Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
REPS – Fertigung

Energy harvesting systems that convert braking energy from road traffic into electricity

REPS Logo

REPS-Tirol GmbH

Mils (AT)New on Amplifa

2023Founded
12 × 3 mSystem dimensions
20–25 yearsProduct service life
Hamburg, ATLocations

About REPS

REPS-Tirol GmbH develops and installs energy harvesting systems that convert the kinetic energy of braking vehicles into electrical energy. The core product is a 12 × 3 meter road slab with 27 hydraulic trigger pairs, embedded in a 12.5 cm civil foundation layer of steel or concrete. The vertical force is transmitted via hydraulic lines to a central energy converter module based on permanent magnetic bearings, which operates almost friction-free. The generated energy is stored in battery storage systems and can be used for charging infrastructure, operating facilities, or grid feed-in. Areas of application are sections with braking traffic such as traffic lights, toll stations, and motorway exits, especially in ports, terminals, and logistics hubs. Founded in 2023 and headquartered in Mils in Tyrol, the company installed the world's first operational road power plant in the Port of Hamburg in November 2025.

Site
Mils
Processes
Energy Harvesting System (road slabs with hydraulic trigger units), Site potential analysis, Installation of energy harvesting systems in road construction, Maintenance (annual inspection)
Materials
Steel, Concrete (civil foundation, 12.5 cm), Concrete (civil foundation)
Founded
2023
Industries
Ports/Terminals, Motorways/Highways, Logistics hubs
  1. 01

    Site potential analysis

  2. 02

    Engineering and prototyping

  3. 03

    Manufacturing of trigger units and converter modules

  4. 04

    Installation in road construction

  5. 05

    Maintenance (annual inspection)

Materials & System Technology

Stahl

Steel

Material of the road slabs and trigger units for systems that withstand high load cycles.

Beton

Concrete (civil foundation)

12.5 cm foundation for structural stabilization under heavy freight traffic.

Locations

Mils

AT

Headquarters/Office

Materials
Steel, concrete

System Components

Road slab with trigger units
Road slab with trigger unitsEnergy harvesting · Road infrastructure
Energy converter module
Energy converter modulePermanent magnetic bearings · System core

Inside the production

REPS system illustration
REPS system illustration

Industries

Ports/TerminalsMotorways/HighwaysLogistics hubs

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Energy Harvesting System (road slabs with hydraulic trigger units)Engineering–12 m × 3 m––Steel, Concrete

Additional services

Site potential analysisInstallation of energy harvesting systems in road constructionMaintenance (annual inspection)

Reference customers

Port of Hamburg (installation of the first live system)

History

  1. 2019

    First concept and initial R&D by Alfons Huber

  2. 2020

    First functioning prototype after over 20,000 measurements and 2,000 simulations

  3. 2023

    Founding of REPS-Tirol GmbH

  4. 2023

    Validation of the technology on the first continuous test track

  5. 2025

    Team expansion through first engineering and business hires

  6. 2025

    EWOR fellowship and seed investment

  7. 2025

    World's first operational road power plant installed in the Port of Hamburg

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo