
Drinking water supply from ten groundwater works and wastewater disposal with 23 sewage treatment plants for Stralsund and the region

Regionale Wasser- und Abwassergesellschaft Stralsund GmbH
Stralsund (Bauhofstraße 5) · 10 waterworks in the district of Vorpommern-RügenNew on Amplifa
About REWA Stralsund
The Regional Water and Wastewater Company Stralsund GmbH (REWA) is a subsidiary of Stadtwerke Stralsund and was founded in 1992 as the successor to Nordwasser GmbH. The company operates the public drinking water supply in the Hanseatic city of Stralsund and in 25 towns and municipalities in the district of Vorpommern-Rügen, supplying around 85,500 people. The drinking water is extracted from underground water sources (groundwater) in ten waterworks and distributed via more than 700 kilometers of pipelines. Wastewater disposal is carried out via 23 sewage treatment plants, including the Stralsund sewage treatment plant with an expansion capacity of 120,000 population equivalents. The service portfolio also includes fecal sludge removal, sewer and pipe cleaning, camera runs with TV inspections, pressure and leak tests, and house connections for drinking and wastewater. Since 2023, the company has been conducting its own investigation strategy for PFAS in drinking water that goes beyond the legal requirements. The company is headquartered at Bauhofstraße 5 in Stralsund.
- Site
- Stralsund
- Processes
- Drinking water treatment (waterworks), Wastewater treatment/processing, Pipe and sewer cleaning, Removal of blockages (wastewater/rainwater), Camera runs and TV inspections, Pressure tests & leak tests, Drinking water supply (groundwater, 10 waterworks, >700 km of pipelines), Wastewater disposal (23 sewage treatment plants)
- Materials
- Drinking Water Treatment, Wastewater Treatment
- Founded
- 1992-02-27
- Employees
- 148 employees +
- Industries
- Water and Wastewater Supply, Municipal Utility Sector
- 01
Groundwater extraction in 10 waterworks
- 02
Water treatment and quality control
- 03
Distribution via a >700 km pipeline network
- 04
Wastewater collection in the sewer network
- 05
Wastewater treatment in 23 sewage treatment plants
- 06
Sewage gas utilization and energy generation
Extraction and Treatment
Drinking Water Treatment
Groundwater extraction in ten waterworks; quality in accordance with the Drinking Water Ordinance is ensured through regular controls.
Wastewater Treatment
Mechanical-biological treatment at 23 sewage treatment plants including sludge digestion with sewage gas utilization.
Waterworks and Sewage Treatment Plants

Stralsund
DEHeadquarters with administration, engineering department, wastewater, and the Lüssow waterworks; location of the
- Stralsund sewage treatment plant with sewage gas utilization (approx. 640,000 m³/a, approx. 1.2 million kWh electricity generation)
- Hydrus 2.0 ultrasonic water meter
Services


Inside the production



Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Drinking water treatment (waterworks)Engineering | – | – | – | – | Water |
| Wastewater treatment/processingEngineering | – | – | – | – | Wastewater |
| Pipe and sewer cleaningSurface | – | – | – | – | – |
| Removal of blockages (wastewater/rainwater)Engineering | – | – | – | – | – |
| Camera runs and TV inspectionsTesting | – | – | – | – | – |
| Pressure tests & leak testsTesting | – | – | – | – | – |
3 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Waterworks | – | 10 | – | – | District of Vorpommern-Rügen |
| Sewage treatment plant | – | 1 | – | – | Stralsund |
| Ultrasonic water meter (Hydrus) | Hydrus 2.0 | – | – | – | – |
Additional services
History of the Stralsund Water Supply
- 1234
First documented mention of water collection (collecting snow and rainwater) in connection with the founding of the city
- 1271
First pipeline from Frankenteich to the Semlower Gate; supply of 15 wells
- 1687
Emergence of the Stralsund Water Art with diversion from the Knieperteich
- 1873
Water lifting with steam-driven machines
- 1894
Inauguration of the Lüssow waterworks with filtration facilities (6,000 m³/day)
- 1930
Construction of a sewage treatment plant for 40,000 inhabitants with mechanical treatment
- 1953
Construction of a central sewage treatment plant with capacity for up to 100,000 inhabitants
- 1960
Integration of the Andershof I and II waterworks into the water supply
- 1992
Founding of REWA Stralsund GmbH on 27.02.1992 as the successor to Nordwasser GmbH; replacement of surface water treatment by groundwater supply
- 1995
Commissioning of the modernized, fully biological sewage treatment plant for 120,000 inhabitants
- 1997
Commissioning of the sludge digestion plant with sewage gas utilization (approx. 640,000 m³/a, approx. 1.2 million kWh electricity generation)
- 2000
Sewer network of 170 km in length; connection rate of almost 100 percent
- 2023
Establishment of an in-house investigation strategy for PFAS in drinking water
- 2024
NDR report on the Lüssow waterworks (DAS!, 20.11.2024)