Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Develops Thacker Pass in Nevada for the production of battery-grade lithium carbonate for the North American supply chain

LI

Lithium Americas Corp.

Vancouver, Canada · Reno, USA · Orovada, USA · Winnemucca, USANew on Amplifa

TSX/NYSE: LACListed (Lithium Americas Corp.)
40.000 t/JahrPhase 1: Nominal capacity battery-grade Li2CO3 (Target:
160.000 t/JahrPlanned total capacity over 5 phases
44,5 Mt LCETotal Measured & Indicated Mineral Resource (31.12.2024)
ca. 350Planned full-time jobs in Phase-1 operation (Construction:

About Lithium Americas

Lithium Americas Corp. is a company listed on the TSX and NYSE (TSX/NYSE: LAC), developing the Thacker Pass Lithium project in Humboldt County, Northern Nevada (USA). Thacker Pass hosts the world's largest measured lithium reserve (Measured & Indicated) and is planned to reach a nominal total capacity of 160,000 t/year of battery-grade lithium carbonate (Li2CO3) over five phases. Phase 1, with a nominal capacity of 40,000 t/year, is under construction (construction started March 2023); mechanical completion is targeted for the end of 2027, with ramp-up to commercial production by 2028. The operation includes a shallow open-pit mine and a processing plant for sedimentary lithium ore. The Lithium Technical Development Center in Reno, a laboratory and piloting facility, validates the Flowsheet and has demonstrated the production of battery-grade lithium carbonate in a continuous production process; it is certified according to ISO 9001:2015. General Motors is a Joint Venture partner with a 38% stake in Thacker Pass and a long-term offtake customer. Phase 1 is expected to create over 2,000 jobs in construction and around 350 full-time jobs in operation.

Site
V6C 2X8 Vancouver, BC
Processes
Lithium Mining (Open-Pit Mine, Shallow Open-Pit Mine), Chemical Processing into Lithium Carbonate (Li2CO3, battery grade), Continuous Production Process (Piloting at Lithium Technical Development Center), Validation of the Thacker Pass Flowsheet and pilot production of battery-grade lithium carbonate, Community and Indigenous Engagement, Supply of battery-grade lithium carbonate (Li2CO3)
Materials
Lithium Carbonate, Sedimentary Lithium (Ore), Lithium Carbonate (battery grade)
Certificates
ISO 9001:2015
Industries
Lithium Mining/Processing, Battery/EV Supply Chain, Mining, Critical Minerals
  1. 01

    Mining of sedimentary lithium ore in a shallow open-pit mine

  2. 02

    Processing of ore in the Processing Facility

  3. 03

    Chemical conversion to battery-grade lithium carbonate (Li2CO3)

  4. 04

    Flowsheet validation and piloting at Lithium Technical Development

  5. 05

    Delivery to offtake customers (including General Motors)

Products and Processes

Li2CO3

Lithium Carbonate (battery grade)

End product from Thacker Pass for the North American battery and e-mobility supply chain.

Li-Erz

Sedimentary Lithium (Ore)

Raw material from the shallow open-pit mine in the McDermitt Caldera region, processed into lithium carbonate.

Sites

Vancouver

CA

Corporate Headquarters (3260 – 666 Burrard St)

Reno

US

Office and Lithium Technical Development Center (Laboratory and Piloting Facility, 522 S Rock Blvd., Suite 200)

Materials
Lithium Carbonate (Li2CO3), Thacker-Pass Ore
  • Laboratory and Piloting Facility (Continuous Production Process)

Orovada

US

Thacker Pass Project: Mine and Processing Plant, Humboldt County, Northern Nevada

Materials
Sedimentary Lithium (Ore), Lithium Carbonate (Li2CO3)
  • Processing Facility (Phase 1 Processing Plant)
  • Heavy Equipment (Dozers, Haul Trucks, Water Trucks)

Winnemucca

US

Office (20 W First St)

Industries

Lithium Mining/ProcessingBattery/EV Supply ChainMiningCritical Minerals

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Lithium Mining (Open-Pit Mine, Shallow Open-Pit Mine)Smelting––––Sedimentary Lithium (Thacker Pass Ore)
Chemical Processing into Lithium Carbonate (Li2CO3, battery grade)Engineering––––Lithium Carbonate (Li2CO3)
Continuous Production Process (Piloting at Lithium Technical Development Center)Testing––––Lithium Carbonate (Li2CO3)

3 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Pilot Plant–1––Reno, Nevada (Lithium Technical Development Center, 522 S Rock Blvd.)
Processing Facility (Phase 1 Processing Plant)––––Thacker Pass, Orovada, NV
Heavy Equipment (Dozers, Haul Trucks, Water Trucks)––––Thacker Pass, Orovada, NV

Additional services

Validation of the Thacker Pass Flowsheet and pilot production of battery-grade lithium carbonateCommunity and Indigenous EngagementSupply of battery-grade lithium carbonate (Li2CO3)

Reference customers

General Motors (JV Partner with 38% stake in Thacker Pass; 20-year offtake agreement for up to 100%)Orion Resource Partners (strategic investor)US Department of Energy (ATVM Loan of 2.23 billion USD)

Quality

The Lithium Technical Development Center in Reno is certified according to ISO 9001:2015 and validates the Thacker Pass Flowsheet, including all recycling streams, as well as the production of battery-grade lithium carbonate in a continuous production process. The mine's safety performance is regularly recognized, including with the Nevada Mining Association Operator Safety Award 2025 (1st Place Non-Metals) and the Mine Operator Safety Award 2026.

EvidenceVancouverRenoOrovadaWinnemucca
ISO 9001:2015

History

  1. 2021

    Thacker Pass received the Record of Decision from the U.S. Bureau of Land Management (BLM) in January 2021.

  2. 2023

    Phase 1 construction started in March 2023; Separation of Lithium Americas Corp. (Board and Management take over) in October 2023.

  3. 2024

    Largest contingent loan guarantee ever awarded by the U.S. Department of Energy for a strategic materials project (ATVM Loan of 2.23 billion USD); Awards: ZETA Supply Chain Groundbreaker Award, NCET Lithium Loop Award, Mackay School Corporate Appreciation Award, AEMA Platinum Award for

  4. 2025

    Fastmarkets Voltas Award 'Best New Project' for Thacker Pass; Nevada Mining Association 2025 Operator Safety Award (1st Place Non-Metals); Luke Colton joins as EVP & CFO in January 2025.

  5. 2026

    Nevada Mining Association Mine Operator Safety Award (July 2026, over 3 million working hours without Lost Time Incident); Jonathan Evans recognized as 'Leader of the Year' (Fastmarkets Voltas Awards); Richard Gerspacher EVP Capital Projects & Operations starting 1.1.2026; Financing over 175

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo