SIAG – Fertigung

Manufacture of steel towers for wind turbines: cutting, steel construction, coating and final assembly in Leipzig.

SIAG Logo

SIAG Tube & Tower GmbH

LeipzigNew on Amplifa

1991Founded (over 33 years of experience)
124Employees
4,690Towers delivered
>100 towers/yearAnnual capacity
80 t / 35 mMax. section weight/length

About SIAG Tube & Tower

SIAG Tube & Tower GmbH manufactures steel towers for onshore wind turbines in Leipzig. The value chain comprises the cutting of steel plates by oxy-fuel cutting with weld seam preparation and plasma marking, the production of tower sections in steel construction, blast priming as well as primer and topcoat finishing, and finally final assembly with mechanical and electrical components. Every year, more than 2,500 plates and over 20,000 tonnes of steel are cut, more than 50,000 metres of weld seam are produced and around 220,000 square metres of surface are coated. The sections are up to 35 metres long and weigh 80 tonnes; over 100 onshore towers leave the plant each year. SIAG supplies customers in Germany and Europe across 28 delivery countries and has been a partner of the energy transition for more than 30 years.

Site
Leipzig
Processes
Plate cutting (oxy-fuel welding with weld seam preparation, plasma technology marking, grinding), Steel construction / weld seam production into tower sections, Preparation (pre-cutting/pre-fastening), Coating (preparation, primer and topcoat finishing), Final assembly of wind tower sections (mechanical and electrical components), Cutting (oxy-fuel cutting, plasma technology), Steel construction/welding, Coating (blast priming, primer and topcoat finishing)
Materials
Steel, Oxy-fuel cutting, Plasma technology, Welding, Coating, Final assembly
Certificates
In-house inspection personnel
Employees
124
Industries
Wind energy (onshore towers)
  1. 01

    Cutting (oxy-fuel cutting, plasma technology, grinding, measuring)

  2. 02

    Steel construction / welding into tower sections

  3. 03

    Blast priming

  4. 04

    Primer and topcoat finishing

  5. 05

    Final assembly (mechanical and electrical components)

  6. 06

    Final cleaning and transport preparation

  7. 07

    Quality inspection

Materials & Processes

S

Steel

Base material of the tower sections; over 20,000 t of plate cutting per year.

AUT

Oxy-fuel cutting

Cutting of weld seam preparation on steel plates during cutting.

PLA

Plasma technology

Marking of the cut plates before steel construction.

SCH

Welding

Over 50,000 m of weld seam per year into sections up to 35 m in length and 80 t in weight.

BES

Coating

Blast priming, primer and topcoat finishing for life-cycle durability of the wind turbine.

MONT

Final assembly

Installation of mechanical and electrical components after the coating has cured.

Locations

Standort Leipzig

Leipzig

DE

Production plant for tower manufacturing (cutting, steel construction, coating, final assembly)

Part weight / size
Sections up to 80 t, 35 m in length
Lot size
>2,500 plates/year, >100 towers/year
Materials
Steel
  • Oxy-fuel cutting system
  • Plasma technology
  • Welding technology
  • Two coating lines (blast priming, primer/topcoat finishing)
  • Assembly area

Components

Wind turbine tower section
Wind turbine tower sectionWelding · Wind energy
Onshore wind tower
Onshore wind towerAssembly · Wind energy
Coated tower section
Coated tower sectionCoating · Wind energy

Inside the production

Leipzig plant – tower manufacturing
Leipzig plant – tower manufacturing

Industries

Wind energy (onshore towers)

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Plate cutting (oxy-fuel welding with weld seam preparation, plasma technology marking, grinding)Machining–––2,500 plates/yearSteel
Steel construction / weld seam production into tower sectionsJoining–35 m80 tover 50,000 m of weld seam/yearSteel
Preparation (pre-cutting/pre-fastening)Joining––––Steel
Coating (preparation, primer and topcoat finishing)Surface–––220,000 m²/yearSteel
Final assembly of wind tower sections (mechanical and electrical components)Assembly–––over 100 towers/yearSteel

Additional services

Cutting (oxy-fuel cutting, plasma technology)Steel construction/weldingCoating (blast priming, primer and topcoat finishing)Final assemblyQuality inspection (in-house inspection personnel)Transport preparation

Quality

In-house inspection personnel safeguard quality in steel construction and ensure the requirements of the subsequent coating. Coatings are inspected for layer thickness and quality, and plates are ground and measured after cutting.

EvidenceLeipzig
In-house inspection personnel

History

  1. Over 33 years of experience in tower manufacturing; a partner of the energy transition for more than 30 years.

  2. To date, 4,690 towers delivered to 28 delivery countries.