Independent engineering company for planning and consulting in infrastructure, water/wastewater and the environment.
Klinger und Partner Ingenieurbüro für Bauwesen und Umwelttechnik GmbH
70499 Stuttgart (Headquarters) · 73660 Urbach (Branch office) · 74072 Heilbronn (Subsidiary office)New on Amplifa
About KuP
Klinger und Partner GmbH (KuP) is an independent consulting engineering company based in Stuttgart that has been providing technical planning services and complementary services in the fields of water, environment and transport since 1989. Its range of services covers investigation, expert reports, planning, construction supervision, project management and safety coordination across all service phases from concept development through to aftercare. Key focus areas are transport route planning (motorways, federal, state and district roads), water and wastewater engineering including wastewater treatment plants, stormwater retention basins, sewer and pipe jacking projects, landfill planning, contaminated site management and demolition, as well as photovoltaics and wastewater heat recovery. Structural engineering topics include bridges, stormwater and wastewater structures, and special civil engineering, designed in reinforced and in-situ concrete construction, complemented by 3D and BIM planning and acoustic investigations. Clients are predominantly public-sector bodies such as regional councils, DEGES, cities and wastewater associations, but also industrial clients such as MANN+HUMMEL.
- Site
- Stuttgart
- Processes
- Consulting services / technical engineering company (investigation, expert reports, planning,, Acoustic investigations / noise protection planning, 3D and BIM planning, Planning of classified transport routes (motorways, federal, state and district roads), Planning of municipal transport infrastructure (local roads, roundabouts, cycle paths, bus stops,, Planning of structures (bridges, stormwater/wastewater structures, special civil engineering,, Structural refurbishment / concrete repair (in accordance with DafStB-Rili SIB, PCC repair,, Pipe jacking (man-entry, open face, curved drive DN 1400 mm, radius 360 m)
- Materials
- Concrete / reinforced concrete (structural fabric, ÜK II, in-situ concrete, shotcrete), PCC coating / PCC repair mortar (wastewater-resistant), Bored pile wall / interlocking bored pile wall, Steel beams (pre-drilled, shotcrete support), Reinforced concrete / in-situ concrete, PCC repair mortar and coating, Shotcrete, Bored pile wall
- Certificates
- DIN ISO 9001:2015, ISO 9001
- Founded
- 1989
- Industries
- Infrastructure, Water/Wastewater, Circular economy, Contaminated sites/Demolition, Renewable energies, Occupational safety
- 01
Investigation and site survey
- 02
Expert reports and feasibility studies
- 03
Concept and preliminary design
- 04
Approval planning
- 05
Tendering and contract award
- 06
Construction supervision
- 07
Project management
- 08
Operations management and aftercare
Construction methods and materials
Reinforced concrete / in-situ concrete
Construction method for wastewater structures, stormwater retention basins, shafts and bridges, partly in monitoring class ÜK II.
PCC repair mortar and coating
Wastewater-resistant concrete repair in accordance with DafStB-Rili SIB for wastewater treatment plant structures.
Shotcrete
Excavation support and reinforced structural strengthening, e.g. at junction structures and refurbishments.
Bored pile wall
Interlocking bored pile walls as watertight excavation support, e.g. at the Herrenwaag stormwater retention basin.
Locations
Stuttgart
DEHeadquarters
Urbach
DEBranch office
Heilbronn
DESubsidiary office
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Consulting services / technical engineering company (investigation, expert reports, planning,Engineering | – | – | – | – | – |
| Acoustic investigations / noise protection planningEngineering | – | – | – | – | – |
| 3D and BIM planningEngineering | – | – | – | – | – |
| Planning of classified transport routes (motorways, federal, state and district roads)Engineering | – | – | – | – | – |
| Planning of municipal transport infrastructure (local roads, roundabouts, cycle paths, bus stops,Engineering | – | – | – | – | – |
| Planning of structures (bridges, stormwater/wastewater structures, special civil engineering,Engineering | – | – | – | – | Reinforced concrete (ÜK II), Concrete |
| Structural refurbishment / concrete repair (in accordance with DafStB-Rili SIB, PCC repair,Surface | – | – | – | – | Reinforced concrete, PCC coating, Shotcrete |
| Pipe jacking (man-entry, open face, curved drive DN 1400 mm, radius 360 m)Engineering | – | 185 m (project example) × DN 1400 mm | – | – | In-situ concrete |
| Sewer rehabilitation using the inline method (DN 300)Engineering | – | DN 300 | – | – | – |
| Planning of wastewater treatment / wastewater structures (wastewater treatment plants, stormwaterEngineering | – | – | – | – | Reinforced concrete |
| Planning of wastewater heat recovery (feasibility studies, wastewater heat exchangers)Engineering | – | – | – | – | – |
| Landfill planning, landfill closure, surface sealing, aftercareEngineering | – | – | – | – | – |
| Contaminated site management / remediation planning / building fabric investigation / demolitionEngineering | – | – | – | – | – |
| Groundwater protection / hydrogeology / modelling & visualisationEngineering | – | – | – | – | – |
| Photovoltaic and wastewater heat recovery planning (renewable energies)Engineering | – | – | – | – | – |
| Occupational safety / safety coordinationEngineering | – | – | – | – | – |
| Development of building areas / development planning (road construction, supply and disposal lines,Engineering | – | – | – | – | – |
| Structural engineering (LPH 1-6) and project planning HOAI LPH 1-8, construction supervision, EMSREngineering | – | – | – | – | – |
Additional services
Reference customers
Quality
KuP has an actively practised quality management system that has been certified to DIN ISO 9001 (now 9001:2015) since 1995 and has been audited since 2022 within the Qualitätsverbund Planer am Bau quality association. The QM system forms the basis for continuous improvement processes within the company.
| Evidence | Stuttgart |
|---|---|
| ISO 9001 |
History
- 1989
Founded as an independent engineering company for technical planning services.
- 1995
First certification to DIN ISO 9001 for UW Umweltwirtschaft GmbH.
- 2012
Transfer of the ISO 9001 certification to Klinger und Partner GmbH (21.03.2012).
- 2022
Member of the Qualitätsverbund Planer am Bau quality association.