Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Steurer Ropeways – Fertigung

Planning, design, assembly and service of ropeways and special-purpose systems in mechanical engineering

Steurer Ropeways Logo

Ludwig Steurer Maschinen und Seilbahnbau GmbH & Co KG

A-6933 Doren, Vorarlberg (headquarters, engineering, manufacturing, assembly)New on Amplifa

11–50Employees
Doren (AT)Location

About Ludwig Steurer Maschinen und Seilbahnbau

Ludwig Steurer Maschinen und Seilbahnbau GmbH & CoKG, based in Doren, Vorarlberg, specialises in the construction of ropeways and special-purpose systems. Its portfolio of services covers the project planning and design of ropeways and special-purpose systems, the preparation of standards-compliant and production-ready detail drawings and bills of materials, technical calculations and verifications, as well as mechanical initial assembly and commissioning through to handover to the customer. In addition, the company carries out conversions, repairs, maintenance and service work on existing installations. Completed projects include, among others, the Funicular da Graça funicular railway in Lisbon for the local transport network operator ENEL, an Inlined Lift (TOP LINER) between Ehrenburg and Schlosskopf Fortress, and a material ropeway for limestone extraction in Switzerland with a 25 t single load and a transport capacity of approx. 200 t/h. Its customers come from ropeway technology, public transport, mining and tourism. The company employs 11–50 staff and is primarily active in the German-speaking region as well as in Switzerland and Portugal.

Site
Doren
Processes
Ropeway construction (gondolas, chairlifts, material ropeways, funicular railways), Mechanical engineering / special-purpose systems (project planning and design of ropeways and, Mechanical initial assembly and commissioning of ropeways and special-purpose systems, Conversions, repairs, maintenance and service work on existing installations, Ropeway construction, Mechanical engineering, Special-purpose systems, Design/Engineering
Materials
Engineering/Design, Assembly/Commissioning, Conversion/Service
Employees
11–50
Industries
Ropeway technology, Public transport, Mining/Material transport, Mechanical engineering, Tourism/Cable cars
  1. 01

    Engineering/Project Planning

  2. 02

    Design

  3. 03

    Mechanical Initial Assembly

  4. 04

    Commissioning

  5. 05

    Service and Maintenance

Processes and Services

ENG

Engineering/Design

Project planning and design of ropeways and special-purpose systems including calculations and documentation.

MONT

Assembly/Commissioning

Mechanical initial assembly and commissioning of ropeways and special-purpose systems through to customer handover.

SERV

Conversion/Service

Conversions, repairs, maintenance and service work on existing installations.

Locations

Standort Doren

Doren

AT

Headquarters, engineering, manufacturing, assembly

Materials
Steel structures (ropeway technology)
  • CAD (Autodesk Inventor/AutoCAD)

Components and Systems

Funicular da Graça funicular railway, Lisbon
Funicular da Graça funicular railway, LisbonRopeway construction · Public transport
Inlined Lift TOP LINER Ehrenburg–Schlosskopf
Inlined Lift TOP LINER Ehrenburg–SchlosskopfRopeway construction · Tourism/cable cars
Material ropeway for limestone extraction, Switzerland
Material ropeway for limestone extraction, SwitzerlandMaterial ropeway · Mining

Inside the production

Steurer Ropeways
Steurer Ropeways

Industries

Ropeway technologyPublic transportMining/Material transportMechanical engineeringTourism/Cable cars

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Ropeway construction (gondolas, chairlifts, material ropeways, funicular railways)Assembly–––––
Mechanical engineering / special-purpose systems (project planning and design of ropeways andEngineering–––––
Mechanical initial assembly and commissioning of ropeways and special-purpose systemsAssembly–––––
Conversions, repairs, maintenance and service work on existing installationsAssembly–––––

Additional services

Ropeway constructionMechanical engineeringSpecial-purpose systemsDesign/EngineeringMechanical initial assembly and commissioningConversions, repairs, maintenance and serviceTechnical calculations and documentation

Reference customers

Local transport network operator ENEL (Lisbon, Funicular da Graça)Limestone mining in Switzerland (material ropeway, 25 t single load, approx. 200 t/h)

History

  1. Opening of the Funicular da Graça funicular railway in Lisbon on 12 March, operator ENEL

  2. Inlined Lift (TOP LINER) Ehrenburg – Schlosskopf commissioned

  3. New material ropeway for limestone extraction in Switzerland (25 t single load, approx. 200 t/h)

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account