Control cabinets and automation solutions from hardware planning and switchgear construction to software and on-site installation
Insoft Elektrotechnik GmbH
6123 Vomperbach (AT) · Alte Landstraße 22New on Amplifa
About Insoft
Insoft Elektrotechnik GmbH, based in Vomperbach, Tyrol, has been active in automation technology since 1988. The company manufactures control cabinets ranging from installation distribution boards and PLC control cabinets and server cabinets to low-voltage main distribution boards up to 6300 A. Its service portfolio includes software development (PLC, DCS, archiving and logging software), hardware planning according to EN 61439-1, switchgear construction, on-site installation of automation systems, and system inspections in accordance with ÖVE-ÖNORM E 8001-6-61/62/63. As an on-site partner of Tirolnet, Insoft also installs fiber optic internet connections. Key industries are tunnel and traffic engineering, alpine technology, water technology as well as the food and construction industries; reference projects include the Stellingen Tunnel in Hamburg, the Schnelsen Tunnel, the Felbertauern Tunnel, the St. Niklas underground route, and the Pill water supply system. International projects have been implemented in Europe, North and South America, and Asia.
- Site
- Vomperbach
- Processes
- Low-voltage main distribution boards up to 6300A, Installation / erection of automation systems on site, Hardware planning (circuit diagram creation according to EN 61439-1), Software development (PLC, DCS, archiving and logging software), System inspections in accordance with ÖVE-ÖNORM E 8001-6-61/-62/-63, Installation of fiber optic internet connections (Tirolnet), Hardware planning (circuit diagrams according to EN 61439-1), Control cabinet/switchgear construction up to low-voltage main distribution boards (up to 6300 A)
- Materials
- Fiber optic, Low-voltage main distribution boards up to 6300 A, Sheet steel control cabinets
- Certificates
- ÖVE-ÖNORM E 8001-6-61/-62/-63 (system inspections), EN 61439-1 (hardware planning)
- Industries
- Tunnel and traffic engineering, Alpine technology, Water technology, Food industry, Construction industry, Telecommunications
- 01
Hardware planning (EN 61439-1)
- 02
Control cabinet and switchgear construction
- 03
Software development (PLC/DCS)
- 04
On-site installation
- 05
Commissioning and system inspection
Materials & Processes
Low-voltage main distribution boards up to 6300 A
Manufactured with copper busbars for industrial and infrastructure installations.
Sheet steel control cabinets
Installation distribution boards, PLC control cabinets and server cabinets in sheet steel design.
Fiber optic
Installation of fiber optic internet connections as an on-site Tirolnet partner.
Locations
Vomperbach
ATHeadquarters, control cabinet manufacturing, engineering and software development
- Materials
- Sheet steel, copper, fiber optic
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Installation | – | – | – | – | Metal (sheet steel, implied for control cabinets) |
| Low-voltage main distribution boards up to 6300AInstallation | – | – | – | – | Copper (busbars, implied) |
| Installation / erection of automation systems on siteInstallation | – | – | – | – | – |
| Hardware planning (circuit diagram creation according to EN 61439-1)Engineering | – | – | – | – | – |
| Software development (PLC, DCS, archiving and logging software)Engineering | – | – | – | – | – |
| System inspections in accordance with ÖVE-ÖNORM E 8001-6-61/-62/-63Testing | – | – | – | – | – |
| Installation of fiber optic internet connections (Tirolnet)Installation | – | – | – | – | Fiber optic |
Additional services
Reference customers
Quality
System inspections are carried out in accordance with ÖVE-ÖNORM E 8001-6-61/-62/-63; circuit diagram creation according to EN 61439-1.
| Evidence | Vomperbach |
|---|---|
| ÖVE-ÖNORM E 8001-6-61/-62/-63 (system inspections) | |
| EN 61439-1 (hardware planning) |
History
- 1988
Company founded
- 2006
Registration of Insoft Elektrotechnik GmbH (start date 06.01.2006, commercial register FN 273288 w)
- 2016
Traffic clearance of the St. Niklas underground route after general renovation and safety upgrade (09.06.2016)
- 2018
Traffic clearance of the eastern tube of the Stellingen Tunnel in Hamburg (09.12.2018); the Schnelsen Tunnel A-7 cover passes the fire protection test