Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Recovery of combustible waste at the Emmenspitz waste-to-energy plant with electricity, district heating and zinc recycling production

KE

kenova AG

Zuchwil · Balsthal-Klus · Grenchen · Langenthal · Lyssach · Olten · Hub KrauchthalNew on Amplifa

1970Founded
ca. 221'000 t/yearwaste recovered
ca. CHF 56 million (2024)operating revenue
176 municipalitiescatchment area Bern and Solothurn
4 incineration linesEmmenspitz waste-to-energy plant

About kenova AG

kenova AG, headquartered in Zuchwil SO, operates the Emmenspitz waste-to-energy plant (KVA), one of the larger waste incineration plants in Switzerland. The company handles the disposal, treatment and recovery of combustible waste and the resulting residues for 176 shareholder and contract municipalities in the cantons of Bern and Solothurn with around 534'000 inhabitants. Approximately 221'000 tonnes of waste are incinerated each year. The waste is delivered to the plant by rail via six transfer stations or delivered directly. The energy generated during incineration is fed into the AEK grid for electricity production and supplied as hot water to the district heating networks of AEK Energie AG and Regio Energie Solothurn. With FLUREC, kenova has been operating a zinc recycling plant since 2011 to recover zinc from fly ash. In 2025, the new waste-to-energy plant (successor plant KEBAG Enova) went into operation.

Site
Zuchwil
Processes
Disposal, treatment and recovery of combustible waste, Electricity production, District heating supply (hot water), Zinc recycling from fly ash (FLUREC), Rail transport/long-distance transport, Visitor tours
Materials
Incineration of combustible municipal waste, Zinc recycling from fly ash, Hot water district heating
Founded
1970
Industries
Waste disposal/waste recovery, Energy generation, District heating
  1. 01

    Waste acceptance at the waste-to-energy plant and transfer stations

  2. 02

    Long-distance transport by rail to the Emmenspitz waste-to-energy plant

  3. 03

    Incineration in grate firing with steam boiler

  4. 04

    Flue gas cleaning (electrostatic precipitator, wet scrubber, SNCR, dioxin

  5. 05

    Energy extraction as electricity and hot water

  6. 06

    Residue treatment including FLUREC zinc recycling from fly ash

Processes and Recovery

KVA

Incineration of combustible municipal waste

Recovery of combustible waste from 176 municipalities in grate firing plants with energy extraction.

FLUREC

Zinc recycling from fly ash

Acid fly ash washing with recovery of zinc from the incineration residues.

FERNWÄRME

Hot water district heating

Supply of the district heating networks of AEK Energie AG (Luterbach, Derendingen) and Regio Energie Solothurn (Zuchwil, Solothurn).

Locations

Zuchwil

CH

Emmenspitz waste-to-energy plant, headquarters and electricity/district heating production

Materials
Combustible waste, fly ash
  • 4 incineration lines (grate firing, steam boiler, electrostatic precipitator, wet scrubber)
  • FLUREC zinc recycling plant
  • High-pressure steam condensation turbine 21.6 MW
  • Wastewater treatment
  • Rail siding/loading facility

Balsthal-Klus

CH

Transfer station

Grenchen

CH

Transfer station

Langenthal

CH

Transfer station

Lyssach

CH

Transfer station

Olten

CH

Transfer station

Hub Krauchthal

CH

Transfer station (KEWU)

Industries

Waste disposal/waste recoveryEnergy generationDistrict heating

Additional services

Disposal, treatment and recovery of combustible wasteElectricity productionDistrict heating supply (hot water)Zinc recycling from fly ash (FLUREC)Rail transport/long-distance transportVisitor tours

Reference customers

176 municipalities in the cantons of Bern and Solothurn (shareholder and contract municipalities)AEK Energie AGRegio Energie Solothurn

History

  1. 1970

    Founding of the waste disposal company (Kehrichtbeseitigungs-AG)

  2. 1974

    Groundbreaking for the waste incineration plant

  3. 1976

    Commissioning of the waste-to-energy plant with lines 1 and 2; transfer stations Grenchen, Lyssach and Langenthal

  4. 1982

    Commissioning of the Olten transfer station, connection agreement with the ZKO

  5. 1990

    Commissioning of incineration line 3 with denitrification

  6. 1993

    Commissioning of the rail siding and loading facility Emmenspitz

  7. 1997

    Commissioning of the dioxin reduction system

  8. 1998

    Commissioning of the fly ash washing plant

  9. 2000

    Commissioning of the Balsthal-Klus transfer station

  10. 2002

    Commissioning of incineration line 4; disposal agreement with KEWU AG

  11. 2006

    Commissioning of the sixth transfer station in Hub, Krauchthal (KEWU)

  12. 2011

    Commissioning of FLUREC – the world's first zinc recycling plant in a waste-to-energy plant

  13. 2012

    Commissioning of the 21.6 MW high-pressure steam condensation turbine

  14. 2014

    The Kehrichtbeseitigungs-AG KEBAG becomes KEBAG AG

  15. 2015

    Successor plant project KEBAG Enova officially launched

  16. 2020

    Groundbreaking and start of construction of the new building (KEBAG Enova)

  17. 2024

    KEBAG becomes kenova AG

  18. 2025

    Commissioning of the new waste-to-energy plant; operating revenue CHF 56.1 million

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo