Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Building physics consultancy with GEAK certificates, Blower-Door measurements and infrared thermography in Ittigen

InfraBlow.Siegrist Logo

InfraBlow.Siegrist GmbH

3063 Ittigen (CH) · 3065 Bolligen (CH)New on Amplifa

GmbHLegal form
CHE-171.387.109UID
Harald SiegristOwner and Managing Director

About us

InfraBlow.Siegrist GmbH is a consultancy specialising in building physics based in Ittigen in the canton of Bern. Its service portfolio covers building physics consulting on thermal insulation, sound insulation and Minergie, the preparation of building energy certificates (GEAK and GEAK Plus), energy consulting including advice on the AUE funding programme, as well as planning and execution inspections and building damage analysis. In the field of measurement technology, the company carries out Blower-Door measurements to determine the airtightness of the building envelope, including air leakage localisation; with a MultipleFan measurement system, large buildings with envelope areas exceeding 8'000 m², such as school facilities, industrial and administrative buildings, can also be tested. In addition, DoorFan measurements are offered to determine fire-extinguishing gas hold times for gas extinguishing systems. A further pillar is non-destructive infrared thermography for visualising thermal bridges, damp constructions and energy efficiency weak points. The managing director is Harald Siegrist.

Site
Ittigen
Processes
Building physics / GEAK & GEAKPlus, Infrared thermography (heat loss analysis, thermal bridges, building damage analysis), Blower-Door measurement (airtightness, air leakage localisation), MultipleFan measurement (buildings with envelope area > 8'000 m²), DoorFan measurement (fire-extinguishing gas hold times), Energy consulting / funding programme consulting, Building physics (thermal insulation, sound insulation, Minergie), Energy certificates / GEAK / GEAK Plus
Materials
Blower-Door Measurement, MultipleFan Measurement System, DoorFan Measurement, Infrared Thermography, GEAK & GEAK Plus
Industries
Construction / Building Physics, Building Renovation and New Construction, Industrial and Administrative Buildings, School Facilities, Gas Extinguishing Systems, Gas Extinguishing Systems (Fire-Extinguishing Gas Hold Times)
  1. 01

    Consulting / Building Physics

  2. 02

    GEAK & GEAK Plus

  3. 03

    Infrared Thermography

  4. 04

    Blower-Door / MultipleFan / DoorFan

  5. 05

    Report & Quality Assurance

Services & Processes

BD

Blower-Door Measurement

Normative verification of the airtightness of the building envelope as well as air leakage localisation in new builds and renovations.

MF

MultipleFan Measurement System

Blower-Door measurement for large buildings with an envelope area exceeding 8'000 m², e.g. school facilities, industrial and administrative buildings.

DF

DoorFan Measurement

Determination of fire-extinguishing gas hold times during installation and maintenance of gas extinguishing systems in accordance with SES.

IRT

Infrared Thermography

Non-destructive and non-contact visualisation of thermal bridges, execution defects, moisture and air leaks.

GEAK

GEAK & GEAK Plus

Cantonal building energy certificate including a report with recommendations for improvement measures.

Locations

Ittigen

CH

Location (contact address)

  • MultipleFan measurement system (Blower-Door)
  • DoorFan measurement system

Bolligen

CH

Imprint contact address

Industries

Construction / Building PhysicsBuilding Renovation and New ConstructionIndustrial and Administrative BuildingsSchool FacilitiesGas Extinguishing SystemsGas Extinguishing Systems (Fire-Extinguishing Gas Hold Times)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Building physics / GEAK & GEAKPlusTesting–––––
Infrared thermography (heat loss analysis, thermal bridges, building damage analysis)Testing–––––
Blower-Door measurement (airtightness, air leakage localisation)Testing–––––
MultipleFan measurement (buildings with envelope area > 8'000 m²)Testing–––––
DoorFan measurement (fire-extinguishing gas hold times)Testing–––––
Energy consulting / funding programme consultingEngineering–––––

2 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
MultipleFan measurement system (Blower-Door)––Building envelope area > 8'000 m²–Ittigen
DoorFan measurement system––––Ittigen

Additional services

Building physics (thermal insulation, sound insulation, Minergie)Energy certificates / GEAK / GEAK PlusConsulting on the AUE funding programmePlanning & execution inspectionEnergy consultingBuilding damage analysisInfrared thermography / heat loss analysesVisualisation of thermal bridgesQuality controlLocalisation of underfloor heating and structural elementsBlower-Door measurements (airtightness)MultipleFan measurements (buildings with envelope area > 8'000 m²)Door-Fan / fire-extinguishing gas hold time measurementsAir leakage localisation
Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo