Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Leyrer + Graf – Fertigung

Austrian construction company for building construction, civil engineering, energy + telecom, timber engineering as well as concrete, asphalt and gravel production.

Leyrer + Graf Logo

Leyrer + Graf Baugesellschaft m.b.H.

Gmünd · Horn · Schwechat · Vienna · Traun · Marchtrenk · Zwettl · Bad Pirawarth · Hannersdorf · Loosdorf · Villach · Lassee · Schrems · Sierning · Seibersdorf · Krems · Hagenbrunn · AistersheimNew on Amplifa

1926Founded
2,800Employees
19Locations in Austria
€635 millionConstruction output
250,000 t/yearGravel production Schrems (20 ha quarry)

About Leyrer + Graf

Founded in 1926, Leyrer + Graf Baugesellschaft m.b.H. is an owner-managed construction company headquartered in Gmünd, Lower Austria, and one of the largest construction companies in Austria. The group employs around 2,800 staff at 19 locations and generated €635 million in construction output. Its range of services covers building construction, civil engineering (road works, earthworks, engineering and concrete construction, pipeline and railway construction), energy + telecom, timber engineering through Graf-Holztechnik GmbH, and engineering services as general and total contractor. In addition, the company operates its own production facilities: a concrete plant in Gmünd (Graf Beton), asphalt plants in Schrems, Lassee, Sierning and Seibersdorf, a gravel plant in Schrems with a 20 ha quarry and annual production of up to 250,000 t, as well as recycling plants in Krems and Hagenbrunn. Projects are digitally supported with BIM, Lean Construction Management and modern surveying.

Site
Gmünd
Processes
Building construction, Civil engineering (road construction, earthworks, engineering and concrete construction, pipeline, Energy + telecom (electrical engineering, energy infrastructure, telecom technology), Timber engineering/Timber construction, Engineering (total contractor, general planning, surveying, Graf Building Solution), Concrete production (Graf Beton, Gmünd concrete plant), Asphalt hot mix production (base layers, asphalt concrete, coloured asphalts, drain asphalts), Quarry/raw material extraction and processing (crushing, screening)
Materials
Concrete, Asphalt, Timber, Grader material 0/32 mm, Bedding sand 0/4 mm, Crushed grit 2/4 mm, Crushed grit 8/16 mm, Premium crushed sand EBK 0/2 mm
Certificates
ISO 37301 (Compliance Management System), ISO 37001 (Anti-Corruption Management System), ÖGNI certificate "Sustainable Construction Site" (first Austrian construction, ISO 37001 (Anti-Corruption Management), ÖGNI "Sustainable Construction Site", ISO 9001
Founded
1926
Employees
2800
Industries
Construction industry, Residential construction, Commercial and industrial construction, Transport infrastructure (road, rail), Energy supply, Telecommunications
  1. 01

    Raw material extraction (Schrems quarry, crushing and screening)

  2. 02

    Concrete and asphalt production

  3. 03

    Recycling (construction debris, recycled asphalt)

  4. 04

    Engineering and planning (BIM, general planning, surveying)

  5. 05

    Construction execution building construction, civil engineering, energy +

  6. 06

    Service (24-hour fault service energy + telecom)

Materials and Production Processes

BET

Concrete

Own concrete production at the Gmünd concrete plant (Graf Beton) for building construction and civil engineering.

ASM

Asphalt hot mix

Produced since 1964; base layers, asphalt concrete, coloured asphalts, drain and recycled asphalts.

HOLZ

Timber

Used in timber construction through Graf-Holztechnik GmbH.

0/32

Grader material 0/32 mm (EN 13242)

For unbound base layers in road construction.

0/63

Frost protection 0/63 mm (EN 13242)

For unbound base layers in road construction.

2/4

Crushed grit 2/4 mm (EN 13242, EN 13043, EN 12620)

For base layers, asphalt and concrete aggregate as well as paving grit.

0/2

Premium crushed sand EBK 0/2 mm (EN 13242, EN 13043, EN 12620)

For base layers, asphalt and concrete aggregate and joint sand.

4/8

Premium grit 4/8 mm (EN 13242, EN 13043)

For unbound base layers and asphalt aggregate.

32/63

Rock chippings FBG 32/63 mm

As drainage gravel.

Service Areas and Construction Services

Building construction – installation of precast concrete elements on site
Building construction – installation of precast concrete elements on siteBuilding construction · Residential and commercial construction
Civil engineering – Seestadt Vienna construction project
Civil engineering – Seestadt Vienna construction projectCivil engineering · Transport infrastructure
Energy + telecom – pipeline construction with cable plough
Energy + telecom – pipeline construction with cable ploughPipeline construction · Energy and telecom infrastructure
Timber construction – Breitenbrunn lakeside pool
Timber construction – Breitenbrunn lakeside poolTimber engineering · Public construction
Asphalt paving on the road
Asphalt paving on the roadAsphalt production · Road construction

Inside the production

100 years of Leyrer + Graf – journey through time
100 years of Leyrer + Graf – journey through time
Building construction project Radisson Red Hotel
Building construction project Radisson Red Hotel
Graf Beton concrete plant
Graf Beton concrete plant
Management: CEO Stefan Graf, CFO Christian Bruckner, COO Peter Haas
Management: CEO Stefan Graf, CFO Christian Bruckner, COO Peter Haas
Company headquarters Gmünd
Company headquarters Gmünd

Industries

Construction industryResidential constructionCommercial and industrial constructionTransport infrastructure (road, rail)Energy supplyTelecommunicationsHealth + leisure

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Building constructionConstruction/Building construction––––Concrete, Timber
Civil engineering (road construction, earthworks, engineering and concrete construction, pipelineConstruction/Civil engineering––––Concrete, Asphalt, Gravel
Energy + telecom (electrical engineering, energy infrastructure, telecom technology)Construction/Infrastructure–––––
Timber engineering/Timber constructionPlastics/Timber processing––––Timber
Engineering (total contractor, general planning, surveying, Graf Building Solution)Engineering/Planning–––––
Concrete production (Graf Beton, Gmünd concrete plant)Casting/Concrete––––Concrete
Asphalt hot mix production (base layers, asphalt concrete, coloured asphalts, drain asphalts)Construction/Asphalt––––Asphalt
Quarry/raw material extraction and processing (crushing, screening)Construction/Raw materials––––Gravel, Crushed grit, Fill material, Frost protection
Recycling (recycling plants Krems, Hagenbrunn)Construction/Recycling––––Recycled asphalt, Construction debris
Building Information Modeling (BIM), Lean Construction Management, augmented realityEngineering/Digitalisation–––––

8 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Asphalt mixing plant/hot mix plant––––Lassee, Schrems, Sierning, Seibersdorf
Jaw crusher–1––Schrems gravel plant
Cone crusher–3––Schrems gravel plant
Pre-separation screen–1––Schrems gravel plant
Screening plant–5––Schrems gravel plant
Conveyor belts––––Schrems gravel plant
Concrete plant––––Gmünd (Graf Beton)
Recycling plant––––Krems, Hagenbrunn

Additional services

Building constructionCivil engineering (road construction, earthworks, engineering and concrete construction, pipelineEnergy + telecom (electrical engineering, energy infrastructure, telecom technology)Timber engineering (Graf-Holztechnik)Engineering (total contractor, general planning, surveying, Graf Building Solution)Concrete productionAsphalt productionRaw material extraction (gravel)RecyclingBIMLean Construction ManagementGeneral and total contractor24-hour fault service energy + telecom

Quality and Certification

The gravel products are subject to continuous internal and external quality control as part of CE marking. The company operates a compliance management system according to ISO 37301 and an anti-corruption management system according to ISO 37001 and, in 2025, was the first Austrian construction company to be awarded the ÖGNI certificate "Sustainable Construction Site".

EvidenceGmünd
ISO 37301 (Compliance Management System)
ISO 37001 (Anti-Corruption Management)
ÖGNI "Sustainable Construction Site"
ISO 9001

Company History

  1. 1926

    Foundation of a construction and carpentry business by Dipl.-Ing. Anton Leyrer.

  2. 1947

    Franz Graf joins as a technical apprentice; in 1954 passes master builder examination as the youngest master builder in Austria at that time.

  3. 1958

    Master builder Franz Graf becomes co-partner and managing director for the construction division.

  4. 1964

    Death of Dipl.-Ing. Anton Leyrer; Franz Graf takes over sole management; start of asphalt production.

  5. 1968–1987

    Development into a leading regional master builder company.

  6. 1988

    Opening of the first operating site in Vienna.

  7. 1993

    Foundation of Graf-Holztechnik GmbH in Horn; first step into the Czech Republic.

  8. 2000er

    Operating sites in Linz, Schwechat and Bad Pirawarth; foundation of Graf Beton, asphalt plant Sierning, asphalt mixing plant Lassee, gravel plant Schrems.

  9. 2013

    Stefan Graf takes over management from Franz Graf; joint venture with Ploier + Hörmann Bau GmbH.

  10. 2015

    Relocation of Leyrer + Graf GmbH from Linz to Traun.

  11. 2016

    Operating site of Graf-Holztechnik GmbH in Loosdorf.

  12. 2017

    Acquisition of R & Z Bau GmbH in Villach.

  13. 2019

    Ploier + Hörmann Bau GmbH becomes a 100% subsidiary; operating site Loosdorf.

  14. 2021

    Further operating site in Traun with its own building construction division.

  15. 2022

    Operating site of Graf-Holztechnik in Aistersheim; opening of the 1,400 m² training centre in Horn; award "Austria's Best Managed Companies".

  16. 2023

    Acquisition of Netz + Plan LeitungsdokumentationsgesmbH; acquisition of 50% of the shares in Regrub Waste & Recycling GmbH.

  17. 2024

    New office location Marchtrenk.

  18. 2025

    Peter Haas becomes COO; opening of the "Büro 21" office building; ÖGNI certificate "Sustainable Construction Site".

  19. 2026

    100th anniversary; modernisation of the Horn workshop; new construction yard with workshop in Schwechat.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo