
General planning and project management for factory and special-purpose systems in industry and research

Planungsbüro Michael Schwarzberger
Eching-Weixerau (Head Office) · Munich (Office)New on Amplifa
About the Planning Office
The Planungsbüro Michael Schwarzberger is an engineering firm for general planning, project design and project management with its head office in Eching-Weixerau and an office in Munich. The range of services includes analyses and feasibility studies, concepts (condition surveys, work analyses, logistics), project design according to HOAI phases 1 to 9, project management, construction supervision, H&S (SiGe) coordination, building services engineering (TGA) as well as building physics with acoustics, structural analysis and foundations. A particular focus is the planning of factory and workshop facilities such as engine test benches, crash test facilities, acoustic and hydropuls test benches as well as press systems. Clients include, among others, BMW AG, the Technical University of Munich, Lufthansa, Krauss Maffei, Schott Glaswerke and Siemens. The company operates as a sole proprietorship under the leadership of owner Michael Schwarzberger and handles projects in Germany.
- Site
- Eching-Weixerau
- Processes
- Analyses and feasibility studies, Project design and realization (HOAI phases 1 to 9), Project management, Concepts (condition surveys, work analyses, logistics), Building physics (acoustics, foundations, structural analysis), Construction supervision (superstructure and site management, commissioning and acceptance, invoice, SiGeKo (H&S coordination), TGA (Building Services Engineering)
- Materials
- Analyses and Feasibility Studies, Project Design and Realization (HOAI 1–9), Project Management, Building Physics (Acoustics, Structural Analysis, Foundations), Construction Supervision, H&S Coordination (SiGeKo) and Building Services (TGA)
- Industries
- Automotive, Aviation, Rail/Maintenance, Glass Industry, Electrical Engineering/Medical Technology, Insurance (Special-Purpose Buildings)
- 01
Analyses and feasibility studies
- 02
Concepts (condition surveys, work analyses, logistics)
- 03
Project design and realization (HOAI phases 1–9)
- 04
Project management
- 05
Construction supervision/site management, H&S coordination (SiGeKo), building
- 06
Invoice verification, cost control and project documentation
Service Areas and Planning Disciplines
Analyses and Feasibility Studies
Establishing the fundamentals for implementing project ideas and analysis of process and functional sequences for spatial structures.
Project Design and Realization (HOAI 1–9)
Parallel or simultaneous planning with coordination and integration of user requirements, including alternative proposals.
Project Management
External coordination and monitoring of project processes, including bridging capacity bottlenecks.
Building Physics (Acoustics, Structural Analysis, Foundations)
Specialist planning for acoustic requirements, structural analysis and foundations of special-purpose systems.
Construction Supervision, H&S Coordination (SiGeKo) and Building Services (TGA)
Site management, supplier coordination through to commissioning and acceptance, H&S coordination and building services engineering.
Locations

Eching-Weixerau
DEHead Office
Munich
DEOffice (Ingolstädter Straße 45, Building 3, 2nd Floor)
Reference Projects



Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Analyses and feasibility studiesEngineering | – | – | – | – | – |
| Project design and realization (HOAI phases 1 to 9)Engineering | – | – | – | – | – |
| Project managementEngineering | – | – | – | – | – |
| Concepts (condition surveys, work analyses, logistics)Engineering | – | – | – | – | – |
| Building physics (acoustics, foundations, structural analysis)Engineering | – | – | – | – | – |
| Construction supervision (superstructure and site management, commissioning and acceptance, invoiceEngineering | – | – | – | – | – |
| SiGeKo (H&S coordination)Engineering | – | – | – | – | – |
| TGA (Building Services Engineering)Engineering | – | – | – | – | – |
| General planning / planning of factory and workshop facilities (e.g. engine test benches, crashEngineering | – | – | – | – | – |
12 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Hydropuls test benches | – | – | – | – | – |
| Drivetrain test bench | – | – | – | – | – |
| Acoustic roller test bench | – | – | – | – | – |
| Engine test benches | – | – | – | – | BMW AG Plant 01.50 (FIZ) |
| Exhaust emission roller test bench | – | – | – | – | BMW AG Motorcycle Division |
| Acoustic test benches | – | – | – | – | BMW AG Plant 01.90 Aschheim |
| Crash test facility | – | – | – | – | BMW AG Plant 01.90 Aschheim |
| Presses for blank part production | – | – | – | – | BMW AG Neusser Str. |
| Wind tunnel (externally located) | – | – | – | – | Technical University of Munich |
| Two-story shelving racking system for small parts | – | – | – | – | BMW AG Munich FIZ |
| Painting system with preparation room | – | – | – | – | BMW AG Munich |
| Special vehicle washing system | – | – | – | – | Munich Reinsurance |
Additional services
Reference customers
History
- 1991–1997
Planning and execution of the relocation of the Faculty of Mechanical Engineering of the Technical University of Munich to Garching (relocation volume EUR 50 million, new investment EUR 20 million)