Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
M-TEG – Fertigung

Electrical installations and building technology: high- and low-voltage systems, bus systems and electrical planning from Upper Austria

M-TEG Logo

M-TEG Montage Team Elektrotechnik GmbH

Marchtrenk (Headquarters) · TimelkamNew on Amplifa

2006Founded
30-35Employees incl. apprenticeship training
2Locations in Upper Austria
2,1 Mio. € (2021)Annual revenue
Upper Austria, Austria, GermanyOperating area

About M-TEG

M-TEG Montage Team Elektrotechnik GmbH was founded in 2006 and is a service provider based in Upper Austria specializing in electrical installations and modern building technology. Its range of services covers electrical planning from design planning to as-built documentation, high-voltage (power) installations from the low-voltage main distribution board to the socket, low-voltage (extra-low-voltage) installations and bus systems. Projects are realized in new construction, conversion, extension and renovation, from execution planning through on-site implementation to commissioning. With 30 to 35 employees including apprenticeship training, the company focuses on educational institutions, office buildings and public buildings in Upper Austria, Austria and Germany. Clients include, among others, the Bundes Immobilien Gesellschaft, the city administrations of Vienna, Wels and Salzburg as well as Immobilien Linz. Annual revenue in 2021 was around 2.1 million euros.

Site
Marchtrenk
Processes
Electrical installation and building technology, High-voltage installation (low-voltage main distribution board to socket), Low-voltage installation, Electrical planning (design planning to as-built documentation), Bus systems (installation), Execution planning, on-site implementation, commissioning, Electrical planning, High-voltage (power) systems
Materials
High-voltage (power) systems, Low-voltage (extra-low-voltage) systems, Bus systems, Electrical planning
Founded
2006
Employees
30-35
Industries
Educational institutions/school construction, Office buildings, Building technology, Public buildings
  1. 01

    Electrical planning (design planning to as-built documentation)

  2. 02

    Execution planning

  3. 03

    Installation on the construction site

  4. 04

    Commissioning

  5. 05

    As-built documentation

Service Areas and Processes

STA

High-voltage (power) systems

Installation from the low-voltage main distribution board to the socket in new construction, conversion and renovation.

SCHW

Low-voltage (extra-low-voltage) systems

Planning and design as well as installation of low-voltage systems for buildings.

BUS

Bus systems

Installation of bus systems for modern building technology.

EP

Electrical planning

Consulting and planning from design planning to as-built documentation.

Locations

Standort Marchtrenk

Marchtrenk

AT

Headquarters

Materials
High voltage, low voltage, bus systems

Timelkam

AT

Location

Materials
High voltage, low voltage, bus systems

Services and Projects

School Campus Vöcklabruck
School Campus VöcklabruckHigh and low voltage · Educational institution
Josef Eckerstorfer, Management
Josef Eckerstorfer, ManagementManagement · M-TEG
Ing. Reinhard Rieger, Management
Ing. Reinhard Rieger, ManagementManagement · M-TEG

Inside the production

School Campus Vöcklabruck, new construction 2019-2021 (€1,215,000)
School Campus Vöcklabruck, new construction 2019-2021 (€1,215,000)

Industries

Educational institutions/school constructionOffice buildingsBuilding technologyPublic buildings

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Electrical installation and building technologyInstallation–––––
High-voltage installation (low-voltage main distribution board to socket)Installation–––––
Low-voltage installationInstallation–––––
Electrical planning (design planning to as-built documentation)Engineering–––––
Bus systems (installation)Installation–––––
Execution planning, on-site implementation, commissioningInstallation–––––

Additional services

Electrical planningHigh-voltage (power) systemsLow-voltage (extra-low-voltage) systemsBus systemsPlanning and consultingAs-built documentationCommissioningExecution planningInstallationApprenticeship training

Reference customers

Bundes Immobilien GesellschaftMunicipality of VöcklabruckCity Administration of WelsLAWOGProvincial School Board for Upper AustriaCity Administration of ViennaCity Administration of SalzburgProvincial Government of Upper AustriaImmobilien Linz GmbH & Co KGvia donau – Österreichische Wasserstraßen GmbHAllgemeine Sparkasse OÖ LinzEBG GmbH & Co KGMarket Municipality of Schörfling am Attersee

History

  1. 2006

    Foundation of M-TEG Montage Team Elektrotechnik GmbH

  2. 2019

    Start of construction of the new School Campus Vöcklabruck for the municipality of Vöcklabruck (€1,215,000), completed in 2021

  3. 2021

    Renovation and conversion projects including Schauer Gymnasium Wels, Volksschule St. Florian and Körnergymnasium Linz

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo