Operator of the 877 km long Trans Adriatic Pipeline for gas transport from Greece via Albania to Italy.
Trans Adriatic Pipeline (TAP) AG
Baar · Athens · Thessaloniki · Kipoi · Tirana · Melendugno · RomeNew on Amplifa
About TAP
Trans Adriatic Pipeline (TAP) AG operates an 877-kilometre-long natural gas pipeline that connects to the Trans Anatolian Pipeline (TANAP) at Kipoi on the Greek-Turkish border, runs through northern Greece and Albania, crosses the Adriatic Sea and is connected in southern Italy to the Italian gas grid operated by SNAM Rete Gas. The company is a Transmission System Operator (TSO) and Independent Transmission Operator (ITO) and provides shippers with transport capacity. TAP is the European section of the Southern Gas Corridor and transports natural gas from the Shah Deniz II field in Azerbaijan to Europe. Design capacity exceeds 20 billion cubic metres per year; an additional long-term capacity of 1.2 billion cubic metres has been announced. The company is headquartered in Baar, Switzerland, and has offices in Athens, Thessaloniki, Kipoi, Tirana, Melendugno and Rome.
- Site
- Baar
- Processes
- Gas transport / capacity allocation (forward firm & interruptible capacity), Commercial reverse capacity, Market tests for shippers
- Certificates
- OGMP 2.0 Gold Standard Reporting, OGMP 2.0 Gold Standard
- Employees
- 130+
- Industries
- Oil and Gas, Natural Gas Pipeline / Energy Infrastructure, Energy Security / Diversification of Europe's Gas Supply
- 01
Connection to TANAP in Kipoi
- 02
Gas transport through northern Greece and Albania
- 03
Adriatic Sea crossing
- 04
Landfall in southern Italy
- 05
Feed-in to the SNAM Rete Gas grid
Locations
Baar
CHHeadquarters
Athens
GROffice
Thessaloniki
GROffice
Kipoi
GROffice at TANAP connection point
Tirana
ALOffice
Melendugno
ITOffice at pipeline landfall point
Rome
ITOffice
Industries
Additional services
Reference customers
Quality & Sustainability
TAP has achieved Gold Standard Reporting under the UNEP OGMP 2.0 initiative, thereby demonstrating the quality of its methane emissions reporting.
| Evidence | Baar |
|---|---|
| OGMP 2.0 Gold Standard |
History
Commissioning of the 877 km pipeline: connection to TANAP in Kipoi, route through northern Greece, Albania and across the Adriatic to southern Italy with connection to SNAM Rete Gas
- 2026
Announcement of additional long-term capacity of 1.2 bn. m³
- 2026
TAP achieves Gold Standard Reporting under UNEP OGMP 2.0