Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Manufacture of control cabinets and complete solutions for building and industrial automation

LA

LADWIG Steuerungstechnik GmbH

Stäbelow (Rostock site)New on Amplifa

1992Founded
GmbH, HRB 4266 Amtsgericht RostockLegal form
Service areas

About us

LADWIG Steuerungstechnik GmbH manufactures control cabinets for building and industrial automation in its own production facilities and, as a full-service provider, offers planning, project engineering, DDC/BMS installation, PLC programming, commissioning, and service and maintenance of HVAC systems. The electronic components installed in the control cabinets are carefully selected and interconnected; every system is thoroughly tested after manufacture. The company supports projects from detailed planning through installation and tested programming to regular maintenance, including new development, extension and modernization of existing systems as well as web-visualized operator programs. Customers include, among others, building management for office buildings, hospitals, universities, research institutions, hotels, industry and the maritime sector. Founded in 1992 in Rostock, the family-owned company has been based since 2016 in a newly constructed company building in Stäbelow near Rostock and is managed by Jörg and Christian Ladwig.

Site
Stäbelow
Processes
Control cabinet construction, DDC/BMS installation / wiring, Building and industrial automation (PLC programming, HVAC control systems), Service & maintenance of HVAC systems, DDC/BMS installation / DDC/BMS wiring, Building automation, Industrial automation, Service & maintenance
Materials
Programmable logic controller (PLC), DDC/BMS technology (measurement, control, regulation), HVAC control systems
Certificates
Thorough system testing after manufacture
Founded
1992
Industries
Building automation, HVAC technology, Shipbuilding, Public buildings, Healthcare, Hotels
  1. 01

    Planning and project engineering

  2. 02

    Control cabinet construction in own production

  3. 03

    PLC programming

  4. 04

    DDC/BMS installation / wiring

  5. 05

    Testing of the system

  6. 06

    Commissioning and adjustment

  7. 07

    Service & maintenance

Services and Processes

SPS

Programmable logic controller (PLC)

Evaluation, control and visualization of signals in the control cabinet, either via PLC or hardware.

MSR

DDC/BMS technology (measurement, control, regulation)

Wiring and connections on control cabinets and field devices for HVAC technology.

HLK

HVAC control systems

Customer-specific control systems for heating, ventilation and air conditioning technology with a focus on energy efficiency.

Locations

Stäbelow

DE

Headquarters with production and company building (Rostock site)

Materials
Control cabinets, DDC/BMS technology, HVAC control systems

Industries

Building automationHVAC technologyShipbuildingPublic buildingsHealthcareHotelsResearch institutionsIndustryHVAC technology (heating, ventilation, air conditioning)Shipbuilding (historical)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Control cabinet constructionAssembly–––––
DDC/BMS installation / wiringAssembly–––––
Building and industrial automation (PLC programming, HVAC control systems)Engineering–––––
Service & maintenance of HVAC systemsAssembly–––––

Additional services

Control cabinet constructionDDC/BMS installation / DDC/BMS wiringBuilding automationIndustrial automationService & maintenancePlanning and project engineeringProgramming (PLC)CommissioningProgram updatesSupply of control cabinets

Reference customers

Spiegel publishing building HamburgAlbertinen Hospital HamburgEricus office building HamburgNestlé plant SchwerinHamburg University of Applied SciencesWismar University of Applied SciencesUKSH Kiel/LübeckAirbus HamburgMax Planck InstituteNordex RostockMiltenyi Biotec TeterowDLR BremenWarnow Tunnel RostockOstseestadion RostockHotel Neptun RostockVolkstheater RostockSteigenberger Hotel ZingstKiel railway stationAltona Children's Hospital HamburgAtlantic Hotel Kiel/LübeckBerolina Haus BerlinEKZ Neukölln Berlin

Quality

After manufacture, every system is thoroughly tested. High quality standards apply to the materials as well as to the processes in production.

EvidenceStäbelow
Thorough system testing after manufacture

History

  1. 1992

    Founding of EAV Jörg Ladwig GmbH by Dipl.-Ing. Jörg Ladwig on 09.11.1992; production of control cabinets for shipbuilding, including for the MS „Saßnitz“.

  2. 2011

    Completion of the new Spiegel publishing house project with the “Ericus” office building in Hamburg – supply of control cabinets and DDC/BMS wiring.

  3. 2013

    Relaunch under the new name LADWIG Steuerungstechnik GmbH with a new logo.

  4. 2016

    Relocation to the newly constructed company building in Stäbelow, previously Rostock site.

  5. 2019

    Christian Ladwig was appointed managing director alongside Jörg Ladwig.

  6. 2022

    30th company anniversary.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo