Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Installation of standardized precast construction components, rope access and positioning work (SZP) and PPE inspection in accordance with BGG906

KA

Kaiser Metall und Maschinenbau UG (haftungsbeschränkt)

BirndorfNew on Amplifa

BirndorfRegistered Office
UG (haftungsbeschränkt)Legal Form

About Us

Kaiser Metall und Maschinenbau UG is an owner-managed business from Birndorf specializing in the installation of standardized precast construction components. Its range of services includes planning, 3D drawing and installation of railings, stairs and steel structures. In addition, installation work and services using rope access and positioning techniques (SZP) are offered in accordance with FISAT guidelines, TRBS 2121/3 as well as BGR 198 and 199. Owner Andreas Kaiser is a master machinist and precision mechanic, a rope access technician according to FISAT SZP Level 2, and holds the competency certificate in accordance with BGG906. Additionally, the inspection of personal protective equipment (PPE) in accordance with BGG906 is offered. The company serves customers from the steel construction and construction industries.

Site
Birndorf
Processes
Installation of standardized precast construction components: planning, drawing (3D), installation, Installation work and services using SZP (rope access and positioning techniques) in accordance with, Inspection of PPE in accordance with BGG906, Installation of standardized precast construction components (railings, stairs, steel structures), Planning and 3D drawing, Installation using rope access and positioning techniques (SZP)
Materials
Steel
Certificates
FISAT SZP Level 2, Competency Certificate BGG906
Industries
Steel Construction, Construction
  1. 01

    Planning

  2. 02

    3D Drawing

  3. 03

    Installation/Assembly of Precast Components

  4. 04

    PPE Inspection

Materials and Processes

Stahl

Steel

Material for railings, stairs and steel structures during installation.

Locations

Birndorf

DE

Registered Office

Materials
Steel

Industries

Steel ConstructionConstruction

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Installation of standardized precast construction components: planning, drawing (3D), installationAssembly––––Steel
Installation work and services using SZP (rope access and positioning techniques) in accordance withAssembly–––––
Inspection of PPE in accordance with BGG906Inspection–––––

Additional services

Installation of standardized precast construction components (railings, stairs, steel structures)Planning and 3D drawingInstallation using rope access and positioning techniques (SZP)Inspection of PPE in accordance with BGG906

Quality

Work using SZP is carried out in accordance with FISAT guidelines, TRBS 2121/3, BGR 198 and 199; PPE inspection is carried out in accordance with BGG906.

EvidenceBirndorf
FISAT SZP Level 2
Competency Certificate BGG906
Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo