Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Neugart – Fertigung

Control cabinet construction, MCR technology and building automation for heating, ventilation and air conditioning systems from Donaueschingen

Neugart Logo

Neugart GmbH

Donaueschingen (headquarters)New on Amplifa

1981Founded by Jürgen Neugart
HRB 611203, AG Freiburg i. Br.Commercial register
DonaueschingenLocation
2000Premium partner of Kieback&Peter

About Neugart

Neugart GmbH manufactures measurement, control and regulation technology (MCR technology) for heating, ventilation and air conditioning technology as well as building automation solutions in Donaueschingen. The range of services includes control cabinet construction including control cabinet wiring according to circuit diagrams, the mechanical machining of control cabinet components such as base plates, doors and side panels, as well as testing of the MCR cabinets with the creation of measurement protocols. As a premium partner of Kieback&Peter, the company relies on the building management systems DDC3000, DDC4000 and Quanteon. In addition to manufacturing, Neugart handles planning, installation, commissioning as well as maintenance and service – all from a single source. The systems are used in schools and public buildings, hospitals and rehabilitation clinics, hotels, residential buildings, industrial plants and municipal utilities, including customers such as the Hotel Öschberghof, Freilacke, Chiron and Heckler & Koch.

Site
Donaueschingen
Processes
Control cabinet construction/wiring (MCR cabinets), Mechanical machining of control cabinet components (base plate, doors, side panels), Testing of the MCR cabinets and creation of measurement protocols, Measurement, control and regulation technology (MCR) for heating, ventilation and air conditioning, Building automation / building management systems (DDC3000, DDC4000, Quanteon from Kieback&Peter), Planning, installation and maintenance of systems for building efficiency and comfort, Control cabinet assembly at the customer's site / assembly of field devices / connection and, Control cabinet construction and control cabinet wiring
Materials
Metal (control cabinet components), Building automation systems DDC3000, DDC4000 and Quanteon (Kieback&Peter)
Founded
1981
Industries
Building automation, Heating, ventilation and air conditioning technology, Schools and public buildings, Hospitals and rehabilitation clinics, Hotels, Industrial plants
  1. 01

    Planning of MCR and building automation

  2. 02

    Control cabinet construction and control cabinet wiring

  3. 03

    Testing of the MCR cabinets and creation of measurement protocols

  4. 04

    Installation and assembly at the customer's site

  5. 05

    Commissioning of the hardware

  6. 06

    Maintenance and service

Systems and Materials

Metall

Metal (control cabinet components)

Base plates, doors and side panels of the MCR cabinets are mechanically machined and assembled; the specific material is not specified.

DDC

Building automation systems DDC3000, DDC4000 and Quanteon (Kieback&Peter)

System platform of the building automation, which Neugart plans, installs and maintains as a Kieback&Peter premium partner.

Locations

Standort Donaueschingen

Donaueschingen

DE

Headquarters with manufacturing (control cabinet construction) and administration

Materials
Metal (control cabinet components)

Inside the production

Management of Neugart GmbH
Management of Neugart GmbH

Industries

Building automationHeating, ventilation and air conditioning technologySchools and public buildingsHospitals and rehabilitation clinicsHotelsIndustrial plantsMunicipal utilities

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Control cabinet construction/wiring (MCR cabinets)Assembly––––Metal (control cabinet base plate, doors, side panels;
Mechanical machining of control cabinet components (base plate, doors, side panels)Assembly–––––
Testing of the MCR cabinets and creation of measurement protocolsTesting–––––
Measurement, control and regulation technology (MCR) for heating, ventilation and air conditioningEngineering–––––
Building automation / building management systems (DDC3000, DDC4000, Quanteon from Kieback&Peter)Engineering–––––
Planning, installation and maintenance of systems for building efficiency and comfortAssembly–––––
Control cabinet assembly at the customer's site / assembly of field devices / connection andAssembly–––––

Additional services

Control cabinet construction and control cabinet wiringControl technology / MCR technologyBuilding automationBuilding management systems (DDC3000, DDC4000, Quanteon from Kieback&Peter)PlanningManufacturingInstallationCommissioningMaintenance and service

Reference customers

Hotel Öschberghof DonaueschingenFrei Lacke / Freilacke DöggingenChiron TuttlingenHeckler & Koch OberndorfKiesel StockstadtFeinmetall HerrenbergAdmedes PforzheimFeldberger HofFürstenberg Brewery DonaueschingenKieback&Peter (premium partner)

History

  1. 1981

    Official founding of the company by Jürgen Neugart.

  2. 1986

    Completion of the company building in Donaueschingen after less than two years of construction.

  3. 1989

    Expansion of the company building – doubling of the usable floor space.

  4. 1991

    Conversion from analog controllers to the multi-loop control processor (MRP) from Kieback & Peter.

  5. 1996

    Hans-Jürgen Bühler joins as a partner and authorized officer; introduction of the DDC3000 building automation system from Kieback&Peter.

  6. 1997

    Oliver Neugart joins as a service technician; installation of the first building management system at the Tannheim follow-up care clinic.

  7. 1999

    Oliver Neugart and Hans-Jürgen Bühler become managing directors; first control cabinet delivery with building management system to the hospital in Yekaterinburg (Russia).

  8. 2000

    Equipping of the Rostov-on-Don hospital (Russia) with control cabinets and building management system; Neugart becomes a premium partner of Kieback&Peter.

  9. 2002

    Training of the first apprentice.

  10. 2006

    First use of the DDC4000 generation from Kieback&Peter.

  11. 2019

    First use of the Quanteon building management system from Kieback&Peter.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo