
Civil engineering, road construction, paving, natural stone walls and hydraulic engineering from Schwarzenberg

Jan Beyreuther GmbH & Co. KG
Schwarzenberg · BreitenbrunnNew on Amplifa
About us
Jan Beyreuther GmbH & Co. KG is a construction company based in Schwarzenberg (Erzgebirge) that specialises in the design of public spaces. Its range of services includes civil and road engineering, paving work of all kinds – in particular traditional natural stone road surfaces –, slab laying, the construction of natural stone and gravity walls as well as landscaping for private, commercial and municipal clients. In addition, the company carries out hydraulic engineering work such as stilling basins, retention basins, flood channels and harbour moles, places armourstone and the remediation of spoil heaps and outdoor facilities round off its offering, including contracts for Wismut since 2009. Natural stone and concrete are processed as key materials. Reference projects include Postplatz Dresden, the Federal Garden Show Koblenz with the Deutsches Eck, Postplatz Zwickau, the Loreley and the Chemnitz Model in road construction.
- Site
- Schwarzenberg
- Processes
- Civil engineering, Road construction, Paving work (natural stone paving, traditional road surfaces, slab laying), Landscaping / landscape design for private, commercial and municipal clients, Construction of natural stone walls / gravity walls, Hydraulic engineering (stilling basins, retention basins, flood channels, harbour moles, placing of, Concrete and masonry work, Remediation of spoil heaps and outdoor facilities
- Materials
- Natural stone, Concrete
- Founded
- 1999
- Industries
- Civil engineering, Road construction, Landscaping, Hydraulic engineering, Public space / municipal
- 01
Project preparation and quotation preparation
- 02
Earthworks and civil engineering
- 03
Concrete and masonry work
- 04
Paving and slab laying / wall construction
- 05
Acceptance and handover
Materials and fields of work
Natural stone
Material for traditional road surfaces, paving work and gravity walls.
Concrete
Used in civil and road construction, in concrete and masonry work as well as in hydraulic engineering.
Locations
Breitenbrunn
DEPlace of founding / registered office of the personally liable partner (Jan Beyreuther Verwaltungs GmbH)
Schwarzenberg
DEBranch / company headquarters
Services and reference projects




Inside the production

Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Civil engineeringEngineering | – | – | – | – | – |
| Road constructionEngineering | – | – | – | – | – |
| Paving work (natural stone paving, traditional road surfaces, slab laying)Assembly | – | – | – | – | Natural stone, Concrete |
| Landscaping / landscape design for private, commercial and municipal clientsEngineering | – | – | – | – | – |
| Construction of natural stone walls / gravity wallsAssembly | – | – | – | – | Natural stone |
| Hydraulic engineering (stilling basins, retention basins, flood channels, harbour moles, placing ofAssembly | – | – | – | – | Natural stone, Concrete |
| Concrete and masonry workAssembly | – | – | – | – | Concrete |
| Remediation of spoil heaps and outdoor facilitiesEngineering | – | – | – | – | – |
Additional services
Reference customers
Company history
- 1999
Founded in Breitenbrunn; paving work at the Erlabrunn Clinic
- 2000
Branch office founded in Schwarzenberg
- 2001
Driving safety centre Lausitzring
- 2002
Development of the Bahrebach on the A4 near Chemnitz
- 2003
Construction of a stilling basin, retention basin Lauenstein; flood remediation Sosabach
- 2004
Master craftsman's qualification as master road builder
- 2005
Postplatz Dresden (2005–2006)
- 2006
New construction of the Schwarzenberg stadium
- 2008
Paving work on the Waldschlößchen Bridge; start of the Federal Garden Show Koblenz with paving work at the Deutsches Eck (until 2011)
- 2009
Partnership with Wismut (since 2009)
- 2010
Redesign of the Platz des Bergmanns Johanngeorgenstadt; new construction of the Ingelheim harbour mole
- 2013
Remediation of the Luchsbach spoil heap in Pöhla; paving and slab laying at Forum Mittelrhein Koblenz (until 2014)
- 2016
Remediation of spoil heap 309 in Aue; start of road construction for the Chemnitz Model
- 2017
Paving work at the Loreley; hydraulic engineering for the rainwater retention basin Borna-Rötha (A72); remediation of the Hammerberg spoil heap in Bad Schlema
- 2018
Redesign of Doktor-Park Niederwürschnitz