
Development and manufacture of energy-efficient ventilation units, compact solutions and heat pumps for indoor climate and hot water.
Nilan A/S
Hedensted (DK, headquarters/production) · Trittau (DE) · Urdorf (CH) · Münchendorf (AT)New on Amplifa
About Nilan
Since 1974, Nilan has produced and developed ventilation and heat pump solutions at its headquarters in Hedensted, Denmark. The product range includes ventilation units with passive heat recovery of up to 95%, units with a reversible heat pump for heating and cooling, compact solutions for ventilation, heating, cooling and hot water on 0.56 m², commercial solutions up to 35,000 m³/h and cleanroom units of the VPM Cleanroom series up to 22,000 m³/h. Housings are made of powder-coated Aluzink sheet steel, counterflow heat exchangers are made of polyethylene terephthalate, and R134a is used as refrigerant. Before delivery, every unit undergoes a 100% operational test at the factory. Nilan GmbH in Trittau distributes the products in Germany and is supported by sales offices in Urdorf (Switzerland) and Münchendorf (Austria). Reference projects range from passive houses to office buildings and shipyards to dairies and hotels across Europe.
- Site
- Trittau
- Processes
- Manufacture of ventilation units (continuous production including functional test of all units, Powder coating (housings made of Aluzink sheet steel, powder-coated white RAL9016), Product development and customisation of ventilation and heat pump solutions, Testing/quality assurance (100% operational test of all units, ISO 9001:2015 certified), Project consulting and design, Training for service partners, Technical support, Maintenance and service network (service partners)
- Materials
- Aluzink sheet steel, Polyethylene terephthalate (counterflow heat exchanger), Refrigerant R134a, PVC (condensate drain), Polyethylene terephthalate, PVC
- Certificates
- ISO 9001:2015, SG Ready, Module C2 attestation (pressure equipment, EU 2014/68/EU), Passive House component certification (Compact P2, Combi 400 Polar Top), Pressure Equipment Module C2 (EU 2014/68/EU), Passive House component certification
- Founded
- 1974
- Industries
- Residential construction (single/multi-family houses, passive houses), Commercial (offices, hotels, shopping centres, educational institutions,, Cleanroom technology, Shipbuilding/shipyards, Food processing, Fitness/wellness
- 01
Product development
- 02
Sheet metal working and housing production
- 03
Powder coating
- 04
Assembly of the units
- 05
100% operational test before delivery
- 06
Distribution via country subsidiaries
- 07
Service partner network for commissioning and maintenance
Materials & Processes
Aluzink sheet steel
Housing material of the units, powder-coated in white RAL9016.
Polyethylene terephthalate
Material of the highly efficient counterflow heat exchangers.
Refrigerant R134a
Refrigerant of the reversible refrigeration circuit in units such as the Combi 400 Polar Top.
PVC
Used for the condensate drain of the systems.
Locations
Hedensted
DKHeadquarters and production plant of Nilan A/S
- Materials
- Aluzink sheet steel, PET, R134a, PVC
- Functional test of all units before delivery
Trittau
DESales office Germany (Nilan GmbH)
Urdorf
CHSales office Switzerland (Nilan Schweiz AG)
Münchendorf
ATSales office Austria (Nilan Lüftungssysteme Handels GmbH)
Components






Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Manufacture of ventilation units (continuous production including functional test of all unitsAssembly | – | – | – | – | Aluzink sheet steel (powder coating) |
| Powder coating (housings made of Aluzink sheet steel, powder-coated white RAL9016)Surface | – | – | – | – | Aluzink sheet steel |
| Product development and customisation of ventilation and heat pump solutionsEngineering | – | – | – | – | – |
| Testing/quality assurance (100% operational test of all units, ISO 9001:2015 certified)Testing | – | – | – | – | – |
Additional services
Reference customers
Quality
All ventilation units and heat pumps undergo an operational test before leaving the factory; the complaint rate is 0.8%. The quality management system is certified to ISO 9001:2015.
| Evidence | Hedensted |
|---|---|
| ISO 9001:2015 | |
| SG Ready | |
| Pressure Equipment Module C2 (EU 2014/68/EU) | |
| Passive House component certification |
History
- 1974
Founding of Nilan.
For over 50 years, production and development of ventilation and heat pump solutions with steady internationalisation in Europe.