Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
KACO new energy – Fertigung

Development and manufacturing of inverters for photovoltaics, battery storage systems, and converters for rail vehicles and industry.

KACO new energy Logo

KACO new energy GmbH – A Siemens Company

Neckarsulm · Erlenbach · Kassel · San Francisco · SeoulNew on Amplifa

1914Founded (KACO, Heilbronn)
1998/99Spin-off of KACO Gerätetechnik GmbH
4Sites in Germany
over 10 GWInverter capacity sold (2017)
since 30.04.2019Subsidiary of Siemens AG

About KACO new energy

KACO new energy GmbH, headquartered in Neckarsulm, develops and manufactures inverters for photovoltaic systems and battery storage systems as well as converters for rail vehicles and industrial applications. The product portfolio includes string and hybrid inverters of the blueplanet series for residential, commercial and industrial applications as well as utility-scale solar power plants, complemented by battery inverters, PV monitoring and PV accessories. Production takes place at the headquarters in Neckarsulm according to the Made in Germany principle; the developed Multi-MPPT technology and SiC semiconductor technology are used in the product lines. The company was founded in 1914 in Heilbronn and spun off in 1998/99 as KACO Gerätetechnik GmbH from the traditional manufacturer KACO; since April 30, 2019, it has been a 100-percent subsidiary of Siemens AG within Smart Infrastructure. In addition to manufacturing, KACO new energy offers a service portfolio including commissioning support, inspection, maintenance, analysis and repair, a 48-hour exchange service, as well as training, covered by a worldwide network of service centers and partners.

Site
Neckarsulm
Processes
Manufacturing of inverters for photovoltaic and battery storage systems, Manufacturing of converters for rail vehicles and industrial applications, Manufacturing of motor seals and shaft sealing rings (historical), Commissioning support, Inspection of PV systems, Preventive maintenance of inverters, Analysis and repair of inverters, Inverter exchange service (replacement shipping within 48 h, collection of the old unit)
Materials
Silicon carbide semiconductor technology, Multi-MPPT technology
Certificates
DIN EN ISO 9001:2015, DIN EN ISO 14001:2015, DIN ISO 45001:2018, DIN EN ISO 50001:2018, ISO/IEC 27001:2022
Founded
1914 (KACO
Industries
Photovoltaics (utility-scale, commercial/industrial, residential), Battery storage, PV-diesel, Rail vehicles and industry (converters), Energy industry/power supply
  1. 01

    Development (Neckarsulm, Kassel)

  2. 02

    Manufacturing/assembly of inverters (Neckarsulm)

  3. 03

    Logistics (Erlenbach)

  4. 04

    Sales and service

  5. 05

    Commissioning, maintenance, analysis and repair

  6. 06

    Inverter exchange service and repowering

Technologies and Processes

SiC

Silicon carbide semiconductor technology

Enables highly efficient inverters such as the blueplanet 125 TL3 for 1500-volt PV modules.

MPPT

Multi-MPPT technology

Flexible power optimization for complex and irregular roofs on commercial and industrial buildings.

Sites

Standort Neckarsulm

Neckarsulm

DE

Headquarters, development and production

  • Production line for solar inverters with Multi-MPPT technology (2023)
  • Production plant for string inverters (Plant 3)
  • Production plant for central inverters (Plant 1)
  • Production plant for components, rail/automotive sector (Plant 4)

Erlenbach

DE

Logistics center

Kassel

DE

Research and development center

San Francisco

US

Subsidiary (first international branch 2003–2005)

Seoul

KR

Service/branch office (KACO new energy INC.)

Products

blueplanet NX3 inverters
blueplanet NX3 invertersManufacturing · Residential PV and small commercial
Technical room with battery storage systems and inverters
Technical room with battery storage systems and invertersSystem solution · Battery storage
Inverter system CPSS 1500
Inverter system CPSS 1500Utility-scale · Solar power plants
Inverters for commercial roofs
Inverters for commercial roofsblueplanet 100/125 NX3 · Commercial/industrial

Inside the production

Tatvan solar power plant, Turkey
Tatvan solar power plant, Turkey
Reference PV system Grassau, Germany
Reference PV system Grassau, Germany
Rooftop system Beirut, Lebanon
Rooftop system Beirut, Lebanon
blueplanet 50 TL3 S, South Korea
blueplanet 50 TL3 S, South Korea
PV system Corsica, France
PV system Corsica, France
Rooftop system Harvest, Canada
Rooftop system Harvest, Canada
Reactive power optimization in industry
Reactive power optimization in industry
Company history
Company history

Industries

Photovoltaics (utility-scale, commercial/industrial, residential)Battery storagePV-dieselRail vehicles and industry (converters)Energy industry/power supply

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Manufacturing of inverters for photovoltaic and battery storage systemsAssembly–––––
Manufacturing of converters for rail vehicles and industrial applicationsAssembly–––––
Manufacturing of motor seals and shaft sealing rings (historical)Other–––––
Commissioning supportEngineering–––––
Inspection of PV systemsTesting–––––
Preventive maintenance of invertersAssembly–––––
Analysis and repair of invertersAssembly–––––
Inverter exchange service (replacement shipping within 48 h, collection of the old unit)Assembly–––––
Repowering / retrofitting of PV systems with blueplanet invertersAssembly–––––
Retrofit backup power function (backup power supply up to 10 kW, 3-phase)Engineering–––––
Trainings and webinars on inverters, PV systems and battery storage systemsEngineering–––––
ALoMCP setting adjustment (RoCoF/Vector-Shift configuration, software updates)Engineering–––––

5 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Production line for solar inverters with Multi-MPPT technologyKACO new energy––2023Neckarsulm
Production plant (string inverters, Plant 3)KACO new energy–––Neckarsulm
Production plant (central inverters, Plant 1)KACO new energy–––Neckarsulm
Production plant for components, rail/automotive sector (Plant 4)KACO new energy–––Neckarsulm
Production plantsKACO new energy2–2010-2012Neckarsulm

Additional services

Service portfolio: commissioning supportWarranty extensionInspectionPreventive maintenanceAnalysis and repairInverter exchange service (48h shipping in case of warranty claim)RepoweringBackup power function (blueplanet hybrid 10.0 TL3)Trainings and webinarsmyKACO.com customer portalPV system design (blueplanet PV-designer)PV monitoring (blue'Log X-series)ALoMCP program (UK)

Reference customers

EnBW Energie Baden-Württemberg AGKrannich Group GmbHEWS GmbH & Co. KGKNE Systemhaus GmbHGSW Gold Solar Wind Management GmbHebm-papst (SBF Renewable Energies)ELES (Slovenian transmission system operator, list of approved inverters)

Quality and Certifications

The processes are regularly audited by accredited bodies; certifications include DIN EN ISO 9001, ISO 14001, ISO 45001, ISO 50001 and ISO/IEC 27001 (Intertek). In 2006, the company was the first manufacturer in the industry to achieve CO2-neutral production.

EvidenceNeckarsulm
DIN EN ISO 9001:2015
DIN EN ISO 14001:2015
DIN ISO 45001:2018
DIN EN ISO 50001:2018
ISO/IEC 27001:2022

History

  1. 1914

    Founding of Kupfer-Asbest Co. by Gustav Bach, Albert Hirth and Gustav Klein in Heilbronn

  2. 1939

    Product range includes choppers, predecessors of today's inverters

  3. 1950

    KACO is the world's largest manufacturer of electromechanical choppers

  4. 1953

    First thyristor inverter

  5. 1994

    First developments in photovoltaics

  6. 1998/99

    Spin-off of KACO Gerätetechnik GmbH; the world's first transformerless PV string inverter PVI 2600

  7. 2003–2005

    Relocation of headquarters to Neckarsulm, logistics center Erlenbach, R&D center Kassel, first international branch in San Francisco

  8. 2006

    First manufacturer in the industry with CO2-neutral production

  9. 2007

    First transformerless 3-phase string inverter in the 30 kW class (Powador 30000xi)

  10. 2009

    Renaming to KACO new energy GmbH

  11. 2010–2012

    Two new energy-efficient plants in Neckarsulm; production start in Canada and the USA in 2011

  12. 2012

    First product solutions for energy storage

  13. 2014

    Double anniversary: 100 years of KACO and 15 years of KACO new energy

  14. 2017

    Inverter capacity sold exceeds 10 gigawatts

  15. 2018

    Acquisition of Energy Depot; blueplanet 125 TL3 with SiC technology

  16. 2019

    Siemens AG acquires 100% of the shares as of 30.04.2019

  17. 2021

    blueplanet NX1 for residential PV

  18. 2022

    blueplanet NX3 series for residential and small commercial applications

  19. 2023

    New production line in Neckarsulm with Multi-MPPT technology; Matthias Haag becomes CTO/CSO

  20. 2024

    25 years of KACO new energy; production line modernization completed; monitoring cloud with Siemens

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo