and block steps with exposed-concrete or sand-blasted surface.
Architectural exposed concrete (grey, anthracite, white)
Surface finish for design elements such as block steps, staircases and angle retaining wall elements.
Concrete with slate texture
Optional surface texture on the visible face of angle retaining wall elements.
Stainless steel (displacement anchors)
Displacement anchors made of stainless steel in the crown of the angle retaining wall elements.
Locations

Wörleschwang
DEMain plant and administration
- Part weight / size
- up to approx. 1250 kg/piece
- Lot size
- Custom fabrication to series
- Materials
- Concrete C 30/37, C 30/37 LP, architectural exposed concrete
Pegau
DEPlant near Leipzig (GmbH & Co.)
- Materials
- Concrete
Munich
DEBranch office with field service
Krefeld
DEBranch office
Components and products






Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Precast concrete production (daylight shaft systems, basement window systems, elevator shaftCasting | formwork-smooth (visible face), | 500 cm (angle retaining wall elements × 260 cm (angle retaining wall elements | approx. 1250 kg/piece (Noppenstein | Custom fabrication possible | Concrete C 30/37, Concrete C 30/37 LP, Stainless steel (displacement anchors), Architectural exposed concrete (grey, anthracite, white), Concrete with slate texture |
| Custom fabrication of concrete staircases (bicycle ramp staircases, three-flight staircases, spiralEngineering | – | – | – | – | Concrete |
| Custom concrete fabrications (fire protection walls, retaining walls, foundations, specialEngineering | – | – | – | – | Concrete |
| Assembly of precast concrete elements (assembly instructions, assembly videos, factory-sideAssembly | – | – | – | – | – |
| Quality monitoring of raw materials, production processes and products by independent institutesTesting | – | – | – | – | – |
| Sandblasting of concrete surfaces (fence posts, block steps sand-blasted)Surface treatment | sand-blasted | – | – | – | Concrete C 30/37 LP |
Additional services
Reference customers
Quality and monitoring
Raw materials, production processes and products are inspected through in-house monitoring as well as by independent institutes; as of 01.01.2026, Argus CERT Bau and the quality assurance organizations of Baden-Württemberg and Saxony will take over the monitoring.
| Evidence | Wörleschwang | Pegau |
|---|---|---|
| In-house monitoring | ||
| Monitoring by Argus CERT Bau (from 2026) | ||
| Quality assurance for concrete and precast plants BW/Saxony (from 2026) |
Company history
Start of company activity with innovative precast concrete elements and building materials over 60 years ago
- 2008
Production of precast concrete elements for smaller bridge structures (Hainhofen bridge)
Delivery of 81 precast staircases for the DHL logistics center at Leipzig/Halle Airport by the Pegau plant
- 2026
Expansion of external monitoring by Argus CERT Bau and quality assurance organizations as of 01.01.2026