Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Kaley – Fertigung

Industrial surface coating: KTL, powder coating, blasting technology, assembly and logistics from Garrel.

Kaley Logo

Kaley Lackier- und Pulvertechnik GmbH & Co. KG

Eichkamp 2a-4, 49681 Garrel · Koppelweg 12, 49681 GarrelNew on Amplifa

1996Powder coating in the company since
2 sitesin Garrel (Eichkamp, Koppelweg)
L 600 × W 2400 × H 3500 mmmax. component dimensions
8 powder booths, 2 Kuka robotsCoating systems

About Kaley

Kaley Lackier- und Pulvertechnik GmbH & Co. KG is a system partner for industrial surface coating with sites in Garrel, district of Cloppenburg. The service portfolio includes blasting technology as mechanical pretreatment, cathodic dip painting (KTL) including zinc phosphating, powder coating and, in individual cases, 2K wet painting with water-based, high-solid and solvent-reduced paints. Coated components made of steel and galvanized steel are finished up to dimensions of L 600 mm, W 2400 mm and H 3500 mm. In addition, the company carries out assembly work (torque-controlled screwdriving technology, pneumatic and electric riveting technology), cable assembly, packaging and delivery via its own vehicle fleet using just-in-time and just-in-sequence processes with EDI connectivity. Customers come from industry and trade, in particular from the lighting and electronics sectors. An in-house laboratory carries out regular quality tests such as coating thickness measurement and salt spray tests.

Site
Garrel
Processes
Blasting technology (blasting / mechanical pretreatment), Zinc phosphating (conversion layer, layer thickness 1.5 - 3 µm), Cathodic dip painting (KTL) with Powercron 6200HE dip paint from PPG, Powder coating (curing at 190 °C), Powder coating in KTL combination (polyester, epoxy or polyurethane powder), 2K wet painting / wet painting (water-based paints, high-solid paints, solvent-reduced paints), Assembly / fastening technology (joining of individual parts and modules), Screwdriving technology (torque-controlled)
Materials
Steel, galvanized steel, Blasting technology, Cathodic dip painting (KTL), Powder coating, 2K wet painting, Galvanized steel
Certificates
ISO 9001:2015
Industries
Industry, Trade, Lighting and electronics
  1. 01

    Blasting technology (mechanical pretreatment)

  2. 02

    Zinc phosphating (conversion layer)

  3. 03

    KTL cathodic dip painting

  4. 04

    Powder coating / 2K wet painting

  5. 05

    Assembly & cable assembly

  6. 06

    Packaging & logistics (own vehicle fleet)

Materials & Processes

STR

Blasting technology

Mechanical pretreatment with steel grit S 280 (0.4–0.7 mm) to remove scale, oxide layers and contaminants.

KTL

Cathodic dip painting (KTL)

Electrodeposition painting with zinc phosphating (1.5–3 µm) and Powercron 6200HE from PPG for high corrosion protection.

PUL

Powder coating

Electrostatic powder application and curing at 190 °C, mainly polyester powder coatings in RAL and special colors.

KL

2K wet painting

Conventional coating with water-based, high-solid and solvent-reduced paints for functional and decorative surfaces.

STA

Steel

Typical substrate for blasting technology, KTL and powder coating.

VST

Galvanized steel

Substrate for powder coating which, in combination with KTL, receives long-term corrosion protection.

Sites

Standort Garrel, Eichkamp 2a-4

Garrel, Eichkamp 2a-4

DE

Main site: Lackier- und Pulvertechnik GmbH & Co. KG

Materials
Steel, galvanized steel
  • 8 industrial powder booths
  • 2 fully automatic Kuka coating robots
  • Blasting system
  • KTL dip painting line with zinc phosphating, rinsing zones and ultrafiltration

Garrel, Koppelweg 12

DE

Site of Kaley Beschichtungstechnik GmbH

Components

KTL-coated component
KTL-coated componentCathodic dip painting · Industry
Powder-coated workpiece
Powder-coated workpiecePowder coating · Industry
Assembly / cable assembly
Assembly / cable assemblyAssembly · Lighting and electronics

Inside the production

Blasting technology: pretreatment of the steel surface
Blasting technology: pretreatment of the steel surface
KTL dip painting line
KTL dip painting line
Powder booth
Powder booth
Assembly and fastening technology
Assembly and fastening technology
Logistics with own vehicle fleet
Logistics with own vehicle fleet

Industries

IndustryTradeLighting and electronics

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Blasting technology (blasting / mechanical pretreatment)Surface––––Steel
Zinc phosphating (conversion layer, layer thickness 1.5 - 3 µm)Surface––––Steel
Cathodic dip painting (KTL) with Powercron 6200HE dip paint from PPGSurface–600 mm × 2400 mm × 3500 mm––Steel
Powder coating (curing at 190 °C)Surface–600 mm × 2400 mm × 3500 mm––Steel, galvanized steel
Powder coating in KTL combination (polyester, epoxy or polyurethane powder)Surface–600 mm × 2400 mm × 3500 mm––Steel
2K wet painting / wet painting (water-based paints, high-solid paints, solvent-reduced paints)Surface––––Steel
Assembly / fastening technology (joining of individual parts and modules)Assembly–––small batches – large quantities–
Screwdriving technology (torque-controlled)Assembly–––––
Riveting technology (pneumatic and electric)Joining–––––
Cable assembly (cables, cable bundles, cable harnesses, with connectors, contacts or ferrules)Assembly–––small series – large series, custom builds–
Magnetic coating thickness measurement according to DIN EN ISO 2178Testing–––––
Salt spray testing according to DIN EN ISO 9227Testing–––––
Logistics & vehicle fleet (just-in-time, just-in-sequence, packaging, EDI)Assembly–––––

4 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
industrial powder booth–8Components up to L 600 mm, W 2400 mm, H 3500 mm–Garrel
fully automatic coating robotKuka2––Garrel
Blasting system––––Garrel
KTL dip painting line (with pretreatment/zinc phosphating, rinsing zones, ultrafiltration)––Components up to L 600 mm, W 2400 mm, H 3500 mm–Garrel

Additional services

Blasting technology (pretreatment)Cathodic dip painting (KTL) incl. zinc phosphatingPowder coating2K wet painting / wet paintingAssembly (screwdriving and riveting technology, fastening technology)Cable assembly (harnesses, modules)PackagingLogistics with own vehicle fleet (just-in-time / just-in-sequence, EDI)In-house laboratory (coating thickness measurement DIN EN ISO 2178, salt spray test DIN EN ISO 9227)

Quality

The in-house laboratory carries out regular quality tests, including magnetic coating thickness measurement according to DIN EN ISO 2178 and salt spray testing according to DIN EN ISO 9227. The company is certified according to ISO 9001:2015.

EvidenceGarrel
ISO 9001:2015

History

  1. 1996

    Start of use of the powder coating process

  2. Founded by Matthias and Gerhard Kaley; 45 years of company practice

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo