
MEVA develops and manufactures formwork systems for wall, slab and large-area formwork in concrete construction.
MEVA Schalungs-Systeme GmbH
Haiterbach (Headquarters, Plants I–IV) · Hannover · Stuttgart · BerlinNew on Amplifa
About MEVA
MEVA Schalungs-Systeme GmbH was founded in 1970 in Haiterbach in the Black Forest and is an independent, family-owned company for formwork technology. The company manufactures modular panel formwork systems, aluminium hand-set formwork, large-area formwork such as Mammut, and slab formwork such as MevaDec, supplemented by customised special constructions. The systems are manufactured at the company's own production site in Haiterbach (Plant I) from aluminium and steel; since 2000 the wood-free alkus all-plastic formwork sheet has been used as the formwork skin. Plant II handles cleaning and refurbishment of used formwork, Plant III special constructions, and Plant IV the storage of used formwork. In addition to production, MEVA offers rental, formwork design and training. With annual revenue of over €130 million and more than 40 locations worldwide, MEVA supplies the construction industry and concrete construction.
- Site
- Haiterbach
- Processes
- Formwork systems - development, production, custom-build formwork, Cleaning and refurbishment of formwork, Formwork systems development, Cleaning and refurbishment (Plant II), Custom-build formwork (Plant III), Storage of used formwork (Plant IV), Formwork design training, Rental of formwork
- Materials
- Aluminium, alkus all-plastic sheet (100% wood-free formwork skin), Steel, alkus all-plastic sheet
- Certificates
- ISO 9001
- Founded
- 1970
- Industries
- Construction industry, Formwork technology, Concrete construction, Construction industry / Formwork technology / Concrete construction
- 01
Product development and engineering
- 02
Manufacturing in Haiterbach (Plant I)
- 03
Custom-build special formwork (Plant III)
- 04
Cleaning and refurbishment (Plant II)
- 05
Storage of used formwork (Plant IV)
- 06
Rental, sales and training
Materials and Processes
Aluminium
Material for hand-set formwork systems, universally usable as wall and slab formwork.
Steel
Load-bearing and frame components of the panel and large-area formwork systems.
alkus all-plastic sheet
100 % wood-free all-plastic formwork skin, in use since 2000.
Locations

Haiterbach
DEHeadquarters: Plant I production, Plant II cleaning and refurbishment, Plant III special constructions, Plant IV used
- Materials
- Aluminium, steel, alkus plastic sheets

Hannover
DEFormwork Center (founded 1987)

Stuttgart
DEBranch office (founded 1990)

Berlin
DEFormwork Center (founded 1991)
Formwork Systems





Inside the production





Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Formwork systems - development, production, custom-build formworkEngineering | – | – | – | – | Aluminium, alkus all-plastic sheets |
| Cleaning and refurbishment of formworkSurface | – | – | – | – | – |
Additional services
Quality
MEVA places emphasis on quality, high safety standards and a high level of service; regular refurbishment of the formwork in Plant II ensures the quality of used equipment. Certifications are not documented.
| Evidence | Haiterbach |
|---|---|
| ISO 9001 |
History
- 1970
Founding of MEVA Schalungs-Systeme GmbH on 6 February 1970 in Haiterbach (name as an acronym for “Metallverarbeitung” / metalworking); Haiterbach headquarters opened
- 1970
First modular panel formwork system for crane-independent use presented
- 1971
Panel formwork system shown at bauma 1971 – first modular panel formwork system usable without a crane
- 1977
Inventions: assembly lock and closed hollow profile – worldwide standard
- 1981
Aluminium formwork as the first hand-set formwork, universally usable as wall and slab formwork
- 1982
Mammut: first large industrial formwork with a permissible fresh concrete pressure of 97 kN/m²
- 1987
Founding of Formwork Center Hannover
- 1990
Branch office Netherlands (Gouda, since 2016 MEVA BeNeLux); Plant II in Haiterbach for cleaning and refurbishment (rental trend); branch office Austria (Pfaffstätten); Stuttgart office
- 1991
Opening of Formwork Center Berlin
- 1992
MevaDec: first slab formwork with three methods in one system
- 1993
Branch office Hungary (Budapest)
- 1995
Branch office Switzerland (Seon)
- 2000
alkus: first 100% wood-free all-plastic facing layer; branch office USA (Springfield)
- 2003
Branch office France (Sarre Union/Sarregeuemines); Mammut 350 with 100 kN/m² fresh concrete pressure
- 2006
Branch office UK (Tamworth); MEVA KHK, Dubai (UAE); StarTec-Securit foldable pre-assembled safety system
- 2008
MevaDec used in the construction of the Burj Khalifa (tallest building in the world)