Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Manufactures modular Power-to-X plants for synthetic fuels and chemicals from CO₂ and renewable hydrogen.

IN

INERATEC GmbH

Karlsruhe · Frankfurt Höchst (plant site)New on Amplifa

KarlsruheHeadquarters
HRB 725053, AG MannheimCommercial Register
GmbHLegal Form
up to 30,000 t/a (PtL 4000)Plant Capacity

About INERATEC

INERATEC GmbH from Karlsruhe develops and manufactures modular Power-to-X plants that produce synthetic fuels (e-Fuels such as e-SAF, e-Diesel and e-Naphtha) and chemicals (e-Chemicals such as e-Methanol and Fischer-Tropsch waxes) from green hydrogen and biogenic or recycled CO₂. The core is the patented microstructure synthesis technology, which is scaled via numbering-up and designed for fluctuating renewable energies. The portfolio ranges from Power-to-Liquid and Gas-to-Liquid plants at demonstration scale (from 40 kg/h) to large-scale production plants (over 4,000 kg/h, up to 30,000 t/a). The production modules are manufactured at the Karlsruhe site. In addition to plant construction, the company offers feasibility studies, engineering, integration, maintenance, commissioning and operation across the entire project lifecycle. Customers come from the transport and aviation industries (Sustainable Aviation Fuel), the chemical industry and energy supply.

Site
Karlsruhe
Processes
Power-to-Liquid synthesis (Fischer-Tropsch), Gas-to-Liquid synthesis (Fischer-Tropsch reactors), Power-to-Gas synthesis (synthetic natural gas), Production of e-Fuels (e-SAF, e-Diesel, e-Naphtha, e-Crude/e-wax), Production of e-Chemicals (waxes, methanol, MATERA e-Wax), Engineering (feasibility studies, plant construction, integration, maintenance, operation), Manufacturing of modular plants (production modules), Feasibility studies
Materials
Hydrogen (green), CO₂ (biogenic/recycled), Synthesis gas (H₂ + CO), DMI water, Fischer-Tropsch oil, Fischer-Tropsch wax, Methanol (e-Methanol), Power-to-Liquid synthesis (Fischer-Tropsch)
Industries
Transport and Aviation (e-SAF), Chemical Industry, Energy Supply/Resilience
  1. 01

    Feasibility study

  2. 02

    Engineering and plant design

  3. 03

    Manufacturing of production modules in Karlsruhe

  4. 04

    Delivery and on-site integration

  5. 05

    Commissioning

  6. 06

    Maintenance and operation

Raw Materials & Processes

PTL

Power-to-Liquid synthesis (Fischer-Tropsch)

Production of synthetic fuels and waxes from CO₂, green hydrogen and DMI water.

GTL

Gas-to-Liquid synthesis (Fischer-Tropsch reactors)

Conversion of synthesis gas (H₂ and CO) into synthetic hydrocarbons.

PTG

Power-to-Gas synthesis

Production of synthetic natural gas, among other things from biogenic sewage sludge as a CO₂ source.

H2

Hydrogen (green)

Feedstock for Fischer-Tropsch synthesis; alternatively produced via electrolysis from water and renewable electricity.

CO2

CO₂ (biogenic/recycled)

Carbon source for e-Fuels and e-Chemicals, in part filtered directly from ambient air.

FT

Fischer-Tropsch oil and wax

Products of the synthesis serving as the basis for e-Fuels and sustainable waxes such as MATERA e-Wax.

MeOH

e-Methanol

Chemical basic material made from recycled CO₂ and renewable energy.

Sites & Plants

Karlsruhe (Siemensallee 84)

DE

Headquarters, engineering and plant manufacturing

  • PtL Demo (up to 40 kg/h, approx. 21 m × 15 m)
  • PtL 400 (up to 400 kg/h, approx. 35 m × 18 m)
  • PtL 4000 (up to 4,000 kg/h, approx. 100 m × 60 m)
  • GtL 400 (up to 420 kg/h, approx. 35 m × 20 m)
  • GtL 4000 (up to 4,200 kg/h, approx. 80 m × 100 m)

Industriepark Frankfurt Höchst

DE

Plant site ERA ONE, first commercial Power-to-Liquid plant

  • ERA ONE pioneering plant

Werlte

DE

Plant site of first industrial pilot plant

  • Pilot plant e-Fuel production (350 t e-Fuels/year)

Hamburg

DE

Plant site of second pilot plant

  • Pilot plant wax production

Industries

Transport and Aviation (e-SAF)Chemical IndustryEnergy Supply/Resilience

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Power-to-Liquid synthesis (Fischer-Tropsch)Casting––––CO₂, Hydrogen, DMI water
Gas-to-Liquid synthesis (Fischer-Tropsch reactors)Casting––––Synthesis gas (hydrogen, carbon monoxide)
Power-to-Gas synthesis (synthetic natural gas)Casting––––Sewage sludge (biogenic)
Production of e-Fuels (e-SAF, e-Diesel, e-Naphtha, e-Crude/e-wax)Casting––––CO₂, Hydrogen
Production of e-Chemicals (waxes, methanol, MATERA e-Wax)Casting––––recycled CO₂, Hydrogen
Engineering (feasibility studies, plant construction, integration, maintenance, operation)Engineering–––––
Manufacturing of modular plants (production modules)Assembly–––––

9 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
INERATEC PtL Demo (Power-to-Liquid plant)INERATEC PtL Demo–approx. 21 m x 15 m footprint; up to 40 kg/h product; up to 300 T/A–Karlsruhe (manufacturing)
INERATEC PtL 400 (Power-to-Liquid plant)INERATEC PtL 400–approx. 35 m x 18 m footprint; up to 400 kg/h; up to 3,000 T/A–Karlsruhe (manufacturing)
INERATEC PtL 4000 (Power-to-Liquid plant)INERATEC PtL 4000–approx. 100 m x 60 m footprint; up to 4,000 kg/h; up to 30,000 T/A–Karlsruhe (manufacturing)
INERATEC GtL 400 (Gas-to-Liquid plant)INERATEC GtL 400–approx. 35 m x 20 m footprint; up to 420 kg/h; up to 3,400 T/year–Karlsruhe (manufacturing)
INERATEC GtL 4000 (Gas-to-Liquid plant)INERATEC GtL 4000–approx. 80 m x 100 m footprint; up to 4,200 kg/h; up to 34,000 T/year–Karlsruhe (manufacturing)
ERA ONE pioneering plant (Power-to-Liquid)INERATEC ERA ONE1––Industriepark Frankfurt Höchst
Pilot plant e-Fuel productionINERATEC1350 tonnes of e-Fuels annually–Werlte
Pilot plant wax productionINERATEC1––Hamburg
Power-to-Gas plantINERATEC1–2018Sabadell, Spain

Additional services

Feasibility studiesEngineering and plant constructionIntegration, maintenance and operation of plantsPlant manufacturing in KarlsruheCommissioning and support throughout the entire project lifecycle

Reference customers

Haltermann CarlessRamboll

History

  1. 2018

    Delivery of the second customer plant to Sabadell, Spain (Power-to-Gas from sewage sludge); seed financing by the Hightech-Gründerfonds in September 2018; German Founders' Award in the Startup category.

  2. 2019

    Establishment of the first subsidiary INERATEC Schweiz AG.

  3. 2021

    Delivery of the first industrial pilot plant to Werlte (350 t e-Fuels per year from biogenic CO₂); operation of the world's first fully integrated Power-to-X combined plant in the Kopernikus project P2X; second pilot plant delivered to Hamburg for wax production.

  4. 2022

    Series A financing round with ENGIE New Ventures, Safran Corporate Ventures and MPC; Next Economy Award 2022; doubling of team, production and office space in Karlsruhe.

  5. 2023

    Groundbreaking for the first commercial Power-to-Liquid plant ERA ONE in the Industriepark Frankfurt Höchst; Series B financing led by Piva Capital; funding of €70 million by EIB and Breakthrough Energy Catalyst.

  6. 2024

    Named Top Innovator in the SAF field (UpLink Challenge, WEF); inclusion in the Global Clean Tech 100; commissioning of ERA ONE and first commercial batch of MATERA e-Wax.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo