Machining and processing of technical rubber products, gaskets, mats and conveyor belts on 1,300 m² of production space in Emden.
Ites Gummi- und Dichtungstechnik GmbH
Emden · GermanyNew on Amplifa
About Ites Gummi- und Dichtungstechnik GmbH
Ites Gummi- und Dichtungstechnik GmbH was founded in 1999 by Gerd Ites in Emden and is a company in rubber and sealing technology operating throughout Europe. The product range includes rubber sheets and mats, gaskets made of rubber, plastics and fibre materials, foamed and cellular materials, profiles and moulded parts, anti-slip mats for load securing, as well as conveyor belts and elevator belts. Manufacturing is carried out, among other methods, by CNC-controlled punching technology, waterjet cutting at an operating pressure of around 4,000 bar, CNC plotter production with oscillating cutting knives on a working area of 1.55 × 6.0 m, splitting technology as well as manual custom manufacturing including vulcanization and lamination. Materials include NR/SBR, NBR, EPDM, CR, FKM, silicone, polyurethane, PTFE and Klingersil. Customers are found in industries such as mining, mill and plant engineering, mechanical engineering, shipyards, wind energy, automotive, power plants and rail transport. Common gasket sheets and mats are stocked on 8,300 m² of warehouse space, of which 6,200 m² is covered; delivery takes place throughout Germany within 24 hours.
- Site
- Emden
- Processes
- Punching technology (CNC-controlled punching), Waterjet cutting (pure water and abrasive), CNC-controlled plotter production (oscillating cutting knives), Splitting technology (peeling), Strips and cut-to-size parts (strip cutting machines), Coatings (self-adhesive backing, one or both sides), Vulcanization (endless hot-vulcanized conveyor belts, vulcanized large gaskets), Elevator belt assembly (length, width, punching, bucket mounting)
- Materials
- NR/SBR, NBR, EPDM, CR, FKM (Viton), CSM (Hypalon), IIR (Butyl), Para
- Certificates
- DIN EN ISO 9001, DIN EN ISO 14001 (Environmental management), DIN EN ISO 14001
- Founded
- 1999
- Industries
- Mining, Mill and plant engineering, Mechanical engineering, Shipyards, Automotive, Wind energy
- 01
Consulting and material selection
- 02
Cutting (punching, waterjet, plotter, splitting)
- 03
Finishing (coating, lamination, vulcanization)
- 04
Assembly and kitting
- 05
Warehousing and shipping (24 h nationwide)
Materials and Processes
NR/SBR
Standard elastomer for rubber sheets, mats and gaskets in many technical applications.
NBR
Oil- and fuel-resistant rubber for gaskets in drive technology and mechanical engineering.
EPDM
Weather- and ageing-resistant, used for gaskets in construction and plant engineering.
CR (Chloroprene)
Universally applicable elastomer with good ageing and ozone resistance.
FKM (Viton)
Heat- and chemical-resistant elastomer for demanding sealing applications.
CSM (Hypalon)
Chemical- and weather-resistant material for technical rubber products.
IIR (Butyl)
Gas-tight rubber for sealing applications with high impermeability requirements.
Silicone
Temperature-resistant elastomer, partly FDA-approved, for gaskets and sleeves.
Polyurethane (PU)
Wear-resistant plastic for gaskets and technical components.
PTFE
Chemical-resistant plastic for gaskets with high media requirements.
Foamed and cellular materials
Cellular rubber, foam rubber, PE, PU and silicone foam for sealing and insulation tasks, also self-adhesive.
Fibre material gaskets
Klingersil, Frenzelit, Faserflex and Isoplan for flat gaskets.
Locations
Emden
DEAdministration, production, warehouse
- Lot size
- Single parts to large-scale series
- Materials
- Rubber, plastics, foams, fibre materials
- CNC-controlled punching machine
- Waterjet cutting system (1.6 × 3.0 m, approx. 4,000 bar)
- CNC plotter with oscillating cutting knives (1.55 × 6.0 m)
- Splitting machine (1,200 mm width, up to 30 mm thickness)
- Strip cutting machine
- High-bay warehouse
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Punching technology (CNC-controlled punching)Plastics | – | – | – | – | Rubber, Fibre materials, Plastics, Conveyor belt material |
| Waterjet cutting (pure water and abrasive)Plastics | – | 3.0 m | – | – | all materials incl. hard materials |
| CNC-controlled plotter production (oscillating cutting knives)Plastics | – | 6.0 m × 1.55 m | – | 1 (single parts) – Small series | Rubber, Plastics, Foamed materials |
| Splitting technology (peeling)Plastics | – | 1200 mm × 30 mm (material thickness) | – | – | Rubber |
| Strips and cut-to-size parts (strip cutting machines)Plastics | – | from 5 mm width × 50 mm material thickness | – | – | all rubber grades, cellular materials |
| Coatings (self-adhesive backing, one or both sides)Surface | – | – | – | – | all materials |
| Plastics | – | – | – | – | Rubber, Silicone |
| Vulcanization (endless hot-vulcanized conveyor belts, vulcanized large gaskets)Plastics | – | – | – | – | Rubber |
| Elevator belt assembly (length, width, punching, bucket mounting)Plastics | – | – | – | – | Rubber |
6 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| CNC-controlled plotters with oscillating cutting knives (1 or 2 cutting heads) | – | – | 1.55 × 6.0 m | – | Emden |
| Waterjet cutting system | – | – | 1.6 × 3.0 m | – | Emden |
| Splitting machine | – | – | Width 1200 mm, thickness up to 30 mm | – | Emden |
| Strip cutting machine | – | – | – | – | Emden |
| CNC-controlled punching machine | – | – | – | – | Emden |
| High-bay warehouse (8,300 m² warehouse space, of which 6,200 m² covered) | – | – | 8,300 m² | – | Emden |
Additional services
Quality
The company is certified according to DIN EN ISO 9001 and DIN EN ISO 14001. Production is carried out on CNC-controlled machines for repeatable results from single parts to large-scale series.
| Evidence | Emden |
|---|---|
| DIN EN ISO 9001 | |
| DIN EN ISO 14001 |
History
- 1999
Company founded by Gerd Ites and construction of the first hall at Stedinger Straße 22 in Emden.
- 2002
New construction of administration and production building on the premises at Stedinger Straße 22.
- 2003
Move into the new buildings.
- 2008
Expansion of production space to 1,300 m² and warehouse space to 8,300 m² (completed 2015).
- 2014
Expansion of the material range to include the conveying technology segment – elevator belts.
- 2017
Digitalization of processes with direct control of production equipment.
- 2019
Certification according to DIN EN ISO 9001 and DIN EN ISO 14001.