Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Lückmann Anlagenbau – Fertigung

Plant engineering for water supply, wastewater treatment and flood protection: pumps, pipework and switchgear from a single source.

Lückmann Anlagenbau Logo

Lückmann Pumpen-Center GmbH

Wallenhorst (Marie-Curie-Str. 3) · Wallenhorst (Otto-Lilienthal-Str. 12)New on Amplifa

1987Founded
30Employees
6.000 l/sMax. dewatering capacity
1.250 kWMax. switchgear power
DN 2000Max. valve nominal size

About Lückmann Anlagenbau

Lückmann Pumpen-Center GmbH is a family-owned company founded in 1987 and based in Wallenhorst near Osnabrück. It plans, manufactures, installs and maintains systems for water supply, wastewater treatment and flood protection. The service portfolio includes dewatering and temporary pump installations up to 6,000 l/s, pumps for wastewater, clean water and flood water (drainage pumping station pumps up to 3,000 l/s per pump), switchgear up to 1,250 kW, valves up to DN 2000, as well as automation, remote control and measurement technology. From its own workshop, the company prefabricates and welds pipework systems in steel, stainless steel and PE HD up to DN 1400, builds control cabinets, and carries out commissioning, maintenance and service with on-call duty and emergency power supply. Its customers include municipalities, wastewater treatment plant operators, the public sector and industry, in part acting as a subcontractor to construction companies. With around 30 employees, its own production hall and electrical department, the company is one of the established plant builders in northern Germany.

Site
Wallenhorst
Processes
Dewatering / temporary pump installations (rental systems, supply, installation, dismantling), Pump construction (wastewater, clean water, flood water; drainage pumping station pumps 3000 l/s, Switchgear construction (planning, design, manufacturing, commissioning, maintenance), Pipework construction / prefabrication and installation of pipework systems, Valve supply and installation (gate valves, flaps, valves, pressure vessels), Automation and remote control technology (PLC Siemens S7, EATON, Schraml, WAGO), Measurement technology (level, flow, process monitoring, analysis technology), Maintenance and service of pumps, valves and E&I technology
Materials
Stainless steel pipework, Steel pipework, PE HD, Rubber expansion joint, GRP cabinet, Steel pipe, Stainless steel, Copper
Certificates
ISO 9001
Founded
1987
Employees
30
Industries
Water management / wastewater treatment, Water supply, Flood protection, Municipal wastewater treatment plants, Industry, Public sector
  1. 01

    Planning and design (CAD, Tree-Soft, WS-Cad, E-plan)

  2. 02

    Pipe prefabrication and welding

  3. 03

    Control cabinet and switchgear construction

  4. 04

    Pump and system installation

  5. 05

    Commissioning, measurement technology and PLC programming

  6. 06

    Maintenance, service, on-call duty

Materials and Processes

St

Steel pipe

For pipework up to DN 1400 in pumping stations and dewatering systems, manufactured and installed.

EdS

Stainless steel

For pipework, railings, ladders and measurement technology components in wastewater treatment plants and pumping stations.

PE HD

PE HD

Plastic pipe system for temporary dewatering installations and connection lines.

Ku

Copper

Cabling and wiring in switchgear and E&I technology.

KuK

Plastic (GRP)

Heated GRP cabinets for outdoor installation in pumping station equipment.

Sch

Welding (steel/stainless steel)

Manufacture of pipework, frames and fastening structures to drawing, including certified welding supervision.

SPS

PLC / remote control technology

Automation with Siemens S7, EATON, Schraml and WAGO from concept to commissioning.

MST

Measurement technology

Level, flow, process monitoring and analysis technology for water management and industry.

Locations

Wallenhorst, Marie-Curie-Str. 3

DE

Headquarters, production halls, electrical department, switchgear construction, warehouse

Materials
Steel, stainless steel, copper
  • Production halls for pre-assembly of pumps and switchgear
  • Electrical workshop / control cabinet construction
  • Design software Tree-Soft, WS-Cad, E-plan
  • Warehouse and spare parts stock

Wallenhorst, Marie-Curie-Str. 13

DE

Workshop hall for temporary pump installations

Materials
Steel, PE HD
  • Hall for assembly and provision of temporary pump installations

Wallenhorst, Otto-Lilienthal-Str. 12

DE

Service workshop and service office

  • Service workshop for pumps, valves and E&I technology

Components and Systems

Pipework system
Pipework systemPrefabrication and installation · pumping stations
Switchgear
SwitchgearControl cabinet construction · water management

Inside the production

Steertlochsiel drainage pumping station project
Steertlochsiel drainage pumping station project
Dewatering plant engineering
Dewatering plant engineering
Pump and piping system
Pump and piping system
Drainage pumping station technology
Drainage pumping station technology
On-site installation
On-site installation
Pipework construction
Pipework construction
Pumping station
Pumping station
Site setup
Site setup
Plant technology
Plant technology
Founded 1987
Founded 1987
New building 1993
New building 1993
Hall extension 1998
Hall extension 1998

Industries

Water management / wastewater treatmentWater supplyFlood protectionMunicipal wastewater treatment plantsIndustryPublic sector

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Dewatering / temporary pump installations (rental systems, supply, installation, dismantling)Engineering–6000 l/s––Steel pipe, Stainless steel pipe, PE HD
Pump construction (wastewater, clean water, flood water; drainage pumping station pumps 3000 l/sEngineering–3000 l/s per pump––Steel pipe, Stainless steel pipe
Switchgear construction (planning, design, manufacturing, commissioning, maintenance)Engineering––––Copper, Plastic
Pipework construction / prefabrication and installation of pipework systemsJoining–DN 1400––Steel pipe, Stainless steel pipe, PE HD
Valve supply and installation (gate valves, flaps, valves, pressure vessels)Assembly–up to DN 2000––Steel, Stainless steel
Automation and remote control technology (PLC Siemens S7, EATON, Schraml, WAGO)Engineering––––Copper, Plastic
Measurement technology (level, flow, process monitoring, analysis technology)Testing––––Stainless steel
Maintenance and service of pumps, valves and E&I technologyEngineering––––Steel, Stainless steel, Copper
Welding (pipework, frames, fastening structures)Joining––––Steel, Stainless steel

5 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Switchgear manufacturing (in-house)––up to 1250 kW–Wallenhorst, Marie-Curie-Straße 3
Workshop hall for temporary pump installations––––Wallenhorst, Marie-Curie-Str. 13 (since 2013)
Electrical workshop / control cabinet construction––––Wallenhorst, Marie-Curie-Str. 3 (since 1998/2002)
Service workshop––––Wallenhorst, Otto-Lilienthal-Str. 12 (since 2007)
Switchgear design softwareTree-Soft, WS-Cad, E-plan–––Wallenhorst

Additional services

Dewatering / temporary pump installations (up to 6,000 l/s)Automation and remote control technologyMeasurement technologyPump supply (wastewater, clean water, flood water)Switchgear construction (up to 1,250 kW)Valve supply and installationMaintenance and servicePipework construction and installationOn-call duty, fault reporting and emergency power supplyPlanning, design, commissioning

Reference customers

LINEG RheinkampStEB KölnCity of BonnCity of Herne (A42 Wanne polder)medl GmbH MülheimEiffage (formerly Wittfeld)Schachtbau NordhausenGKW Auenheim BergheimMunicipal wastewater disposal utility of the town of AchimCity of BocholtNortrup wastewater treatment plant (Bersenbrück)KemperCity of BeverungenCity of VechtaCity of Aurich

Quality

Quality is ensured by a well-coordinated team of certified welders, mechatronics technicians, electricians and service technicians, as well as manufacturing with components from renowned system partners. Acceptance testing is carried out, among others, in accordance with VOB as well as TÜV, with inspections per DIN VDE 0100-600 and DIN EN 60079-17 in Ex areas.

EvidenceWallenhorst, Marie-Curie-Str. 3
ISO 9001

History

  1. 1987

    Founding of A. Lückmann as a garage-based business

  2. 1993

    New construction of an office and assembly hall in the Wallenhorst/Hollage industrial estate, Marie-Curie-Str. 3

  3. 1998

    Hall extension at Marie-Curie-Str. 3, electrical workshop and warehouse hall

  4. 2002

    Extension of Marie-Curie-Str. 3, office building and new production rooms for control cabinet construction

  5. 2007

    Acquisition of new premises at Otto-Lilienthal-Str. 12 for the service workshop and service office

  6. 2012

    25th company anniversary

  7. 2013

    New construction of the hall for temporary pump installations at Marie-Curie-Str. 13

  8. 2024

    Company profile: leading plant builder in northern Germany

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo