
Injection-molded parts and assemblies made of thermoplastics and TPE with in-house toolmaking in Sinntal

Lohmann Kunststoff GmbH
Sinntal-Sterbfritz, Seemeweg 9 (Plant 1) · Sinntal-Sterbfritz, Weinstraße 3 (Plant 2)New on Amplifa
Plastics and toolmaking from a single source
Lohmann Kunststoff GmbH is a medium-sized family company in Sinntal-Sterbfritz that has been active in injection molding since 1965 and works exclusively as a supplier to industrial customers. At Plant 1, technical injection-molded parts are produced from thermoplastics, thermoplastic elastomers (TPE) and high-performance plastics, including 2K parts and overmolded metal parts, cables and electronic components. Production runs in 3-shift operation on 19 fully automatic Arburg machines with clamping forces from 600 to 2,000 kN; for medical technology, a machine with a cleanroom of clean air class ISO 7 is available. Where required, injection-molded parts are assembled into assemblies together with purchased parts. The sister company Lohmann Werkzeug GmbH designs and manufactures injection molds up to 1,000 kg, including CAD/CAM design, cavity machining with a travel range of up to 300 x 500 mm, as well as maintenance and repair of existing tools. Customers come from the automotive industry, medical technology and general industry.
- Site
- Sinntal-Sterbfritz
- Processes
- Injection molding of technical parts made of thermoplastics and TPE (thermoplastic elastomers), 2K, Injection mold making (prototype, multi-cavity and family molds), tool design CAD/CAM,, Milling, HSC milling, sinker EDM, wire EDM, start-hole drilling, drilling, turning,, Maintenance, repair and overhaul of injection molds (own and external), Assembly of assemblies (purchased parts + injection-molded parts), Injection-molded parts made of thermoplastics and TPE, Assembly of assemblies, 2K parts (two-component)
- Materials
- Thermoplastics, TPE (thermoplastic elastomers), High-performance plastics, Tool steel
- Certificates
- DIN EN ISO 9001:2015, IATF 16949:2016, DIN EN ISO 50001:2018, DIN EN ISO 14001:2015, TISAX, Ecovadis CSR Silver, ISO 9001, IATF 16949, ISO 14001, ISO 50001
- Founded
- 1965
- Industries
- Automotive manufacturers and suppliers, Medical technology, Industry
- 01
Tool design CAD/CAM
- 02
Injection mold making
- 03
Sampling and first-article inspection
- 04
Injection molding production in 3-shift operation
- 05
Production-accompanying quality inspection
- 06
Assembly into assemblies
- 07
Warehouse and picking
- 08
Shipping
Materials and processes
Thermoplastics
Processing of technical injection-molded parts from all common thermoplastics.
TPE (thermoplastic elastomers)
For soft components and 2K bonds.
High-performance plastics
Injection molding machines are designed for processing technical and high-performance plastics.
Tool steel
Cavities and standard mold components made in the in-house toolmaking shop.
Sites

Plant 1 – Seemeweg 9
DEInjection molding production, warehouse, office/administration
- Materials
- Thermoplastics, TPE, high-performance plastics
- 19 Arburg injection molding machines 600–2,000 kN
- Cleanroom clean air class ISO 7
- Temperature control units
- Supplementary granulators
- Sprue pickers/handling
- Host computer system

Plant 2 – Weinstraße 3
DEToolmaking (Lohmann Werkzeug GmbH)
- Part weight / size
- up to 1,000 kg tool assembly
- Materials
- Tool steel
- Milling and HSC milling machines
- Sinker and wire EDM machines
- Start-hole drilling and drilling machines
- Lathe
- Surface grinding machine
- CAD/CAM workstations
Components


Inside the production






Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Injection molding of technical parts made of thermoplastics and TPE (thermoplastic elastomers), 2KPlastics | – | – | – | – | Thermoplastics, TPE (thermoplastic elastomers), High-performance plastics |
| Injection mold making (prototype, multi-cavity and family molds), tool design CAD/CAM,Toolmaking | high demands on part tolerances | – | 1,000 kg (tool assembly) | – | Steel (cavities, standard mold components) |
| Milling, HSC milling, sinker EDM, wire EDM, start-hole drilling, drilling, turning,Machining | – | 500 mm (travel range cavities) × 300 mm (travel range cavities) | – | – | Tool steel |
| Maintenance, repair and overhaul of injection molds (own and external)Toolmaking | – | – | – | – | – |
| Assembly of assemblies (purchased parts + injection-molded parts)Assembly | – | – | – | – | Thermoplastics |
10 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Injection molding machine | Arburg | 19 | Clamping force 600 kN (60 to) to 2,000 kN (200 to) | – | Sinntal-Sterbfritz (Plant 1) |
| Milling machine | – | – | Travel ranges up to 300 mm x 500 mm (cavities) | – | Sinntal-Sterbfritz (Plant 2) |
| HSC milling machine | – | – | – | – | Sinntal-Sterbfritz (Plant 2) |
| Sinker EDM machine | – | – | – | – | Sinntal-Sterbfritz (Plant 2) |
| Wire EDM machine | – | – | – | – | Sinntal-Sterbfritz (Plant 2) |
| Start-hole drilling machine | – | – | – | – | Sinntal-Sterbfritz (Plant 2) |
| Drilling machine | – | – | – | – | Sinntal-Sterbfritz (Plant 2) |
| Lathe | – | – | – | – | Sinntal-Sterbfritz (Plant 2) |
| Surface grinding machine | – | – | – | – | Sinntal-Sterbfritz (Plant 2) |
| Injection molding machine with cleanroom clean air class ISO 7 | – | – | – | 2021 | Sinntal-Sterbfritz |
Additional services
Reference customers
Quality and certification
Project and quality management accompany measurement, first-article sampling and production-accompanying inspection with optical 2D and 3D metrology as well as a CAQ system; quality is certified to ISO 9001 and IATF 16949.
| Evidence | Sinntal-Sterbfritz (Plant 1) | Sinntal-Sterbfritz (Plant 2) |
|---|---|---|
| ISO 9001 | ||
| IATF 16949 | ||
| ISO 14001 | ||
| ISO 50001 | ||
| TISAX |
History
- 1910
Construction of a steam sawmill at the present Weinstraße site.
- 1958
Closure of the sawmill, focus on joinery and window construction.
- 1961
Renamed Konrad Lohmann & Sohn, start of industrial wood processing.
- 1965
First injection molding machine at the Seemeweg site (Plant 1).
- 1985
Renamed Lohmann Kunststoffverarbeitung GmbH, focus on plastics processing.
- 1998
Renamed Lohmann Kunststoff GmbH, management taken over by Klaus Lohmann.
- 2002
Initial certification of the quality management system to DIN EN ISO 9001.
- 2011
New construction of the warehouse at Plant 2.
- 2013
New construction of the injection molding shop at Plant 1.
- 2014
ERP system with radio-based logistics, ISO 50001 certification, 2nd place Supplier of the Year of Faurecia Exteriors GmbH.
- 2015
50 years of injection molding; founding of Lohmann Werkzeug GmbH and relocation of toolmaking to Plant 2.
- 2019
New construction of the office and logistics building at Plant 1.
- 2021
First machine with a cleanroom of clean air class ISO 7 for medical technology; Ecovadis Silver.
- 2022
Switch to 100% green electricity; IATF 16949 certification by DEKRA.
- 2023
Environmental management certification DIN EN ISO 14001:2015 by SKZ.
- 2025
TISAX participation as well as new certifications ISO 9001, IATF 16949, ISO 50001 and ISO 14001.