Integrated steelworks in Duisburg – pig iron, crude steel, slabs and round continuous casting in up to 2,000 steel grades
Hüttenwerke Krupp Mannesmann GmbH
Duisburg (Huckingen/Hüttenheim) · Ehinger Straße 200, 47259 DuisburgNew on Amplifa
About HKM
Hüttenwerke Krupp Mannesmann GmbH (HKM) operates an integrated steelworks in southern Duisburg and is 100 percent owned by the Salzgitter Group. The company produces pig iron in two blast furnaces and steel in the LD converter process, casting it into slabs and round continuous-cast products in up to 2,000 steel grades. The value chain includes its own sinter plants and a coking plant with two batteries (2.3 million t of coke/year); coke oven gas and blast furnace gas supply the Duisburg-Huckingen power plant. Customers are the shareholders, who further process the semi-finished products into seamless tubes, large-diameter pipes, body components and forged parts; customer industries are the automotive, tube and steel processing industries as well as mechanical engineering. HKM accounts for around 12 % of German crude steel production and employed 3,093 people (2021) with revenue of €3,136.0 million. Plans call for the shutdown of the blast furnaces and the construction of an electric arc furnace with an annual capacity of 2–2.5 million t for CO₂-reduced steel production by 2029.
- Site
- Duisburg
- Processes
- Slab casting (slab continuous casting), Round continuous casting, Pig iron production (blast furnace), Coke production, Sinter production, Steel production in the steelworks (LD/converter process), Production of slabs and round continuous-cast products (up to 2,000 steel grades), Coking plant
- Materials
- Steel (crude steel), Pig iron, Coke, Sinter, Slabs, Round continuous casting, Crude steel (up to 2,000 steel grades)
- Founded
- 1990
- Employees
- 3093
- Industries
- Automotive industry, Tube industry, Steel processing industry, Mechanical engineering
- 01
Sinter production
- 02
Coke production
- 03
Pig iron production (blast furnace)
- 04
Steel production in the LD/converter process
- 05
Slab continuous casting
- 06
Round continuous casting
Materials & Processes
Pig iron
Pre-product produced in the blast furnace for steel production in the converter.
Crude steel (up to 2,000 steel grades)
Steel produced in the LD steelworks for slab and round continuous casting.
Slabs
Continuously cast semi-finished product, among other things for body components and rolling mills.
Round continuous casting
Round-profile semi-finished product for seamless tubes and forged components.
Coke
In-house produced reducing agent for the blast furnace process.
Sinter
Iron ore pre-product for charging the blast furnaces.
Sites

Duisburg
DEIntegrated steelworks, headquarters
- Materials
- Pig iron, crude steel, slabs, round continuous casting, coke, sinter
- 2 blast furnaces
- LD steelworks/converter
- Continuous casting plant for slab production
- Continuous casting plant for round production
- Coking plant (2 batteries)
- Sinter plant
- Electric arc furnace (planned, 2–2.5 million t/year)
Inside the production

Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Slab casting (slab continuous casting)Casting | – | – | – | – | Steel |
| Round continuous castingCasting | – | – | – | – | Steel |
| Pig iron production (blast furnace)Casting | – | – | – | – | Pig iron |
| Coke productionEngineering | – | – | – | – | Coke |
| Sinter productionEngineering | – | – | – | – | Sinter (iron ore pre-product) |
| Steel production in the steelworks (LD/converter process)Casting | – | – | – | – | Crude steel |
7 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Blast furnace | – | 2 | – | – | Duisburg |
| LD steelworks / converter | – | – | – | – | Duisburg |
| Continuous casting plant for slab production | – | – | – | – | Duisburg |
| Continuous casting plant for round production | – | – | – | – | Duisburg |
| Coking plant | – | 2 | – | – | Duisburg |
| Sinter plant | – | – | – | – | Duisburg |
| Electric arc furnace (planned, capacity 2–2.5 million t/year) | – | 1 | – | – | Duisburg |
Additional services
Reference customers
History
- 1909
Schulz-Knaudt erects a Siemens-Martin steelworks in Duisburg-Huckingen (approx. 110,000 t of crude steel/year)
- 1914
Takeover of the works by Mannesmannröhren-Werke AG / merger with Mannesmann
- 1929
Construction of the sinter plants and blast furnaces
- 1932
Renamed Heinrich-Bierwes-Hütte
- 1987
Krupp and Mannesmann decide to combine their Duisburg steel sites
- 1990
Foundation of Hüttenwerke Krupp Mannesmann GmbH
- 1993
Closure of the Rheinhausen works, concentration on the Huckingen/Hüttenheim site
- 2006
Investment of €40 million in coal injection instead of heavy oil injection in the blast furnace
- 2010
Announcement of the coking plant expansion (€400 million) – largest single investment to date
- 2014
Commissioning of the second coking plant battery (annual production 2.3 million t of coke)
- 2016
Relining of blast furnace B for €120 million
- 2026
thyssenkrupp (50 %) and Vallourec (20 %) sell their shares to Salzgitter AG; planned blast furnace shutdown and construction of an electric arc furnace (2–2.5 million t/year)