
Engineering consultancy for road and traffic planning including visualisation and kerbstone adhesive technology

Ingenieurbüro V-KON KG
54296 Trier, Max-Planck-Straße 10 · SaarburgNew on Amplifa
About the engineering consultancy V-KON
The engineering consultancy V-KON KG specialises in road and traffic planning. Its planning services include traffic analyses, design planning for intersections and roundabouts as well as professional visualisation of traffic planning projects. A key focus is the planning and construction supervision of roundabouts with bypasses in concrete construction, in particular using kerbstone adhesive technology: in this process, calibrated flat kerbstones are bonded with a 2-component plastic thin-bed adhesive onto pre-constructed concrete carriageways. The work performed can be carried out almost without any cutting effort. Customers include municipalities such as the city of Münster as part of road safety programmes, as well as construction companies and concrete stone works. V-KON operates at both sites in Trier and Saarburg.
- Site
- Trier
- Processes
- Traffic planning, Road planning, Professional visualisation (traffic planning), Roundabout planning / kerbstone adhesive technology (structural implementation accompanied as
- Materials
- Concrete (concrete construction carriageway), Flat kerbstone profile FB 30 x 25 (F15), 2-component plastic (thin-bed adhesive), White concrete (kerb facing)
- Industries
- Road construction, Traffic planning
- 01
Traffic analysis and stocktaking
- 02
Road and traffic planning
- 03
Visualisation
- 04
Tendering and construction-accompanying planning
- 05
Acceptance
Materials and building materials
Concrete (concrete construction carriageway)
Used for roundabout carriageways in concrete construction.
Flat kerbstone profile FB 30 x 25 (F15)
Bonded onto concrete carriageways to form roundabouts and bypasses.
2-component plastic (thin-bed adhesive)
Serves as adhesive for the kerbstone adhesive technology on cleaned concrete surfaces.
White concrete (kerb facing)
Improves the visibility and traffic-guiding effect of kerbstones.
Locations
Trier
DESite
Saarburg
DESite
Inside the production

Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Traffic planningEngineering | – | – | – | – | – |
| Road planningEngineering | – | – | – | – | – |
| Professional visualisation (traffic planning)Engineering | – | – | – | – | – |
| Roundabout planning / kerbstone adhesive technology (structural implementation accompanied asEngineering | – | – | – | – | Concrete, Flat kerbstones profile FB 30 x 25 (F15), 2-component plastic (thin-bed adhesive) |
Additional services
Reference customers