Planning, construction, operation and maintenance of ground-mounted PV systems with regional citizen participation.

Solavest GmbH
MunichNew on Amplifa
About Solavest
Solavest GmbH, based in Munich, realizes ground-mounted photovoltaic systems with a regional focus and supports the projects throughout their entire life cycle – from site assessment and planning through construction, operation and maintenance to complete decommissioning. The projects are characterized by minimal soil sealing: at most 0.5% of the area is permanently fixed to the ground, while the rest is greened with local meadows, shrubs and trees. The areas are partially used for grazing with sheep. Citizens, municipalities, local trades businesses and landowners are involved; municipalities receive tax revenue through local project companies and a share of the electricity revenue. Suitable areas start at approximately 5 hectares, including along highways and rail lines, conversion sites and areas in disadvantaged regions. Since 2018, systems ranging from 750 kWp to 12.6 MWp have been commissioned, including in Seedorf, Geisling, Scharenstetten and Peising. Solavest is a member of the German Solar Association (Bundesverband Solarwirtschaft) and serves customers in Germany.
- Site
- Munich
- Processes
- Planning, construction, operation and maintenance of ground-mounted PV systems, Citizen participation in projects, Site assessment/leasing for landowners, Complete decommissioning of the systems, Land use with sheep grazing/pastoral farming
- Certificates
- ISO 9001, ISO 14001, ISO 45001, ISO 50001
- Industries
- Renewable Energies, Photovoltaics
- 01
Site assessment/leasing
- 02
Planning and permitting
- 03
Construction of the ground-mounted PV system
- 04
Operation and maintenance
- 05
Decommissioning of the system
Location
Munich
DEHeadquarters
Project Profile



Inside the production







Industries
Additional services
Quality and Sustainability
The systems are operated with a maximum of 0.5% soil sealing, local greening without pesticides or synthetic fertilizers, and grazing management; after complete decommissioning, natural land remains.
| Evidence | Munich |
|---|---|
| ISO 9001 | |
| ISO 14001 | |
| ISO 45001 | |
| ISO 50001 |
Project History
- 2018
Commissioning of Seedorf I (750 kWp) in June 2018 and Poign I (750 kWp) in July 2018
- 2020
Operation of Altwiesen (1.4 MWp) since September 2020; commissioning of Peising (1.2 MWp) in December 2020; construction and commissioning of Seedorf II (750 kWp) in June 2020
- 2022
Commissioning of Seedorf III (3.9 MWp) at the end of June 2022
- 2023
Commissioning of Geisling I (12.6 MWp) in May 2023; operation of Altwiesen II (1.9 MWp) since December 2023
- 2024
Operation of Scharenstetten (3.3 MWp) since November 2024
- 2025
Commissioning of Peising II (1.1 MWp) since February 2025