Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Schwaben-Kunststoff – Fertigung

Manufacturer of storage tanks, process vessels and tank systems made of thermoplastics for liquids hazardous to water.

Schwaben-Kunststoff Logo

Schwaben-Kunststoff Chemietank- und Apparatebau GmbH & Co. KG

LangenneufnachNew on Amplifa

1969Founded
500 l – 200 000 lVessel volume
1,5–3,5 mWound pipe diameter
WorldwideDeliveries including USA, China, UAE

About Schwaben-Kunststoff

Schwaben-Kunststoff Chemietank- und Apparatebau GmbH & Co. KG is an owner-managed company founded in 1969 and headquartered in Langenneufnach near Augsburg. The company manufactures storage tanks, process vessels, tank systems, apparatus, pipework, filling cabinets, syphon lines, filling stations and IBC dosing stations from thermoplastics such as PE-100, PE-HD, PP, PVC and PVDF. The vessels are produced as spirally wound cylindrical shells (wound pipe, 1,5 to 3,5 m diameter) or from welded sheet material; vessel sizes range from 500 litres to 200 000 litres. Services include engineering with CAD design and structural calculations, logistics, installation and commissioning. The storage tanks have building-authority approval (DIBt approvals) and are inspected by internal and external monitoring by TÜV Süd. Fields of application include chemical distribution, the semiconductor industry, automotive engineering, AdBlue tank systems, wastewater treatment plants, the food, paper and pharmaceutical industries as well as water treatment.

Site
Langenneufnach
Processes
Manufacture of storage tanks from thermoplastics (wound pipe/sheet material), Manufacture of process vessels (mixing, dosing, agitator and rinse water vessels), Wound pipe production (spirally wound cylindrical shells), Welded constructions from sheet material (plastics welding, joining of thermoplastics), Tank system construction (tank farms including pipework construction), Pipework construction (plastic and stainless steel pipework), Apparatus construction (chemical apparatus, filter housings, exhaust air technology), Engineering (planning, project engineering, CAD design, design of special components, structural
Materials
PE-100, PE-HD, Polypropylene random copolymer (PP-R), Polypropylene homopolymer (PP-H), PP, PE-LLD, PVC-U, PVC
Certificates
TÜV Süd internal and external monitoring, DIBt approvals (Z-40.21-10, -120, -221), Ü mark / building-authority approval, Proficiency test joining of thermoplastics (TÜV)
Founded
1969
Industries
Chemical distribution, Semiconductor industry, Automotive engineering, Wastewater treatment plants, Food industry, Paper industry
  1. 01

    Engineering (CAD design, structural calculations)

  2. 02

    Wound pipe production / sheet fabrication

  3. 03

    Plastics welding (joining of thermoplastics)

  4. 04

    Vessel and apparatus manufacturing

  5. 05

    Quality monitoring (TÜV Süd)

  6. 06

    Logistics

  7. 07

    Installation and commissioning

Materials & Processes

PE-100

PE-100

Main material for approved storage tanks and containment facilities, also as wound pipe.

PE-HD

PE-HD

Used for process vessels, filling cabinets, tank systems and vessel accessories.

PP

Polypropylene (PP)

Used for process vessels, pipework, pump brackets and welded constructions.

PP-R

PP-R

Wound pipe material for storage tanks up to 200 000 litres and operating temperatures up to 70 °C.

PP-H

PP-H

Used in the semiconductor industry for filter housings, rinse water and mixing vessels.

PVC-U

PVC-U

Pipework construction, syphon vessels and valves in tank systems.

PVDF

PVDF

For chemically highly stressed pipework and vessels in tank systems and filling stations.

GFK

GRP

Housing material for filling cabinets and filling stations.

ABS/HDPE

ABS & HDPE

Inner and outer pipe of pre-insulated cooling pipe systems (Georg Fischer CoolFit) with polyurethane foam insulation.

VA

Stainless steel

Pipework construction, subframes, reinforcement profiles and bolt sets in gas-tight manholes.

Locations

Langenneufnach

DE

Headquarters and production

Lot size
Single-unit and series production of vessels from 500 l to 200 000 l
Materials
PE-100, PE-HD, PP, PP-R, PP-H, PVC, PVDF, stainless steel
  • Wound pipe system (extruder for spirally wound cylindrical shells)
  • Plastic welding machines (regularly TÜV-inspected)

Products & Components

Storage tank made of PE-100 wound pipe with containment facility
Storage tank made of PE-100 wound pipe with containment facilityWound pipe · Chemical distribution
Dosing vessel made of PE-HD sheet material
Dosing vessel made of PE-HD sheet materialPlastics welding · Pharmaceutical industry
Rinse water process vessel made of PP-H
Rinse water process vessel made of PP-HWelded construction · Semiconductor industry
Tank farm with storage tanks and pipework construction
Tank farm with storage tanks and pipework constructionTank system construction · Textile industry
Exhaust air scrubber with Venturi pipe
Exhaust air scrubber with Venturi pipeApparatus construction · Chemicals
Pump station in PP for a brewery
Pump station in PP for a breweryPipework construction · Food industry
Filling station type AFS-200
Filling station type AFS-200Apparatus construction · Chemicals
Fully automatic syphon lines
Fully automatic syphon linesPipework construction · Chemical distribution
Filling cabinet made of PE-HD
Filling cabinet made of PE-HDWelded construction · Chemicals
Pre-insulated cooling pipe (ABS/HDPE)
Pre-insulated cooling pipe (ABS/HDPE)Pipework construction · Refrigeration technology
Dosing station for hydrogen peroxide
Dosing station for hydrogen peroxideInstallation · Chemicals
Compact tank system for AdBlue in accordance with WHG
Compact tank system for AdBlue in accordance with WHGTank system construction · Automotive industry

Inside the production

Company premises in Langenneufnach
Company premises in Langenneufnach
Granulate is melted in the extruder for wound pipe production
Granulate is melted in the extruder for wound pipe production
Chemical supply station for the automotive industry
Chemical supply station for the automotive industry
Tank farm for a chemical distribution company
Tank farm for a chemical distribution company
Storage tank with containment facility for wastewater treatment plants
Storage tank with containment facility for wastewater treatment plants
Dosing system for the paper industry
Dosing system for the paper industry
Manhole, standard version (vessel accessories)
Manhole, standard version (vessel accessories)
Pump bracket with float-type flow meters
Pump bracket with float-type flow meters

Industries

Chemical distributionSemiconductor industryAutomotive engineeringWastewater treatment plantsFood industryPaper industryTextile industryPharmaceutical industryWater treatmentAdBlueGeorg Fischer CoolFit

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Manufacture of storage tanks from thermoplastics (wound pipe/sheet material)Plastics–––500 l – 200 000 lPE-100, PE-HD, PP-R, PP-H, PP, PVC, PVDF
Manufacture of process vessels (mixing, dosing, agitator and rinse water vessels)Plastics–––approx. 500 lPE-HD, PP, PP-H, PVC, PVDF, PE-LLD
Wound pipe production (spirally wound cylindrical shells)Plastics–1,5 to 3,5 m diameter––PE-100, PP-R, PE-HD
Welded constructions from sheet material (plastics welding, joining of thermoplastics)Joining––––PP-H, PE-HD, PP, PVC, PVDF
Tank system construction (tank farms including pipework construction)Plastics––––PE-HD, PVC-U, PVDF, stainless steel
Pipework construction (plastic and stainless steel pipework)Joining––––PVC-U, PVDF, stainless steel, PP, PE-HD, ABS, HDPE
Apparatus construction (chemical apparatus, filter housings, exhaust air technology)Plastics––––PP-H, PP, PE-HD, PVC, PVDF
Engineering (planning, project engineering, CAD design, design of special components, structuralEngineering–––––
Installation of vessels and tank systems (including commissioning)Assembly–––––
Manufacture of filling cabinets (GRP, PE-HD)Plastics–approx. 600 mm × approx. 1200 mm––GRP, PE-HD, PVC-U
Manufacture of syphon lines (manual and fully automatic)Plastics––––PVC-U, PP-H, Duranglass
Manufacture of filling stations (type AFS-100/AFS-200)Plastics––––GRP, PVC-U, PP, PVDF, PE-HD, EPDM, FPM
Manufacture of IBC dosing stations (skids)Assembly–1950 mm × 1950 mm × 2000 mm––PE-100, PVC
Manufacture of semi-finished products (plastic semi-finished products)Plastics––––PE-HD, PP, PVC, PVDF
Pre-insulated piping systems (Georg Fischer CoolFit, ABS/HDPE with polyurethane foam insulation)Plastics––––ABS, HDPE, polyurethane foam
Pump and dosing systems (pump cabinet, pump stations, dosing stations)Assembly––––PP, PE-HD, stainless steel, PVC
Manufacture of vessel accessories (manholes, nozzles, overfill protection, leak warning indicator,Plastics––––PE-HD, PVC, stainless steel
Quality assurance/material and product testing (TÜV Süd internal and external monitoring,Testing–––––

2 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Wound pipe system (production of spirally wound cylindrical shells)––––Langenneufnach
Plastic welding machines (regularly inspected machines for the joining of thermoplastics)––––Langenneufnach

Additional services

Engineering (CAD design, structural calculations, design of special components)LogisticsInstallationQuality monitoringCommissioning and after-sales service (AdBlue tank systems)Pipework construction

Reference customers

LEWA GmbH (distribution partner for IBC dosing station)Georg Fischer (CoolFit)

Quality

All materials and production stages are continuously inspected and documented by TÜV Süd within the framework of an agreement on internal and external monitoring. Production undergoes the annual TÜV proficiency test in the joining of thermoplastics; vessels requiring approval bear the Ü mark, and structural calculations are prepared in an inspectable form.

EvidenceLangenneufnach
TÜV Süd internal and external monitoring
DIBt approvals (Z-40.21-10, -120, -221)
Ü mark / building-authority approval
Proficiency test joining of thermoplastics (TÜV)

History

  1. 1969

    Foundation of the owner-managed company

  2. 1979

    First general building-authority approval of the storage tanks following extensive testing

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo