
Engineering Office for Interim Management, Project Management, and Construction in Plant and Apparatus Engineering
Kirotec AG
Langwiesstrasse 16, 8360 Wallenwil (bei Eschlikon), SchweizNew on Amplifa
About Kirotec AG
Kirotec AG is an engineering office based in Wallenwil near Eschlikon in the Swiss canton of Thurgau. The company, with two employees, offers technical services in the form of interim mandates: project management, construction and development, and consulting in the area of exhaust gas cleaning (DeNOx, CO and HC reduction, particle filters). Roland Kilchsperger, Dipl. M. Eng. HTL, brings 23 years of experience in leading international plant construction projects and 28 years in product development in plant and apparatus engineering; constructions are created in 3D CAD using Solidworks and Autodesk Inventor. Reference projects include large compressor systems for the petrochemical industry (project scope of 21 million USD), exhaust gas cleaning systems for gas engine power plants, the development of an ash elevator for large boilers, and an EU-funded HORIZON2020 project for particle filter development for cruise ships (CHF 1.4 million). Clients include Burckhardt Compression, Hug Engineering, Schmid Energy Solutions, and Aerni AG. Languages: German, English, and French.
- Site
- Wallenwil (bei Eschlikon)
- Processes
- Interim Management, Project Management, Construction/Development, Exhaust Gas Cleaning Consulting (DeNOx, CO and HC Reduction, Particle Filters), 3D CAD Construction (Solidworks, Autodesk Inventor), Plant Construction Project Management (Compressor Systems, Exhaust Gas Cleaning Systems), Exhaust Gas Cleaning Consulting, Administration
- Materials
- Solidworks / Autodesk Inventor, Plant Construction Project Management (EPC), Exhaust Gas Cleaning Consulting
- Certificates
- ISO 9001, CE-Compliant Plant Documentation
- Employees
- 2
- Industries
- Petrochemical Industry, Energy/Power Plants (Gas Engines), Shipping (Cruise Ships), Environmental Technology/Exhaust Gas Cleaning, Biomass Energy/Large Boilers, Plant and Apparatus Engineering
- 01
Consulting / Requirements Gathering
- 02
Design / Development (3D CAD)
- 03
Project Management / Procurement
- 04
Production and Installation Supervision
- 05
Commissioning and Plant Documentation
Design Tools and Procedures
Solidworks / Autodesk Inventor
3D CAD systems for construction, development, and creation of manufacturing drawings.
Plant Construction Project Management (EPC)
Leading plant construction projects including costs, deadlines, procurement, and documentation.
Exhaust Gas Cleaning Consulting
Design of DeNOx, CO, and HC reduction systems as well as particle filters for gas engines and shipping.
Location

Wallenwil (bei Eschlikon)
CHOffice / Administration
- 3D CAD (Solidworks, Autodesk Inventor)
Reference Projects



Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Interim ManagementEngineering | – | – | – | – | – |
| Project ManagementEngineering | – | – | – | – | – |
| Construction/DevelopmentEngineering | – | – | – | – | – |
| Exhaust Gas Cleaning Consulting (DeNOx, CO and HC Reduction, Particle Filters)Engineering | – | – | – | – | – |
| 3D CAD Construction (Solidworks, Autodesk Inventor)Engineering | – | – | – | – | – |
| Plant Construction Project Management (Compressor Systems, Exhaust Gas Cleaning Systems)Engineering | – | – | – | – | – |
Additional services
Reference customers
Quality and Standard Implementation
The project management includes the implementation of relevant standards, such as API standards for petrochemical plants, SIL safety requirements, explosion-proof execution, European machine directives, and adaptation of QM systems according to ISO 9001; plant documentation is created in compliance with CE among others.
| Evidence | Wallenwil |
|---|---|
| ISO 9001 | |
| CE-Compliant Plant Documentation |
History
- 2013
Roland Kilchsperger starts as Interim Manager; mandates at Aerni AG (Head of Technology, Restructuring) and Schmid Energy Solutions (Ash Elevator, Silo Cover)
- 2013-2015
Plant engineering project large compressor system for Burckhardt Compression, two EPC projects for the Chinese market, 21 million USD
- 2015-2016
Interim mandate project manager organizational projects at Burckhardt Compression: new article number system in SAP and improved delivery planning
- 2016-2019
Development project particle filter for cruise ships for Hug Engineering, EU funding project HORIZON2020, CHF 1.4 million