Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Müller + Weber – Fertigung

Automation technology from Braunschweig: PLC programming, control cabinet construction, electrical design, retrofit and DGUV V3 inspection.

Müller + Weber Logo

Müller + Weber GbR

Braunschweig (Gablonzstraße 9) · Braunschweig (Böttgerstraße 2)New on Amplifa

01.02.2016Foundation of Müller + Weber GbR
1994
2–10Employees
BraunschweigLocation (Lower Saxony)

About Müller + Weber GbR

Müller + Weber GbR is an automation company from Braunschweig that has been active in the market since 01 February 2016 as the successor to Mike Weber Industrieelektrotechnik, founded in 1994. Its range of services covers project planning, PLC programming (Siemens TIA Portal, Step7 Classic, Beckhoff TwinCAT 3), robotics, electrical design with EPlan P8 and Fluid Plan, control cabinet construction, system wiring, simulation with digital twin, commissioning, DGUV V3 inspection and retrofit of legacy controls, such as converting S5 to S7-1500. In addition, the company offers frequency converter solutions, energy distribution and management, SISTEMA assessments for performance level, as well as maintenance and servicing of control cabinets. Customers come from industries such as automotive, food technology, locking and packaging technology, the confectionery industry, mechanical engineering, plant engineering, building automation, production and logistics. The company realizes complete automation projects from a single source, from planning through design and manufacturing to commissioning and testing.

Site
Braunschweig
Processes
Project planning, PLC programming (Siemens TIA Portal, Siemens Step7 Classic, Beckhoff TwinCat3), Robotics – consulting and programming of new and existing robots, Electrical design with EPlan P8, Control cabinet construction – planning, design, manufacturing, assembly, energy distribution,, System wiring, Simulation – digital twin, Commissioning and acceptance of PLC controls
Materials
Siemens TIA Portal, Siemens Step7 Classic, Beckhoff TwinCAT 3, EPlan P8 / Fluid Plan, Siemens WinCC flexible, Bosch OpCon Control Plus, Sistema / Performance Level
Certificates
DIN EN standards (control cabinets), Documentation and test certificates, DGUV V3 inspection, ISO 9001
Founded
2016
Employees
2-10
Industries
Automotive, Food technology, Locking and packaging technology, Confectionery industry, Mechanical engineering, Plant engineering
  1. 01

    Project planning

  2. 02

    Electrical design (EPlan P8, Fluid Plan)

  3. 03

    Control cabinet construction (design, manufacturing, assembly)

  4. 04

    PLC programming

  5. 05

    Simulation – digital twin

  6. 06

    Commissioning and acceptance

  7. 07

    DGUV V3 inspection

  8. 08

    Maintenance and servicing

Systems, tools and processes

TIA

Siemens TIA Portal

PLC programming for automation systems and production lines.

S7

Siemens Step7 Classic

Programming and retrofit of classic PLC controls, including migration from S5 to S7-1500.

TwinCAT

Beckhoff TwinCAT 3

Soft PLC programming for PC-based control architectures.

EPLAN

EPlan P8 / Fluid Plan

Electrical and fluid engineering design of industrial systems.

WinCC

Siemens WinCC flexible

Visualization and operation of automation systems.

OpCon

Bosch OpCon Control Plus

Control solutions for customized automation projects.

SISTEMA

Sistema / Performance Level

Assessment and verification of functional safety according to performance level.

Locations

Standort Braunschweig – Gablonzstraße 9

Braunschweig – Gablonzstraße 9

DE

Head office

  • Siemens TIA Portal
  • Siemens Step7 Classic
  • Beckhoff TwinCAT 3
  • EPlan P8
  • Fluid Plan

Braunschweig – Böttgerstraße 2

DE

Contact address

Services and systems

Control cabinet construction
Control cabinet constructionControl cabinet construction · Mechanical engineering / plant engineering
Simulation – digital twin and retrofit
Simulation – digital twin and retrofitSimulation / Retrofit · Automation technology
Robotics and automation
Robotics and automationRobotics · Automotive
DGUV V3 inspection
DGUV V3 inspectionInspection service · Production
Frequency converter solutions
Frequency converter solutionsDrive control · Plant engineering
Retrofit of legacy controls
Retrofit of legacy controlsRetrofit · Locking and packaging technology

Inside the production

Project planning for automation projects
Project planning for automation projects
PLC programming and automation technology
PLC programming and automation technology
Electrical design with EPlan
Electrical design with EPlan
PLC programming in the automation industry
PLC programming in the automation industry

Industries

AutomotiveFood technologyLocking and packaging technologyConfectionery industryMechanical engineeringPlant engineeringBuilding automationProductionLogisticsBuilding automation/building services

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Project planningEngineering–––––
PLC programming (Siemens TIA Portal, Siemens Step7 Classic, Beckhoff TwinCat3)Engineering–––––
Robotics – consulting and programming of new and existing robotsAssembly–––––
Electrical design with EPlan P8Engineering–––––
Control cabinet construction – planning, design, manufacturing, assembly, energy distribution,Assembly–––––
System wiringAssembly–––––
Simulation – digital twinEngineering–––––
Commissioning and acceptance of PLC controlsAssembly–––––
DGUV V3 inspectionTesting–––––
Engineering–––––
SISTEMA / performance levelEngineering–––––
Frequency converter solutionsEngineering–––––
Maintenance and servicing of control cabinetsAssembly–––––

Additional services

Project planningPLC programming (Siemens TIA Portal, Step7 Classic, Beckhoff TwinCAT 3)RoboticsElectrical design (EPlan P8, Fluid Plan)Control cabinet constructionSystem wiringSimulation – digital twinCommissioningDGUV V3 inspectionSISTEMA / performance levelRetrofit of legacy controls (e.g. S5 to S7-1500)Frequency converter solutionsMaintenance and servicingEnergy distribution and management

Reference customers

Christian Ehlers (customer project clinching technology retrofit)

Quality and standards

Control cabinets are designed and tested in accordance with the relevant DIN EN standards, fully documented and handed over with test reports. Finally, the DGUV V3 inspection (e-check) is carried out to ensure standard-compliant, fault-free operation.

EvidenceBraunschweig
DIN EN standards (control cabinets)
Documentation and test certificates
DGUV V3 inspection
ISO 9001

History

  1. 1994

    Foundation of the company Mike Weber Industrieelektrotechnik.

  2. 2016

    Foundation of Müller + Weber GbR on 01 February 2016 as the successor to Mike Weber Industrieelektrotechnik.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo