Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Suatec Automation – Fertigung

Service provider for electrical engineering, automation, functional safety, control cabinet construction coordination and plant service

Suatec Automation Logo

SUATEC Automation GmbH

Kölln-ReisiekNew on Amplifa

2024Founded
11Employees
Kölln-Reisiek (DE)Location
HRB 18280 HL, AG LübeckCommercial Register

About Suatec Automation

SUATEC Automation GmbH, based in Kölln-Reisiek near Elmshorn, was founded in 2024 and is part of the Bodo Wascher Group. The eleven-member team has been working together for many years and offers services in the areas of consulting, engineering, project management, installation as well as maintenance and service. The service portfolio includes the design of complex switchgear systems with E-Plan P8, COMOS and Engineering Base, SPS/PLC programming in SIMATIC S7/TIA Portal including failsafe Distributed Safety solutions, control systems with PCS7 and WinCC, functional safety in accordance with IEC 61511 and ISO 13849-1, as well as ATEX-compliant explosion protection. In addition, the company coordinates control cabinet construction (together with its sister company SUATEC GmbH, approx. 2,000 m² of production space), undertakes retrofit projects from SIMATIC S5 to S7/TIA, installs switchgear and cable trays, performs DGUV V3 inspections, and provides 24/7 on-call service and remote maintenance. Customers include municipal water management and industrial automation companies; reference projects include the modernization of the Kornmasch stormwater retention basin in Bückeburg and the Energy Bunker in Hamburg-Wilhelmsburg.

Site
Kölln-Reisiek
Processes
Electrical engineering / switchgear configuration (E-Plan P8, COMOS, Engineering Base), Digitalization of electrical documentation, Control cabinet construction coordination, PLC programming (SIMATIC S7/TIA Portal, Distributed Safety, F-Systems), Control systems PCS7 / WinCC visualization (APL), Functional safety according to IEC 61511 / ISO 13849-1 (hazard analyses, SRS, SIL assessments), Explosion protection planning (ATEX, Ex i, Ex e, Ex d), control cabinets for explosion-hazard areas, Retrofit/modernization (SIMATIC S5 to S7/TIA)
Materials
SIMATIC S7 / TIA Portal, PCS7 / WinCC, E-Plan P8, COMOS, Engineering Base, Explosion protection Ex i / Ex e / Ex d, Functional Safety IEC 61511 / ISO 13849-1
Founded
2024
Employees
11
Industries
Municipal water management/wastewater, Industrial automation, Process engineering
  1. 01

    Consulting and technical planning

  2. 02

    Project management and site management

  3. 03

    Electrical engineering

  4. 04

    Control cabinet construction coordination

  5. 05

    PLC and control system programming

  6. 06

    Installation and assembly

  7. 07

    Commissioning

  8. 08

    Service, maintenance and remote maintenance

Processes and Systems

S7/TIA

SIMATIC S7 / TIA Portal

Programming and configuration of plants including failsafe Distributed Safety solutions.

PCS7

PCS7 / WinCC

Creation of PCS7 system architectures and visualizations based on APL.

E-Plan P8

E-Plan P8, COMOS, Engineering Base

Planning and configuration of complex switchgear systems for new and existing plants.

ATEX

Explosion protection Ex i / Ex e / Ex d

ATEX-compliant planning and standards-compliant control cabinets for explosion-hazard areas.

IEC 61511

Functional Safety IEC 61511 / ISO 13849-1

Hazard analyses, SRS creation and SIL assessments with Functional Safety Management.

Location

Standort Kölln-Reisiek

Kölln-Reisiek

DE

Headquarters, engineering and service

  • E-Plan P8
  • COMOS
  • Engineering Base
  • SIMATIC S7/TIA Portal

Services

Switchgear design
Switchgear designEngineering · Electrical engineering
PLC programming
PLC programmingAutomation · Plant engineering
Plant cabling
Plant cablingInstallation · Industrial plants
Process control visualization
Process control visualizationPCS7/WinCC · Process industry

Inside the production

Engineering and electrical design
Engineering and electrical design
Technical implementation in plant environments
Technical implementation in plant environments
Service and maintenance of E/I&C systems
Service and maintenance of E/I&C systems

Industries

Municipal water management/wastewaterIndustrial automationProcess engineering

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Electrical engineering / switchgear configuration (E-Plan P8, COMOS, Engineering Base)Engineering–––––
Digitalization of electrical documentationEngineering–––––
Control cabinet construction coordinationAssembly–––––
PLC programming (SIMATIC S7/TIA Portal, Distributed Safety, F-Systems)Engineering–––––
Control systems PCS7 / WinCC visualization (APL)Engineering–––––
Functional safety according to IEC 61511 / ISO 13849-1 (hazard analyses, SRS, SIL assessments)Engineering–––––
Explosion protection planning (ATEX, Ex i, Ex e, Ex d), control cabinets for explosion-hazard areasEngineering–––––
Retrofit/modernization (SIMATIC S5 to S7/TIA)Engineering–––––
Project management/site management/construction supervision/procurement supportEngineering–––––
Assembly–––––
Inspection–––––
Process engineering: plant construction and retrofitting (planning through implementation)Engineering–––––
Control cabinet / control panel construction (terminal boxes to complex switchgear systems)Assembly–––––
Instrumentation & control and automation technology for process plantsEngineering–––––
Engineering–––––
Assembly–––––
Installation, commissioning, maintenance and internal cleaning of process plantsAssembly–––––

Additional services

Project management/project leadershipSite management and construction supervisionElectrical engineering (E-Plan P8, COMOS, Engineering Base)Digitalization of electrical documentationControl cabinet construction coordinationPLC programming (SIMATIC S7/TIA Portal)Failsafe Distributed Safety solutionsControl systems PCS7 and WinCC visualizationFunctional safety (IEC 61511, ISO 13849-1, SIL assessments)Explosion protection (ATEX, Ex i, Ex e, Ex d)Retrofit and modernization (S5 to S7/TIA)Installation (switchgear, cable trays, plant cabling)Pneumatic piping and hosingInspections of secondary/protection technology and generator protectionDGUV V3 inspectionsMaintenance and support of control systems24/7 on-call service and remote maintenanceCustomer staff training

Reference customers

History

  1. 2024

    Foundation of SUATEC Automation GmbH as a company of the Bodo Wascher Group based in Kölln-Reisiek; continuation of the established team collaboration under the new brand.

  2. 2025

    Modernization of the control and automation technology at the Kornmasch stormwater retention basin of the wastewater utility of the city of Bückeburg, including commissioning during ongoing operation.

Personalised demo

Ready to see Amplifa Marketplace in action?

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — in one place for industrial companies across the DACH region.

Request a demo