Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Kolb – Fertigung

Service, modernisation and planning of steam, hot-water and thermal-oil systems – from certified welding shop to 24/7 emergency service.

Kolb Logo

Kolb Industriekessel Service GmbH

Dillenburg · Landsberg (Saalekreis) · Berlin · KerpenNew on Amplifa

1952Founded (Omnical plant, Dillenburg)
60+Employees
4Locations in Germany
650+Maintenance customers
500+Successful projects

About Kolb Industriekessel Service GmbH

Kolb Industriekessel Service GmbH, based in Dillenburg, is a full-service provider for the industrial boiler house. The company plans and designs steam, hot-water and thermal-oil systems including 3D-CAD planning and 3D scanning, modernises existing systems, and performs maintenance, repair, boiler cleaning, TÜV inspections, plant operation and a 24/7 emergency service. As a certified welding shop in accordance with AD 2000 HP0 and ISO 3834-3, it manufactures and repairs pressure vessels, piping and boiler components in steel and stainless steel. The range of services also includes mobile rental boiler systems, control technology, energy optimisation and conversion to alternative energy sources such as hydrogen and biomass. Customers include companies from the food and beverage industry, chemicals, utilities, hospitals and laundries. With more than 650 maintenance customers and over 500 projects, the company operates nationwide at four locations.

Site
Dillenburg
Processes
Planning and design of boiler systems (steam, hot-water and thermal-oil systems) with, Welding repairs and fabrication of pressure vessels, piping and boilers, Maintenance, repair and cleaning (flue-gas and water side) of boiler systems, Modernisation, replacement and commissioning of boiler systems incl. project management, Plant operation and 24/7 emergency service for boiler systems, 3D scanning for planning and documentation (boiler houses, piping, production areas, storage areas), Design of pressure vessels, piping and heat exchangers according to Pressure Equipment Directive,, TÜV inspection and 44th BImSchV adaptation of boiler systems
Materials
Stainless steel, Steel (pressure vessels, piping, boilers), Steel
Certificates
Certified welding shop AD 2000 HP0, ISO 3834-3, Installer's licence GAS (pressure equipment), AD 2000 HP0 (certified welding shop)
Founded
1952
Employees
60+
Industries
Food industry, Beverage industry, Utilities / district heating, Chemical industry, Hospitals, Laundries
  1. 01

    Consulting & requirements analysis

  2. 02

    3D scanning & 3D-CAD planning

  3. 03

    Design according to AD 2000, TRD, EN 13445/13480

  4. 04

    Manufacturing & welding work (pressure vessels, piping)

  5. 05

    Assembly & commissioning

  6. 06

    Maintenance, TÜV inspection, plant operation & emergency service

Materials & Processes

St

Steel

Material for pressure vessels, piping and boiler components in the certified welding shop.

V2A

Stainless steel

Used e.g. for corrosion-resistant heat exchangers, as in the condensing-boiler application in the steam boiler house of Metzgerei Esser.

Locations

Standort Dillenburg

Dillenburg

DE

Headquarters / Service

Materials
Steel, stainless steel
  • Certified welding shop (AD 2000 HP0, ISO 3834-3)
  • 3D scanning system

Landsberg (Saalekreis)

DE

Branch office (Kolb Steamserv GmbH)

Berlin

DE

Branch office (Kolb Steamserv GmbH)

Kerpen

DE

Location of Kolb Anlagenbau GmbH (parent company)

Components & Systems

Boiler system retrofit
Boiler system retrofitModernisation · Beverage industry
Custom steam boiler house
Custom steam boiler housePlanning & assembly · Food industry

Inside the production

Plant engineering on site
Plant engineering on site
Steam boiler house under construction
Steam boiler house under construction
Site overview Germany
Site overview Germany

Industries

Food industryBeverage industryUtilities / district heatingChemical industryHospitalsLaundriesBreweriesDairiesWood processingPower plantsOthers (industry and trade)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Planning and design of boiler systems (steam, hot-water and thermal-oil systems) withEngineering–––––
Welding repairs and fabrication of pressure vessels, piping and boilersJoining––––Steel
Maintenance, repair and cleaning (flue-gas and water side) of boiler systemsSurface–––––
Modernisation, replacement and commissioning of boiler systems incl. project managementAssembly–––––
Plant operation and 24/7 emergency service for boiler systemsAssembly–––––
3D scanning for planning and documentation (boiler houses, piping, production areas, storage areas)Testing–––––
Design of pressure vessels, piping and heat exchangers according to Pressure Equipment Directive,Engineering–––––
TÜV inspection and 44th BImSchV adaptation of boiler systemsTesting–––––

2 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Certified welding shop (AD 2000 HP0, ISO 3834-3 certified)––––Dillenburg
3D scanning system–––––

Additional services

Planning (3D-CAD, 3D scanning)ModernisationMaintenanceBoiler repairBoiler cleaningPlant operationEmergency service 24/7TÜV inspectionControl technologySystem optimisation / energy optimisationConversion per 44th BImSchVMobile boiler systems (rental boiler systems)Alternative energy sources (hydrogen, biomass)Welding workAssembly and commissioningRemote monitoring

Reference customers

J.G. KNOPF'S SOHN GmbH & Co. KGCarl-von-Basedow-Klinikum Saalekreis gGmbHUCM URSA CHEMIE GmbHBell Flavors & Fragrances GmbHKölner StudierendenwerkMVV Enamic GmbHRefresco Deutschland GmbHStadtwerke Kempen GmbHWolf Essgenuss GmbHOppacher Mineralquellen GmbH Co. KGENVIA Mitteldeutsche Energie AGStadtwerke Weißenfels Energienetze GmbHTechnische Werke Naumburg GmbHContinental AGMetzgerei Esser

Quality & Certifications

The welding shop is certified in accordance with AD 2000 HP0 and ISO 3834-3 and is thus approved for the design, manufacture and repair of pressure equipment and boilers. The GAS installer's licence (pressure equipment) is valid until 2027.

EvidenceDillenburg
AD 2000 HP0 (certified welding shop)
ISO 3834-3
Installer's licence GAS (pressure equipment)

History

  1. 1949

    Foundation of the works as Neuhütte (Dillenburg)

  2. 1952

    Buderus plant Omnical (Metallgesellschaft, Krupp, Feldmühle, Krauss Maffei); GWK/WRK power plant systems, up to 1,000 employees

  3. 1986

    Babcock Omnical Industriekessel GmbH (BOI), industrial boilers 1–200 t/h, marine boilers, export to Southeast Asia

  4. 2003

    Danstoker A/S – Danstoker DK & Omnical; GWK over 50 t/h, biomass boilers; after insolvency continuation with approx. 80 employees

  5. 2010

    Affiliation with Thermax Ltd. India; headcount temporarily over 100

  6. 2015

    Viessmann Div. Plant Engineering – OMNICAL Industrieservice GmbH, approx. 30 employees

  7. 2021

    Acquisition of OMNICAL Industrieservice GmbH by Kolb Anlagenbau GmbH; renaming to Kolb Industriekessel Service GmbH

  8. 2022

    Establishment of Landsberg branch (Saalekreis); 60th anniversary of Kolb Anlagenbau GmbH

  9. 2024

    Expansion of the Landsberg and Berlin branches; partner agreement with RAWEI

  10. 2026

    Foundation of Kolb Steamserv GmbH; carve-out of the Landsberg and Berlin locations

  11. 1962

    Foundation of KOLB KG by Heinz Kolb (predecessor of Kolb Anlagenbau GmbH)

  12. 2006

    Renaming to KOLB ANLAGENBAU GMBH

  13. 2015

    Philipp Schiffer takes over management of Kolb Anlagenbau GmbH and 25% of the shares

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo