Load-bearing structures and buildings made of steel as well as windows, doors, gates and façades made of aluminium and plastic – from planning to assembly.

Hoffmann Herzberger Stahlbau GmbH
Herzberg (Elster) (Anhalter Str. 148a, 04916)New on Amplifa
About Hoffmann Stahlbau
Hoffmann Herzberger Stahlbau GmbH was founded in 1991 in Herzberg (Elster) and offers complete solutions for load-bearing structures and buildings made of steel. The service portfolio includes design of the structure including structural analysis and fire protection, the creation of technical drawings as well as manufacturing and assembly. In 1994, the second company, Erwin Hoffmann Metallbau GmbH, was founded, which initially produced windows, doors and gates made of plastic and later expanded into in-house production of aluminium products. Today its customers are predominantly businesses and the public sector; construction projects have been realized in the new and old federal states, in France and in Austria. With around 30 employees, production halls from 2002 and 2011, and its own apprentice training, the company manufactures components such as escape staircases, façades, windows, doors and gates made of steel, aluminium and plastic.
- Site
- Herzberg (Elster)
- Processes
- Structural steelwork – planning, drawing, calculation of load-bearing structures and buildings made, Manufacture of escape staircases (structural steelwork), Façade construction (metalworking), Window construction, Door construction, Gate construction, In-house production of aluminium products, Welding (welding equipment)
- Materials
- Steel, Aluminium, Plastic (windows, doors, gates), Plastic
- Founded
- 1991
- Employees
- ca. 30 (average
- Industries
- Construction industry / Construction, Public sector, Businesses / Trade, Private customers
- 01
Planning (structural analysis, fire protection)
- 02
Technical drawings
- 03
Cutting / bar processing
- 04
Welding / manufacturing
- 05
On-site assembly
Materials & Processes
Steel
Material for load-bearing structures, buildings and escape staircases in structural steelwork.
Aluminium
Produced in-house since 1994 for windows, doors, gates and façades.
Plastic
Material for windows, doors and gates, initially the main product of the metalworking business.
Locations

Herzberg (Elster)
DEOperating site / Production
- Materials
- Steel, aluminium, plastic
- Production hall (2002)
- Production hall (2011)
- Forklift
Components & References


Inside the production


Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Structural steelwork – planning, drawing, calculation of load-bearing structures and buildings madeEngineering | – | – | – | – | Steel |
| Manufacture of escape staircases (structural steelwork)Assembly | – | – | – | – | Steel |
| Façade construction (metalworking)Assembly | – | – | – | – | Aluminium, Steel |
| Window constructionAssembly | – | – | – | – | Plastic, Aluminium |
| Door constructionAssembly | – | – | – | – | Plastic, Aluminium |
| Gate constructionAssembly | – | – | – | – | Plastic, Aluminium, Steel |
| In-house production of aluminium productsAssembly | – | – | – | – | Aluminium |
| Welding (welding equipment)Joining | – | – | – | – | Steel, Aluminium |
| Sawing of bars (double mitre saw, bar processing)Machining | – | – | – | – | Steel, Aluminium |
| Assembly (assembly table, assembly of steel structures/windows/doors/gates)Assembly | – | – | – | – | Steel, Aluminium, Plastic |
5 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Double mitre saw | – | 1 | – | – | Herzberg (Elster) |
| Bar processing centre | – | 1 | – | – | Herzberg (Elster) |
| Assembly table | – | – | – | – | Herzberg (Elster) |
| Welding equipment | – | – | – | – | Herzberg (Elster) |
| Forklift | – | 1 | – | – | Herzberg (Elster) |
Additional services
History
- 1991
Foundation of Hoffmann Herzberger Stahlbau GmbH
- 1994
Foundation of Erwin Hoffmann Metallbau GmbH; initially windows, doors and gates made of plastic, later in-house production of aluminium products
- 2002
Commissioning of new production halls
- 2011
Commissioning of further production halls, expansion of the scope of services and start of apprentice training
- 2024
ERDF-funded investment (de minimis): forklift to expand capacity of the operating site
- 2026
Planned ERDF-funded acquisition of a double mitre saw, bar processing centre, assembly table and welding equipment