Family-owned master company for heating, plumbing, air conditioning and bathroom renovation in Hackenheim
Mathias Jakob Wärme- und Haustechnik GmbH & Co. KG
Hackenheim · VolxheimNew on Amplifa
About us
Mathias Jakob Wärme- und Haustechnik GmbH & Co. KG is a family-owned and master-certified company from Hackenheim near Bad Kreuznach that has been active in the building services (SHK) and building technology sector since 1998. Its range of services covers bathroom renovation and barrier-free bathroom modernisation, heating modernisation (gas, LPG, oil, heat pumps, solar thermal, biomass, hybrid heating), heat distribution via radiators and surface heating systems, and plumbing installation including drinking water hygiene and water treatment. In addition, the company offers residential ventilation, room air conditioning, photovoltaics, smart home, energy consulting and emergency service. Customers are commercial and private clients in Hackenheim, Bad Kreuznach and the surrounding area. The team consists of qualified installation technicians, service technicians, apprentices and administrative staff; external trades such as electrical or tiling are coordinated through commissioned master companies.
- Site
- Hackenheim
- Processes
- Bathroom renovation / bathroom modernisation, Barrier-free bathroom (planning and conversion), Seamless bathroom (plaster, PVC, porcelain stoneware, laminate installation), Lighting technology / electrical installation in the bathroom, Heating modernisation, Gas heating / gas condensing boiler installation, LPG heating installation, Oil and gas heating (repair, modernisation, new installation)
- Materials
- Copper pipe, Plastic pipe, Porcelain stoneware, PVC, Plaster, Wood flooring / laminate (wet areas), Wood pellets, Liquefied gas (LPG)
- Certificates
- ISO 9001
- Founded
- 1998
- Industries
- SHK / building technology, Commercial customers, Private customers / residential construction
- 01
Consulting and energy consulting
- 02
Planning (including 3D bathroom planning)
- 03
Quotation and subsidy consulting
- 04
Installation and assembly
- 05
Coordination of external trades
- 06
Maintenance, service and emergency service
Materials and Materials
Copper pipe
Material for plumbing and drinking water installations from the house connection to the wastewater side.
Plastic pipe
Material for plumbing and drinking water lines.
PVC
Surface material for seamless bathroom surfaces during bathroom modernisation.
Porcelain stoneware
Surface material for seamless bathroom modernisations.
Plaster
Surface material for seamless bathroom walls.
Wood flooring / wet-area laminate
Floor coverings for wet areas during bathroom modernisation.
Wood pellets
Fuel for pellet heating systems and biomass systems.
Liquefied gas (LPG)
Fuel for LPG heating systems without a gas connection.
Locations
Hackenheim
DEHead office / operating facility
Volxheim
DEOperating facility in the industrial park since 2018 (Im Veltensgarten 1)
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Bathroom renovation / bathroom modernisationInstallation | – | – | – | – | – |
| Barrier-free bathroom (planning and conversion)Installation | – | – | – | – | – |
| Seamless bathroom (plaster, PVC, porcelain stoneware, laminate installation)Installation | – | – | – | – | Putz, PVC, Feinsteinzeug, Holzböden, Laminat |
| Lighting technology / electrical installation in the bathroomInstallation | – | – | – | – | – |
| Heating modernisationInstallation | – | – | – | – | – |
| Gas heating / gas condensing boiler installationInstallation | – | – | – | – | – |
| LPG heating installationInstallation | – | – | – | – | – |
| Oil and gas heating (repair, modernisation, new installation)Installation | – | – | – | – | – |
| Heat pump installation (air/water, brine/water)Installation | – | – | – | – | – |
| Solar thermal installationInstallation | – | – | – | – | – |
| Heating with wood / pellet heating / biomassInstallation | – | – | – | – | – |
| Photovoltaic installation (incl. battery storage)Installation | – | – | – | – | – |
| Hybrid heating installationInstallation | – | – | – | – | – |
| Radiator installation (convectors, panel, tubular and sectional radiators)Installation | – | – | – | – | – |
| Floor and wall heating (surface heating)Installation | – | – | – | – | – |
| Plumbing installation (house connection to wastewater)Installation | – | – | – | – | Kupferrohr, Kunststoffrohr |
| Drinking water filters / softening / descalingInstallation | – | – | – | – | – |
| Rainwater and greywater utilisationInstallation | – | – | – | – | – |
| Legionella prevention / drinking water hygieneInspection | – | – | – | – | – |
| Heating check and hydraulic balancingInspection | – | – | – | – | – |
| Gas safety check (home inspection, leak testing)Inspection | – | – | – | – | – |
| Heating maintenance and customer serviceInstallation | – | – | – | – | – |
| Energy consulting / energy performance certificate / renovation roadmapEngineering | – | – | – | – | – |
| Central residential ventilation with heat recoveryInstallation | – | – | – | – | – |
| Decentralised residential ventilation with heat recoveryInstallation | – | – | – | – | – |
| Room air conditioning / split air conditioning unitsInstallation | – | – | – | – | – |
| Smart home installationInstallation | – | – | – | – | – |
| Central vacuum system installationInstallation | – | – | – | – | – |
| Emergency service (water leakage, burst pipe)Installation | – | – | – | – | – |
| 3D bathroom planningEngineering | – | – | – | – | – |
Additional services
Reference customers
Quality
As a master-certified company, the company carries out maintenance and inspections such as heating check, gas safety check with leak testing, home inspection and drinking water hygiene measures. No information on certified management systems is available.
| Evidence | Hackenheim |
|---|---|
| ISO 9001 |
History
- 1998
Company founded as a specialist firm for building services engineering in Hackenheim.
- 2011
Dag Jakob and Bianca Jakob join the company in supporting roles.
- 2018
Relocation from the old farmstead in Hackenheim to the Volxheim industrial park, Im Veltensgarten 1.