Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Master Craftsman for Sanitary and Heating Technology: Bathroom Planning, Installation, and Heating Construction in Lahnstein and Surroundings

KR

Krech Sanitär-Heizung

LahnsteinNew on Amplifa

more than 25 yearsExperience in Sanitary and Heating
LahnsteinLocation

About Us

Krech Sanitär-Heizung is a Master Craftsman for Sanitary and Heating Technology based in Lahnstein near Koblenz. The company offers bathroom planning, sanitary installation, and heating construction for private customers as well as for commercial and public clients. The services include the installation of water pipes, floor-level shower systems, washbasin systems, underfloor heating, controlled room ventilation, and gas condensing and warm air heater systems. An emergency service is also available for existing customers outside of regular business hours. For construction projects, the company collaborates with other trades such as carpenters, electricians, and tilers. Completed reference projects include the age-appropriate renovation of about 50 bathrooms at the Lahnblick Seniors Center in Bad Ems, the redesign of a bathhouse at Clariant Masterbatch in Lahnstein with 21 floor-level shower units, and the complete sanitary and ventilation installation of the DRK Rescue Station Braubach.

Site
Lahnstein
Processes
Sanitary Installation (Bathroom, Kitchen, Water Pipes), Heating Construction (Gas Condensing Boiler, Underfloor Heating, Warm Air Heaters), Ventilation Installation / Controlled Room Ventilation, Bathroom Planning, Sanitary, Heating Construction, Emergency Service for Existing Customers outside of business hours, Coordination with Other Trades (Carpenters, Electricians, Tilers)
Materials
Plastic, Copper, Brass (Fittings), Brass, Steel
Industries
Private Customers (Bathroom, Kitchen, Heating), Seniors Centers, Industry, Public Institutions, Private Customers/Bathroom-Kitchen-Heating, Industry (Bathhouses/Changing Rooms)
  1. 01

    Bathroom Planning

  2. 02

    Sanitary Installation

  3. 03

    Heating and Ventilation Construction

  4. 04

    Coordination with Other Trades

  5. 05

    Commissioning and Service/Emergency Call

Materials & Processes

KU

Copper

Use for water pipes in sanitary and heating installations.

MS

Brass

Fitting material, e.g., thermal self-closing valves.

PVC

Plastic

Material for piping in sanitary and heating systems.

S

Steel

Material of heating systems like warm air heaters.

Locations

Lahnstein

DE

Master Craftsman for Sanitary and Heating Technology

Materials
Copper, Plastic, Brass, Steel

Industries

Private Customers (Bathroom, Kitchen, Heating)Seniors CentersIndustryPublic InstitutionsPrivate Customers/Bathroom-Kitchen-HeatingIndustry (Bathhouses/Changing Rooms)Public Institutions (DRK Rescue Station)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Sanitary Installation (Bathroom, Kitchen, Water Pipes)Assembly––––Plastic, Copper, Brass
Heating Construction (Gas Condensing Boiler, Underfloor Heating, Warm Air Heaters)Assembly––––Steel, Plastic, Copper
Ventilation Installation / Controlled Room VentilationAssembly–––––
Bathroom PlanningEngineering–––––

Additional services

Bathroom PlanningSanitaryHeating ConstructionEmergency Service for Existing Customers outside of business hoursCoordination with Other Trades (Carpenters, Electricians, Tilers)Ventilation InstallationUnderfloor HeatingControlled Room Ventilation

Reference customers

Seniorenzentrum Lahnblick, Bad EmsClariant Masterbatch, LahnsteinDRK Rettungswache Braubach

Reference Projects & History

  1. 2007

    Renovation/Extension of Lahnblick Seniors Center, Bad Ems: approx. 50 bathrooms renovated age-appropriately, construction time approx. 1.25 years during operation.

  2. 2013

    Renovation/Extension of Clariant Masterbatch Bathhouse, Lahnstein: 21 new floor-level shower units, row washing units, and automatic urinals.

  3. 2014

    New construction DRK Rescue Station Braubach: complete sanitary and ventilation installation, approx. 180 m² underfloor heating, two warm air heaters, controlled room ventilation, Junkers gas condensing boiler 42 kW.

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account