Special-purpose machinery, test benches and electrical systems with design, CNC manufacturing, PLC programming and worldwide commissioning

SAR Gröpler GmbH
Paul-Lechler-Straße 8, 72581 Dettingen an der Erms, GermanyNew on Amplifa
This is SAR Gröpler GmbH
SAR Gröpler GmbH is a family-owned company founded in 1993 and headquartered in Dettingen an der Erms, specializing in the construction of special-purpose machinery, test benches and electrical systems. The company offers complete turnkey solutions: from planning and design with 3D CAD (SolidWorks) and CNC machining of single parts and small series through to assembly of complete machines, systems and assemblies including pneumatics, hydraulics, electrics and electronics. Core competencies include electrical engineering design, PLC programming to IEC 61131, control cabinet construction including EMC-sensitive and Ex-protected systems, as well as retrofit and modernization of existing systems. Quality management certification to DIN EN ISO 9001:2015 ensures quality and on-time delivery. Customers include well-known automotive manufacturers and suppliers as well as companies in the aerospace industry; the systems are in operation worldwide.
- Site
- Dettingen an der Erms
- Processes
- Special-purpose machinery construction (manual, semi-automatic, fully automatic, single application, Electrical system construction, Retrofit / modernization of existing systems, Electrical engineering design / electrical design, PLC programming to IEC 61131 (Siemens, Beckhoff, Wago, VIPA, Allen-Bradley), Programming of real-time measurement systems (Adwin, National Instruments), Control cabinet construction (including EMC-sensitive and Ex-protected systems), Installation and commissioning in Germany and abroad
- Materials
- Steel (control cabinet construction, metal processing), Steel, Pneumatics, Hydraulics
- Certificates
- DIN EN ISO 9001:2015, ISO 9001
- Founded
- 1993
- Industries
- Automotive manufacturers and suppliers, Aerospace industry, Mechanical and plant engineering
- 01
Planning
- 02
Design (3D CAD, SolidWorks)
- 03
CNC machining / manufacturing
- 04
Control cabinet construction
- 05
PLC programming / electrical engineering
- 06
Assembly
- 07
Commissioning
- 08
Maintenance and service
Materials and processes
Steel
Used in control cabinet construction and metal processing; the parts are machined on the in-house control cabinet milling center.
Pneumatics
The installation of pneumatics is part of the assembly of machines, systems and assemblies.
Hydraulics
The installation of hydraulics in conjunction with electrics and electronics is covered by the assembly team.
Locations
Dettingen an der Erms
DEHeadquarters with design, CNC manufacturing, control cabinet construction, PLC programming and assembly
- Lot size
- Single part to small series
- Materials
- Steel (control cabinet construction, metal processing)
- Control cabinet milling center
- 3D CAD (SolidWorks)
- CAD/CAM program creation
Components



Inside the production





Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Special-purpose machinery construction (manual, semi-automatic, fully automatic, single applicationAssembly | – | – | – | – | – |
| Electrical system constructionAssembly | – | – | – | – | – |
| Retrofit / modernization of existing systemsAssembly | – | – | – | – | – |
| Electrical engineering design / electrical designEngineering | – | – | – | – | – |
| PLC programming to IEC 61131 (Siemens, Beckhoff, Wago, VIPA, Allen-Bradley)Engineering | – | – | – | – | – |
| Programming of real-time measurement systems (Adwin, National Instruments)Engineering | – | – | – | – | – |
| Control cabinet construction (including EMC-sensitive and Ex-protected systems)Assembly | – | – | – | – | Stahl |
| Installation and commissioning in Germany and abroadAssembly | – | – | – | – | – |
| Industry 4.0 / network integration and digitalization of systemsEngineering | – | – | – | – | – |
| Test bench constructionAssembly | – | – | – | – | – |
| Design with 3D CAD (SolidWorks), simulation and analysisEngineering | – | – | – | – | – |
| CNC machining using CAD/CAMMachining | – | – | – | Single part – Small series | – |
| Classical program creation based on sketches or technical drawingsMachining | – | – | – | – | – |
| Assembly of complete machines, systems and assemblies (prototype or small series), incl.Assembly | – | – | – | – | – |
| Maintenance and service (in Germany and abroad)Assembly | – | – | – | – | – |
1 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Control cabinet milling center | – | – | – | – | Dettingen an der Erms |
Additional services
Reference customers
Quality
SAR Gröpler GmbH places the highest priority on quality and on-time delivery; quality management has been certified to DIN EN ISO 9001:2015 since 2018, with initial certifications to ISO 9001:2000 (2004) and ISO 9001:2008 (2009). Proper documentation of all products is part of the designers' daily routine.
| Evidence | Dettingen an der Erms |
|---|---|
| ISO 9001 |
History
- 1993
Foundation of SAR Gröpler GmbH
- 2004
First certification to DIN EN ISO 9001:2000
- 2009
Certification to DIN EN ISO 9001:2008
- 2018
Quality management certified to DIN EN ISO 9001:2015