
Planning and installation of heating, ventilation, air conditioning and sanitary systems including electrical and building control (MSR) technology

IMO-Haustechnik Wernigerode GmbH
WernigerodeNew on Amplifa
About IMO-Haustechnik Wernigerode GmbH
IMO-Haustechnik Wernigerode GmbH is a medium-sized building services company based in Wernigerode, Saxony-Anhalt, which emerged from IMO Gebäudetechnik Wernigerode GmbH, founded in 1991. The company plans and installs heating systems including boiler houses, steam systems up to 10 bar, gas systems up to 1.0 bar supply pressure, pressure-maintenance stations as well as local and district heating systems. Further business areas are air conditioning and ventilation system construction with smoke extraction and heat recovery systems, sanitary installation with drinking water, wastewater and sewer line systems as well as refrigeration systems, solar systems, heat pumps and thermal concrete core activation. In addition, insulation, electrical installation including MSR systems, customer service, maintenance and a 24-hour emergency service are offered. Factory-fitted systems use drinking water and heating pipes made of copper tube as well as wastewater pipes made of PP pipe. Customers come from schools, daycare facilities, hospitals, nursing homes, retail stores, gastronomy as well as commercial and industrial properties; the company operates in Lower Saxony, Saxony-Anhalt, Hesse and Hamburg.
- Site
- Wernigerode
- Processes
- Heating system construction (central heating systems, hot water systems, local/district heating, Air conditioning and ventilation system construction (ventilation ducts, spiral-wound duct, smoke, Refrigeration systems / cooling and heating systems, Sanitary installation (drinking water pipes, wastewater pipes, sewer lines,, Solar systems, heat pumps and alternative energies, Thermal concrete core activation and cooling/heating surface systems, Insulation, Welding work (staff with special training as welders, valid
- Materials
- Copper tube (drinking water and heating pipe), Silent Pro PP pipe (wastewater pipe), Copper tube, Silent Pro PP pipe
- Certificates
- Company certification Chemicals Climate Protection Ordinance, Creditreform credit index, DVGW training/Welder qualification, VDI hygiene guidelines ventilation, Chemicals Climate Protection Ordinance (certification), ISO 9001
- Founded
- 1991
- Employees
- 40+
- Industries
- Schools, Daycare facilities, Hospitals, Nursing homes, Retail stores, Gastronomy
- 01
Consulting and Planning
- 02
Electrical Installation incl. MSR Systems
- 03
Installation Heating/Ventilation/Air Conditioning/Sanitary
- 04
Welding and Joining Work
- 05
Insulation
- 06
Commissioning
- 07
Customer Service, Maintenance and 24-Hour Emergency Service
Materials and Piping Systems
Copper tube
Drinking water and heating pipes, e.g. 700 meters in the reference project Hotel Weißer Hirsch
Silent Pro PP pipe
Sound-insulated wastewater pipes in the sanitary area
Location

Wernigerode
DEHeadquarters
- Materials
- Copper, PP pipe
- Fleet of vehicles for installation and customer service
Installed Systems and Reference Projects




Inside the production













Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Heating system construction (central heating systems, hot water systems, local/district heatingInstallation | – | – | – | – | Copper |
| Air conditioning and ventilation system construction (ventilation ducts, spiral-wound duct, smokeInstallation | – | – | – | – | – |
| Refrigeration systems / cooling and heating systemsInstallation | – | – | – | – | – |
| Sanitary installation (drinking water pipes, wastewater pipes, sewer lines,Installation | – | – | – | – | Copper, PP pipe (Silent Pro) |
| Solar systems, heat pumps and alternative energiesInstallation | – | – | – | – | – |
| Thermal concrete core activation and cooling/heating surface systemsInstallation | – | – | – | – | – |
| InsulationInstallation | – | – | – | – | – |
| Welding work (staff with special training as welders, validJoining | – | – | – | – | – |
| Planning, electrical installation including MSR systems (complete building services package)Engineering | – | – | – | – | – |
| Customer service: repair, maintenance and 24-hour emergency serviceInstallation | – | – | – | – | – |
Additional services
Reference customers
Quality and Credentials
The installers hold valid welder qualification certificates and training according to the DVGW rules; in ventilation construction, work is carried out in accordance with VDI guidelines including hygiene competence certification. Documents such as proof of qualification, trades registration card, exemption certificate and Creditreform credit index are available on the website.
| Evidence | Wernigerode |
|---|---|
| DVGW training/Welder qualification | |
| VDI hygiene guidelines ventilation | |
| Chemicals Climate Protection Ordinance (certification) | |
| ISO 9001 |
Company History
- 1991
Founded as IMO Gebäudetechnik Wernigerode GmbH; from this the present IMO-Haustechnik Wernigerode GmbH emerged