Installation of standardized precast construction components, rope access and positioning work (SZP) and PPE inspection in accordance with BGG906
Kaiser Metall und Maschinenbau UG (haftungsbeschränkt)
BirndorfNew on Amplifa
About Us
Kaiser Metall und Maschinenbau UG is an owner-managed business from Birndorf specializing in the installation of standardized precast construction components. Its range of services includes planning, 3D drawing and installation of railings, stairs and steel structures. In addition, installation work and services using rope access and positioning techniques (SZP) are offered in accordance with FISAT guidelines, TRBS 2121/3 as well as BGR 198 and 199. Owner Andreas Kaiser is a master machinist and precision mechanic, a rope access technician according to FISAT SZP Level 2, and holds the competency certificate in accordance with BGG906. Additionally, the inspection of personal protective equipment (PPE) in accordance with BGG906 is offered. The company serves customers from the steel construction and construction industries.
- Site
- Birndorf
- Processes
- Installation of standardized precast construction components: planning, drawing (3D), installation, Installation work and services using SZP (rope access and positioning techniques) in accordance with, Inspection of PPE in accordance with BGG906, Installation of standardized precast construction components (railings, stairs, steel structures), Planning and 3D drawing, Installation using rope access and positioning techniques (SZP)
- Materials
- Steel
- Certificates
- FISAT SZP Level 2, Competency Certificate BGG906
- Industries
- Steel Construction, Construction
- 01
Planning
- 02
3D Drawing
- 03
Installation/Assembly of Precast Components
- 04
PPE Inspection
Materials and Processes
Steel
Material for railings, stairs and steel structures during installation.
Locations
Birndorf
DERegistered Office
- Materials
- Steel
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Installation of standardized precast construction components: planning, drawing (3D), installationAssembly | – | – | – | – | Steel |
| Installation work and services using SZP (rope access and positioning techniques) in accordance withAssembly | – | – | – | – | – |
| Inspection of PPE in accordance with BGG906Inspection | – | – | – | – | – |
Additional services
Quality
Work using SZP is carried out in accordance with FISAT guidelines, TRBS 2121/3, BGR 198 and 199; PPE inspection is carried out in accordance with BGG906.
| Evidence | Birndorf |
|---|---|
| FISAT SZP Level 2 | |
| Competency Certificate BGG906 |