Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Manufacturer and installation partner for scraper bridges, tank internals and aeration and circulation technology for wastewater treatment plants and waterworks.

KA

Karo Anlagenbau GmbH

Essen (Oldenburg)New on Amplifa

2013Founded
approx. 20Employees
1,000 m²Storage and production space
52,500 mmMax. bridge length of scraper bridge
> 250Plants with floating sludge tilt weir in operation

About us

Karo Anlagenbau GmbH was founded in 2013 in Essen (Oldenburg) and specialises in the technical equipment of wastewater treatment plants and the installation of waterworks. The company manufactures scraper bridges as full-wall bridge systems from its own production – as longitudinal scrapers for tanks with longitudinal flow and as circular scrapers for circular primary and secondary clarifiers – with all variants of drive technology (central drive, positive drive with rack/dog pinion/pinion) and sludge removal (blade and suction scraper systems). Further products are stainless steel box channels, submerged effluent pipes, rigid inlet systems, tank internals for process optimisation, aeration systems for fine-bubble compressed-air aeration, and the floating sludge tilt weir, which is in use in more than 250 plants. The workshop with 1,000 m² of storage and production space works with stainless steel 1.4301/1.4571 and hot-dip galvanised or coated steel; scraper bridges leave the factory pre-wired with travel gear, slewing-ring bearing and slip-ring body. Installation and commissioning, conversion of existing plants and technical maintenance services are carried out by four in-house installation teams with fully equipped workshop vans; PLC control technology is developed in-house.

Site
Essen (Oldenburg)
Processes
Scraper construction (longitudinal and circular scrapers, scraper bridges), Full-wall bridge systems made of bent sheets with laser cutting (connection holes/cut-outs), Stainless steel box channel (effluent channels, welded on both sides), Submerged effluent pipes (polygon shape, miter cuts), Floating sludge tilt weir (SS-tilt weir system), Aeration systems fine-bubble compressed-air aeration (tube, disc, oval plate and, Circulation with submersible motor mixers (propellers up to 2,500 mm diameter), Baffle board bridge for circulation (full-wall girder bridge)
Materials
Stainless steel 1.4301, Stainless steel 1.4571, Steel, hot-dip galvanised, Steel, galvanised, coated, Concrete, Steel, galvanised and coated
Certificates
ISO 9001
Founded
2013
Employees
approx. 20 (self-rep
Industries
Wastewater and water technology (wastewater treatment plants, waterworks), Sludge treatment, Municipal wastewater associations and urban drainage utilities
  1. 01

    Design (3D CAD)

  2. 02

    Sheet metal working (bending, laser cutting)

  3. 03

    Welding and pre-assembly

  4. 04

    Surface protection (hot-dip galvanising/coating)

  5. 05

    Factory pre-assembly incl. cabling

  6. 06

    On-site installation

  7. 07

    Electrical/PLC control and commissioning

  8. 08

    Maintenance and service

Materials and processes

1.4301

Stainless steel 1.4301

Standard material for scraper bridges, box channels, inlet systems and pipework in wastewater plant construction.

1.4571

Stainless steel 1.4571

Acid-resistant stainless steel for bridge systems with increased corrosion resistance requirements.

St feuerverzinkt

Steel, hot-dip galvanised

For racks, rails of the positive drive and scraper bridges with long-lasting corrosion protection.

St verzinkt, beschic

Steel, galvanised and coated

Combined surface protection for bridge systems according to customer specification.

Beton

Concrete

Bridge material for centrally driven scraper systems in addition to steel bridges.

Site

Essen (Oldenburg)

DE

Headquarters, production, warehouse, installation, service

Materials
Stainless steel 1.4301/1.4571, steel hot-dip galvanised/coated
  • Production hall 1,000 m²
  • 3D design system (CAD, since 2015)
  • Laser cutting for connection holes/cut-outs
  • 4 workshop vans for installation teams

Industries

Wastewater and water technology (wastewater treatment plants, waterworks)Sludge treatmentMunicipal wastewater associations and urban drainage utilities

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Scraper construction (longitudinal and circular scrapers, scraper bridges)Installation–Bridge length up to 52,500 mm––Stainless steel 1.4301, Stainless steel 1.4571, Steel, hot-dip galvanised
Full-wall bridge systems made of bent sheets with laser cutting (connection holes/cut-outs)Joining–Bridge length up to 52,500 mm––Stainless steel 1.4301, Stainless steel 1.4571, Steel, hot-dip galvanised/coated
Stainless steel box channel (effluent channels, welded on both sides)Joining––––Stainless steel
Submerged effluent pipes (polygon shape, miter cuts)Installation––––Stainless steel
Floating sludge tilt weir (SS-tilt weir system)Installation–Tilt weir 3 m wide––Stainless steel
Aeration systems fine-bubble compressed-air aeration (tube, disc, oval plate andInstallation–––––
Circulation with submersible motor mixers (propellers up to 2,500 mm diameter)Installation–Propeller up to 2,500 mm diameter–––
Baffle board bridge for circulation (full-wall girder bridge)Installation–13500 mm––Stainless steel 1.4301
Scrapers with positive drive (rack/dog pinion/pinion, circular pre-bending of rack andInstallation––––Steel, hot-dip galvanised
Centrally driven scrapers / rake mechanismsInstallation–––––
Rigid inlet systems (stainless steel cylinders, welded units, pre-assembled/bolted on site)Installation––––Stainless steel
Tank internals for process optimisationInstallation––––Stainless steel
Pipework construction (air ducts, compressor station piping, pumping station installation, heatInstallation––––Stainless steel (SS piping)
Blower stations/compressor stations (assembly, connection, commissioning of rotary lobe compressors)Installation–––––
Rehabilitation/conversion of scrapers (removal/renewal of floor blades, suction scraper attachments,Installation––––Stainless steel, Steel
Technical maintenance service (pulling of aeration grids and floor blades, repair, overhaul)Installation–––––
Design/execution drawings in the 3D systemEngineering–––––
PLC programming and switchgear/control systemsEngineering–––––

4 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Production hall (storage and production space)–11,000 m²2015Essen/Oldenburg, Johannes-Gutenberg-Str. 12
3D design system (CAD)–––2015 (EinfEssen/Oldenburg
Laser cutting (creation of holes/cut-outs in sheets)––––Essen/Oldenburg
Workshop van (fully equipped, for installation teams)–4 (number––mobile use

Additional services

Scraper construction (longitudinal and circular scrapers, full-wall bridge systems)Tank internalsAeration and circulation technologyRehabilitation and conversionTechnical maintenance service, repair and overhaulDesign (3D since 2015) and in-house productionInstallation with own skilled fitters (4 installation teams)Floating sludge removal (floating sludge tilt weir)Stainless steel box channels / effluent channelsSubmerged effluent pipesRigid inlet systemsPipework constructionBlower and compressor stations (assembly, connection, commissioning)Conversion to positive drive (rack/dog pinion/pinion)Centrally driven scrapers and rake mechanismsRenewal of assemblies and floor bladesPulling of aeration grids and floor blades for maintenanceElectrical/PLC control technology and commissioning

Reference customers

Abwasserverband Braunschweig (Steinhof)Stadtentwässerungsbetriebe Köln (Köln-Rodenkirchen)OOWV Brake a.d. UnterweserEWE Wasser (Edewecht)Town of WildeshausenTown of WiesmoorTown of NortheimTown of Bad HarzburgTown of LüneburgWasserverband Gifhorn (Wittingen)Zweckverband GKW WendlingenMunicipal utilities Bad BerleburgAggerverband GummersbachCity of KarlsruheIn-house wastewater department PasewalkTown of GeestlandCatchment area incl. Cloppenburg, Vechta, Quakenbrück, Damme, Dinklage

Quality

Quality is ensured by factory pre-assembly (including floor blades pre-assembled at a scale of 1:1) and inspection of installed components on site, e.g. by diver deployment to check the seating of floor blades. Certifications are not published.

EvidenceEssen (Oldenburg)
ISO 9001

History

  1. 2013

    Founding of Karo Anlagenbau GmbH in July 2013; first floating sludge tilt weir installations in Rehden and Pirmasens Land in Nov/Dec 2013.

  2. 2014

    Since June 2014, the baffle board bridge (circulation bridge) has been in operation at the Wiesmoor wastewater treatment plant.

  3. 2015

    Occupancy of the new production hall in Essen (Oldenburg) with 1,000 m² in August 2015; design of execution drawings in the 3D system.

  4. 2021

    Delivery of two large circular scrapers with a bridge length of 52,500 mm to Karlsruhe.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo