
Management consultancy for process optimization, time management and lean management based on REFA methods

International Process & Industrie Consult SA
Muralto/Locarno (CH) · Munich (DE) · Vienna (AT)New on Amplifa
About IPIC Consulting
International Process & Industrie Consult SA (IPIC) is a company of REFA Suisse GmbH with headquarters in Muralto/Locarno (canton of Ticino, Switzerland) and has been active in process consulting since 2008, initially as REFA International. The consulting services cover time studies according to REFA, multi-moment studies, ratio-delay determination, standard time determination, set-up time optimization (SMED), potential analyses, material flow design and factory planning, MTM, value stream design, cost accounting and controlling, remuneration systems as well as quality management including preparation for ISO certifications in cooperation with TÜO GmbH. The offering is complemented by certified trainings (REFA basic training, Lean Six Sigma, AI trainings) and the software TIME Tools (TimeStudy, MultiPro). Customers come from industries such as metal and electrical, automotive, machinery and plant engineering, chemicals, energy, logistics, pharmaceuticals and public administration, including Schaeffler México and PT Chubb Indonesia. In addition to locations in Munich and Vienna, projects are carried out worldwide in over 40 countries.
- Site
- Muralto/Locarno
- Processes
- Time studies according to REFA, Multi-moment study according to REFA, Ratio-delay determination according to REFA, Potential analysis (manufacturing, assembly, logistics, material disposition), Process optimization (REFA & Lean), Set-up time optimization (SMED), Standard time determination, Material flow design and factory planning
- Materials
- REFA methodology (time management), Lean Management / Lean Six Sigma, Set-up time optimization, Methods-Time Measurement, Value stream design, Quality management systems
- Founded
- 2008
- Industries
- Metal & Electrical, Automotive, Chemicals & Building Materials, Energy, Logistics, Communication, Media & Technology
- 01
Current-state analysis and potential analysis
- 02
Time studies and multi-moment studies according to REFA
- 03
Process optimization (REFA & Lean)
- 04
Concept and implementation (e.g. factory planning, remuneration systems, QM)
- 05
Training and coaching
- 06
Controlling and sustainability
Methods & Procedures
REFA methodology (time management)
Time studies, multi-moment studies and ratio-delay determination for standard time determination and productivity improvement.
Lean Management / Lean Six Sigma
Analysis and reduction of waste in production, assembly and logistics.
Set-up time optimization
Reduction of set-up times to increase plant and machine utilization.
Methods-Time Measurement
Time system for planning and designing work processes in assembly and manufacturing.
Value stream design
Mapping and optimization of material and information flow along the value chain.
Quality management systems
Development, review and certification preparation of QM systems together with TÜO GmbH.
Locations
Muralto/Locarno
CHHeadquarters and Contact Office Switzerland
- Materials
- REFA, Lean, QM
- TIME Tools TimeStudy
- TIME Tools MultiPro
Munich
DEGerman location (Elsenheimerstraße 61)
- Materials
- REFA, Lean
Vienna
ATAustrian location (Kärntner Ring 5-7)
- Materials
- REFA, Lean
Service Areas


Inside the production





Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Time studies according to REFAEngineering | – | – | – | – | – |
| Multi-moment study according to REFAEngineering | – | – | – | – | – |
| Ratio-delay determination according to REFAEngineering | – | – | – | – | – |
| Potential analysis (manufacturing, assembly, logistics, material disposition)Engineering | – | – | – | – | – |
| Process optimization (REFA & Lean)Engineering | – | – | – | – | – |
| Set-up time optimization (SMED)Engineering | – | – | – | – | – |
| Standard time determinationEngineering | – | – | – | – | – |
| Material flow design and factory planningEngineering | – | – | – | – | – |
| Methods-Time Measurement (MTM)Engineering | – | – | – | – | – |
| Cost accounting and controllingEngineering | – | – | – | – | – |
| Quality management (QM) / certification preparation (with TÜO)Testing | – | – | – | – | – |
| OEE analysis / plant efficiency optimizationEngineering | – | – | – | – | – |
Additional services
Reference customers
History
- 2008
Founding of REFA: Suisse
- 2018
Founding of REFA International
- 2019
Founding of REFA Austria
- 2023
Renaming: REFA International becomes IPIC International, REFA Austria becomes IPIC Austria