Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Schwarzbacher Schloßbrauerei – Fertigung

Brewery in the Thuringian Forest – beer and lemonade production, bottling in bottles and KEG kegs since 1400

Schwarzbacher Schloßbrauerei Logo

Schloßbrauerei Schwarzbach GmbH

Schwarzbach (Thuringia)New on Amplifa

1400First documented brewing tradition
GmbHLegal form (HRB 300085, District Court of Jena)
1990Buy-back and new beginning after expropriation

About Schloßbrauerei Schwarzbach

Schloßbrauerei Schwarzbach GmbH is a Thuringian brewery in Schwarzbach (municipality of Auengrund) in the Thuringian Forest, which traces a brewing tradition first documented in 1400. The range includes a Helles (Pils), the black beer Raubritter Dunkel, the wheat beer Sonnen-Weiße, a Bock beer, a dark double caramel, and, as a nourishing beer variant, a malt beer with low alcohol content (1.9%) made from sugar and yeast; in addition, various lemonades are bottled. Production takes place in the brewery's own brewhouse with an energy-saving boiling system, modern beer filtration, and filling in bottles (0.5 l) and KEG kegs. Value creation includes an in-house biological wastewater treatment plant, logistics with its own vehicle fleet, and photovoltaic systems on the brewhouse and warehouse. In 2024, an energy-saving bottle washing system from GM Getränketechnik of Gera was commissioned. The market area is the hospitality industry and beverage trade in Thuringia and Franconia.

Site
Schwarzbach
Processes
Beer brewing (brewhouse), Bottle washing, Bottle filling, KEG keg filling, Beer filtration, Palletizing and depalletizing, Bottling in bottles and kegs (KEG), Lemonade bottling
Materials
Water, Malt, Yeast, Lemonade
Certificates
Membership in BNG – Trade Association for the Food and Hospitality Industry
Founded
1400
Industries
Brewing, Beverage trade, Hospitality
  1. 01

    Brewhouse – brewing (energy-saving boiling system)

  2. 02

    Fermentation and maturation

  3. 03

    Beer filtration

  4. 04

    Bottle washing and inspection

  5. 05

    Filling bottle / KEG keg

  6. 06

    Palletizing and depalletizing

  7. 07

    In-house logistics / vehicle fleet

Raw Materials & Brewing Process

W

Water

Basic raw material of beer; in 1902 the brewery acquired the water rights below the brewery.

M

Malt

Main raw material for the beer specialties in the range.

H

Yeast

Used for fermentation and for the nourishing beer with 1.9% alcohol made from sugar and yeast.

L

Lemonade

In-house bottling of various lemonades complements the beer range.

Location

Standort Schwarzbach

Schwarzbach

DE

Brewery and administration

Materials
Water, malt, yeast
  • Brewhouse with energy-saving boiling system
  • Beer filtration
  • Bottle washing system (GM Getränketechnik, 2024)
  • Bottle filling machine (2001)
  • Full bottle inspection system (2001)
  • KEG filling system (2007)
  • Palletizing and depalletizing system
  • In-house biological wastewater treatment plant
  • Photovoltaic systems (600 m² and over 1,000 m²)
  • Warehouse of over 1,000 m²

Product Range

Beers in 0.5-l bottle and keg
Beers in 0.5-l bottle and kegBottling · Brewing / Hospitality

Inside the production

Old brewery – historical photo
Old brewery – historical photo
Brewery technology
Brewery technology
Brewery technology
Brewery technology
Brewery technology
Brewery technology
Brewery technology
Brewery technology
Exterior view of Schloßbrauerei Schwarzbach
Exterior view of Schloßbrauerei Schwarzbach

Industries

BrewingBeverage tradeHospitality

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Beer brewing (brewhouse)Food/beverage production––––Water, Malt, Hops, Yeast, Sugar
Bottle washingFood/beverage production––––Glass bottles
Bottle fillingFood/beverage production––––Beer, Lemonade
KEG keg fillingFood/beverage production––––Beer
Beer filtrationFood/beverage production––––Beer
Palletizing and depalletizingFood/beverage production––––Containers

7 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Bottle washing systemGM Getränketechnik1–2024Schwarzbach
Bottle filling machine–1–2001Schwarzbach
Full bottle inspection system–1–2001Schwarzbach
KEG filling system–1–2007Schwarzbach
Brewhouse with energy-saving boiling system–1–2009Schwarzbach
Beer filtration–1–2009Schwarzbach
Palletizing and depalletizing system–1–2001Schwarzbach

Additional services

Bottling in bottles and kegs (KEG)Lemonade bottlingin-house biological wastewater treatment plantin-house logistics / vehicle fleet

Quality & Environment

The brewery operates its own biological wastewater treatment plant and, in 2024, reduced its water consumption by roughly two thirds thanks to the new bottle washing system. Photovoltaic systems on the brewhouse and warehouse (a total of around 1,600 m²) generate solar power; the vehicle fleet was converted to fuel-saving vehicles.

EvidenceSchwarzbach
Membership in BNG – Trade Association for the Food and Hospitality Industry

History

  1. 1400

    First documented brewing tradition: the owner of the inn at the mill brews beer himself for the first time.

  2. 1720

    Construction of a new brewhouse; a castle servant was the brewmaster.

  3. 1721

    The Count grants the brewing and tavern rights for Schwarzbach and Brattendorf.

  4. 1851

    Peter Trier from Veilsdorf acquires the brewery and the inn "Zum Schloß".

  5. 1902

    Purchase of the water rights with mill wheel and millrace; first electricity generation for the inn.

  6. 1927

    New brewhouse building by Otto and Fritz Trier.

  7. 1935–1939

    Construction of new fermentation, storage and yeast cellars; conversion of the cooling supply from ice to refrigeration machines.

  8. 1949

    Expropriation of the brothers Otto and Fritz Trier without compensation.

  9. 1990

    Buy-back and new beginning; investments in the brewhouse, in-house wastewater treatment plant, storage cellar and bottle washing.

  10. 2001

    Second modernization stage under Christel and Oliver Nowak: palletizing and depalletizing, full bottle inspection, new bottle filling machine.

  11. 2007

    Commissioning of a filling system for KEG beer kegs.

  12. 2009

    Energy-saving boiling system in the brewhouse, 600 m² photovoltaic system, modern beer filtration.

  13. 2010

    Construction of the new warehouse of over 1,000 m² including a photovoltaic system.

  14. 2018

    Over 2.1 million euros invested since 2001, among other things renewal of the vehicle fleet.

  15. 2024

    Presence at the International Green Week in Berlin; commissioning of an energy-saving bottle washing system from GM Getränketechnik (Gera), which reduces water consumption by around two thirds.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo