Commissioning and service for gas turbine, HRSG and industrial plants worldwide
Torsten Kühn – Senior Commissioning Engineer
GermanyNew on Amplifa
About Tekabyte
Tekabyte is the profile of Torsten Kühn, Senior Commissioning Engineer for Power Generation and Electrical & Instrumentation with more than 20 years of international site experience. Activities include the commissioning of gas turbine power plants (Siemens SGT-800), HRSG and gas-fired boiler plants as well as the commissioning of I&C systems including loop checks and functional tests. Further services include cold and hot commissioning, electrical supervision up to 36 kV, troubleshooting, system optimization and interface coordination between EPC, operator and subcontractors. Technical work is performed with systems such as ABB 800xA, Siemens S7/TIA Portal and WinCC as well as engineering tools such as CODESYS, EPLAN P8 and Zuken E3.series. Projects have been realized, among others, in Germany, Sweden, Brazil and Algeria; availability is worldwide on a rotation model. The sole proprietorship is based in Germany.
- Site
- Germany
- Processes
- Gas Turbine Commissioning (SGT-800), HRSG & Gas-Fired Boilers (Commissioning), I&C Systems (Commissioning), Loop Checks & Functional Testing, Cold & Hot Commissioning, Electrical Supervision up to 36 kV, Troubleshooting & System Optimization, Interface Coordination (EPC / Operator / Subcontractors)
- Materials
- ABB 800xA, Siemens S7 / TIA Portal, Siemens WinCC, CODESYS, EPLAN P8, Zuken E3.series
- Industries
- Power generation, Industrial plants, Pharmaceuticals
- 01
Interface coordination (EPC/operator/subcontractors)
- 02
Loop checks & functional tests
- 03
Cold & hot commissioning
- 04
Electrical supervision up to 36 kV
- 05
Troubleshooting & system optimization
Systems & Tools
ABB 800xA
DCS/SCADA system for control system commissioning in power plant and industrial plants.
Siemens S7 / TIA Portal
PLC platform for programming and commissioning of I&C systems.
Siemens WinCC
Visualization system for process control systems and operator interfaces.
CODESYS
Engineering software per IEC 61131 for control projects.
EPLAN P8
E-CAD software for electrical documentation and circuit diagram creation.
Zuken E3.series
E-CAD software for electrical engineering.
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Gas Turbine Commissioning (SGT-800)Engineering | – | – | – | – | – |
| HRSG & Gas-Fired Boilers (Commissioning)Engineering | – | – | – | – | – |
| I&C Systems (Commissioning)Engineering | – | – | – | – | – |
| Loop Checks & Functional TestingTesting | – | – | – | – | – |
| Cold & Hot CommissioningEngineering | – | – | – | – | – |
| Electrical Supervision up to 36 kVInstallation | – | – | – | – | – |
| Troubleshooting & System OptimizationEngineering | – | – | – | – | – |
| Interface Coordination (EPC / Operator / Subcontractors)Engineering | – | – | – | – | – |
6 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| DCS/SCADA system | ABB 800xA | – | – | – | – |
| PLC | Siemens S7 / TIA Portal | – | – | – | – |
| Visualization system | Siemens WinCC | – | – | – | – |
| Engineering software (IEC 61131) | CODESYS | – | – | – | – |
| E-CAD software | EPLAN P8 | – | – | – | – |
| E-CAD software | Zuken E3.series | – | – | – | – |
Additional services
Project History
- 2013
Project in a nuclear environment, Sweden
- 2014
Pharmaceutical plant, Brazil
- 2019
Industrial plant, Algeria
- 2023
Dual SGT-800 power plant, Germany
- 2023
Start of the phosphorus recovery plant project, Germany (until 2025)