Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Development, manufacturing and repair of aircraft structures and complete aircraft for civil and military aviation.

KA

Kaelin Aero Technologies GmbH

Oberndorf-Hochmössingen (DE) · Sempach Station (CH) · Bioggio/Lugano (CH)New on Amplifa

2012Founded (CH company 2009)
3Locations (DE, CH)
ca. 330Components/year for Pilatus
600 tMax. press force hydroforming

Partner for Aircraft Structural Manufacturing and Component Production

Kaelin Aero Technologies GmbH is an aviation company headquartered in Oberndorf-Hochmössingen, specialised in civil and military aircraft structural manufacturing as well as the development and construction of complete aircraft. The company is an EASA Part 21/G production organisation and manufactures individual parts and assemblies from aluminium and steel – among other things as a long-standing supplier to Pilatus Flugzeugwerke AG with around 330 components per year, including the horizontal stabiliser, elevator and rudder as well as the passenger and cargo door for the PC-24. The manufacturing depth covers CAD design, 3D scanning and reverse engineering, CNC milling (3- and 5-axis), hydroforming with presses up to 600 t, press braking, certified aviation welding, heat treatment in accordance with AMS 2750F, surface treatment, tooling and fixture construction as well as structural assembly. In addition to component manufacturing, Kaelin carries out structural repairs and restorations worldwide – from field repairs in Indonesia to structural work on 22 F-5 Tigers in the US Navy's ARTEMIS project. Special focuses include the replica construction of historic aircraft such as the Junkers F 13 as well as the development of own aircraft models (Junkers A50 Junior, A60, B-100C) and modifications such as the Eye-in-the-Sky kit for AS350/H125 helicopters.

Site
Oberndorf-Hochmössingen
Processes
Design & Development (CAD design, 3D models, modifications, reverse engineering), 3D Scanning / Measurement, 3-Axis Milling (Gantry Milling Machines), 5-Axis Integral Milling (Hermle C22), Hydroforming (Hydroforming/Presses), Press Braking, Heat Treatment (Solution Annealing Aluminium, Stress-Relief Annealing Steel), Painting
Materials
Aluminium, Steel, Carbon Fibre (Fibre Composite), Metal (All-Metal Aircraft Construction), TIG Welding (ISO 4063)
Certificates
EASA Part 21/G Production Organisation, EN9100-Compliant Quality System, EASA Part 21/G, EN 9100-compliant
Founded
2012
Industries
Aviation industry (civil and military), Aircraft manufacturing, Helicopters
  1. 01

    Design & Development (CAD, 3D Scanning, Reverse Engineering)

  2. 02

    Tooling and Fixture Construction

  3. 03

    Single Piece Production (Milling, Forming, Welding)

  4. 04

    Heat Treatment

  5. 05

    Surface Treatment

  6. 06

    Non-Destructive Testing

  7. 07

    Structural Assembly

  8. 08

    Documentation and Shipping

Materials and Aviation-Specific Processes

Al

Aluminium

Main material for aircraft structures; milling, hydroforming, press braking, solution annealing, SurTec 650.

St

Steel

Milling, press braking, stress-relief annealing and TIG welding (material thickness 1.0–6.4 mm).

CFK

Carbon Fibre (Fibre Composite)

Used in the Eye-in-the-Sky lightweight structural element for AS350/H125 helicopters.

WIG

TIG Welding (ISO 4063)

Certified according to ISO 24394; material groups A TP1–TP5, B and F TP2/TP3.

Locations

Oberndorf-Hochmössingen

DE

Headquarters, Development & Manufacturing

Part weight / size
Milling up to 2050x1550x220 mm; presses 6000x910x820 mm
Lot size
Individual parts and assemblies
Materials
Aluminium, steel
  • 2× 3-axis gantry milling machines (HSC up to 32,000 rpm)
  • Hermle C22 5-axis machining centre
  • 4× hydraulic presses (hydroforming, max. 600 t)
  • Press brake 3 m / 110 t
  • Heat treatment furnace AMS 2750F (150–610 °C)
  • Paint booth 8x4x2.7 m
  • 3D scanner (accuracy down to 0.025 mm)

Sempach Station

CH

Repairs & Modifications

Bioggio (Lugano)

CH

Manufacturing, incl. Eye in the Sky Kit

Materials
Carbon fibre

Industries

Aviation industry (civil and military)Aircraft manufacturingHelicopters

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Design & Development (CAD design, 3D models, modifications, reverse engineering)Engineering–––––
3D Scanning / MeasurementTestingAccuracy down to 0.025 mm; volumetric accuracy––––
3-Axis Milling (Gantry Milling Machines)Machining–2050 mm × 1550 mm × 220 mm––Aluminium, Steel, Plastics
5-Axis Integral Milling (Hermle C22)Machining–450 mm × 600 mm × 330 mm––Aluminium, Steel
Hydroforming (Hydroforming/Presses)Forming–6000 mm × 910 mm × 820 mm––Aluminium
Press BrakingForming–3 m––Aluminium, Steel
Heat Treatment (Solution Annealing Aluminium, Stress-Relief Annealing Steel)Heat TreatmentTemperature range 150-610 °C, tolerance +/- 6 °C1300 mm × 2000 mm × 1000 mm––Aluminium, Steel
PaintingSurface–8 m × 4 m × 2.7 m–––
Corrosion Protection Treatment / SurTec 650Surface––––Aluminium
Non-Destructive Testing (Dye Penetrant Testing, Conductivity Testing, Coating Thickness Measurement)Testing––––Metal
Welding (TIG per ISO 4063, certified ISO 24394)Joining––––Aluminium, Steel
Tooling and Fixture ConstructionEngineering–––––
Structural Assembly (Assembly, Sealing, Painting, Corrosion Protection)Assembly–––––
Single Piece Production (Individual Part and Assembly Manufacturing)Machining––––Metal, Composites
Structural Repairs & RestorationsAssembly––––Metal, Composites

7 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
3-Axis Gantry Milling Machine–22050x1550x220 mm; HSC up to 32000 rpm (9 kW / 15 kW)–Oberndorf-Hochmössingen
5-Axis Machining CentreHermle C221Travel range 450x600x330 mm; 18,000 rpm, optional high-speed spindle up to 50,000 rpm–Oberndorf-Hochmössingen
Hydraulic Press (Hydroforming)–4Working area 6000x910x820 mm; max. press force 600 t; 2.1 mm/s–Oberndorf-Hochmössingen
Press Brake–1Braking length 3 m, 110 t pressing force–Oberndorf-Hochmössingen
Heat Treatment Furnace (AMS 2750F, Furnace Class 2)–1Interior dimensions 1500x2200x1200 mm; calibrated working zone 1300x2000x1000 mm; 150-610 °C–Oberndorf-Hochmössingen
Paint Booth–18x4x2.7 m–Oberndorf-Hochmössingen
3D Scanner (portable)––Scan range 0.05-8 m; accuracy down to 0.025 mm––

Additional services

Design & Development (CAD, 3D Scanning, Reverse Engineering, Prototype Construction)Single Piece Production (Milling 3-/5-Axis, Hydroforming/Presses up to 600 t, Press Braking)Heat Treatment (Solution Annealing Aluminium, Stress-Relief Annealing Steel, Furnace per AMS 2750F)Surface Treatment (Painting, Corrosion Protection, SurTec 650)Non-Destructive Materials TestingStructural AssemblyStructural Repairs & RestorationsTooling and Fixture ConstructionTechnical Modifications (e.g. Eye in the Sky Kit)

Reference customers

Pilatus Flugzeugwerke AGRUAG AGUS Navy (ARTEMIS project)Swiss Rotor ServicesKasaero GmbHMTAS Aviation GmbHJunkers Aircraft GmbH

Quality and Approvals

As an EASA Part 21/G production organisation with an EN9100-compliant quality system, Kaelin manufactures for certified production organisations. Inspection equipment includes 3D scanning, dye penetrant testing, conductivity and coating thickness measurement, eddy current testing as well as X-ray inspection via partners.

EvidenceOberndorf-Hochmössingen
EASA Part 21/G
EN 9100-compliant

History

  1. 2009

    Founding of Kaelin Aircraftstructure GmbH (CH); first contract: wing repair on a Super Constellation; start of the Junkers F 13 replica build.

  2. 2012

    Founding of Kaelin Aero Technologies GmbH (DE); construction of Hall 1 for Pilatus PC-6 components.

  3. 2013

    Start of the F 13 replica build with serial number 01 (Anneliese 2).

  4. 2015

    UCL replacement across the entire fleet of the Swiss Air Force; three years of RUAG support in Emmen.

  5. 2016

    Construction of Hall 2; start of production of Pilatus PC-24 components; first flight of the F 13 in Dübendorf.

  6. 2017

    MPVK kit installation on helicopters; start of construction of Hall 3; start of the F 13 small series.

  7. 2019

    Swiss site in Malters; start of construction of Hall 4; build-up of detailed manufacturing with milling machines.

  8. 2020

    Move into Hall 4.

  9. 2021

    Construction of the fatigue test cell and prototype of the Junkers A50 Junior; successful first flight at the end of 2021.

  10. 2022

    Founding of Junkers Aircraft GmbH; start of A60 development.

  11. 2023

    Structural assembly Pilatus PC-7 MKX; relocation of the Swiss site to Sempach; RUAG support in the US Navy's ARTEMIS project.

  12. 2024

    Development of the Eye-in-the-Sky modification for the AS350.

  13. 2025

    Launch of the site at Lugano Airport.

  14. 2026

    Successful first flight of the B-100C on 26 June.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo