Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
MOVE ON Energy – Fertigung

MOVE ON Energy plans, builds and operates large-scale ground-mounted solar power plants – from project development to operations management.

MOVE ON Energy Logo

MOVE ON Energy GmbH

Neukieritzsch (Lobstädt)New on Amplifa

GmbHLegal form (HRB 38478, Leipzig Local Court)
650 MWInstalled capacity Witznitz Energy Park
605 MWOn grid since 25.03.2024
Neukieritzsch (Lobstädt)Headquarters

About MOVE ON Energy

MOVE ON Energy is a project developer and operator of solar power plants based in Neukieritzsch (Lobstädt) in the Leipzig district. The company develops, implements and operates holistically conceived ground-mounted photovoltaic systems and provides all services from a single source: site acquisition and land securing, permitting procedures, construction management and construction logistics, as well as technical and commercial operations management including maintenance, inspection and accounting after commissioning. Implementation takes regional conditions into account and involves local companies in order to increase value creation in the site region. The best-known project is the Witznitz Energy Park with an installed capacity of 650 megawatts, which according to company statements is the largest non-subsidised solar park in Europe and has been feeding 605 megawatts into the 50Hertz transmission grid since 25 March 2024. With this project, the former lignite mining region in the Leipzig district has been sustainably upgraded. The company sees itself as a partner for the energy future and combines solar energy generation with climate protection.

Site
Neukieritzsch (Lobstädt)
Processes
Planning, construction and operation of solar power plants / solar energy generation, Planning and construction of solar power plants, Project development and site acquisition, Permitting procedures, Construction management, Technical and commercial operations management, Maintenance and inspection, Accounting
Materials
Project development and site acquisition, Permitting procedures, Construction management and construction logistics, Technical and commercial operations management
Industries
Renewable energies, Photovoltaics / solar park project development, Photovoltaics/solar park project development
  1. 01

    Site acquisition / project development

  2. 02

    Permitting procedures

  3. 03

    Solar power plant planning

  4. 04

    Construction management and construction logistics

  5. 05

    Commissioning

  6. 06

    Technical and commercial operations management, maintenance and inspection

Services and Project Phases

ENG

Project development and site acquisition

Acquisition of suitable open spaces and development of tailored energy concepts involving landowners, municipalities and local residents.

GEN

Permitting procedures

Management of the complex permitting procedures for ground-mounted photovoltaic systems.

BAU

Construction management and construction logistics

Professional construction logistics and construction management taking account of logistical conditions and creation of the necessary infrastructure.

BF

Technical and commercial operations management

Maintenance, inspection and accounting after commissioning from a single source.

Site

Standort Neukieritzsch (Lobstädt)

Neukieritzsch (Lobstädt)

DE

Headquarters

Projects

Witznitz Energy Park
Witznitz Energy ParkGround-mounted photovoltaics · Renewable energies
Solar power plant
Solar power plantProject development and operation · Photovoltaics
Technical implementation and operation
Technical implementation and operationOperations management · Photovoltaics

Inside the production

Goals and visions
Goals and visions
Project impression
Project impression
Girls' Day at the Witznitz Energy Park
Girls' Day at the Witznitz Energy Park
Team MOVE ON Energy
Team MOVE ON Energy

Industries

Renewable energiesPhotovoltaics / solar park project developmentPhotovoltaics/solar park project development

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Planning, construction and operation of solar power plants / solar energy generationEngineering–––––

Additional services

Planning and construction of solar power plantsProject development and site acquisitionPermitting proceduresConstruction managementTechnical and commercial operations managementMaintenance and inspectionAccountingConstruction logistics

Reference customers

50Hertz (transmission system operator, mentioned in the context of the Witznitz Energy Park)HANS (project partner in the context of the Witznitz Energy Park)

History

  1. 2024

    Since 25 March 2024, the Witznitz Energy Park has been feeding 605 MW of renewable energy into the 50Hertz transmission grid; the planned or installed capacity is 650 MW.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.